| 1 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$105,332.00 |
$80,000.00 |
$123,600.00 |
| 2 | 221(C) 2801 |
TEMPORARY SILT FENCE | 500 | LF |
$2.12 |
$1.50 |
$3.10 |
| 3 | 221(F) 0100 |
TEMPORARY SILT DIKE | 455 | LF |
$9.28 |
$8.00 |
$8.20 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 35,487 | SY |
$1.44 |
$1.25 |
$1.50 |
| 5 | 233(A) 2817 |
VEGETATIVE MULCHING | 7.33 | AC |
$400.00 |
$400.00 |
$412.00 |
| 6 | 307(A) 4200 |
FLY ASH | 3,054.51 | TON |
$72.66 |
$84.00 |
$82.40 |
| 7 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 56,561.01 | SY |
$3.84 |
$2.50 |
$3.10 |
| 8 | 311(D) 0154 |
PROCESSING EXISTING BASE & SURFACE, METHOD D | 21,109.13 | LF |
$5.79 |
$4.50 |
$5.00 |
| 9 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 856 | TON |
$48.00 |
$50.00 |
$50.40 |
| 10 | 407(B) 0250 |
TACK COAT | 2,595.17 | GAL |
$3.40 |
$3.00 |
$4.50 |
| 11 | 408 5774 |
PRIME COAT | 18,165.67 | GAL |
$5.63 |
$3.00 |
$4.50 |
| 12 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 11,626.39 | TON |
$82.00 |
$84.00 |
$84.25 |
| 13 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 5,813.14 | TON |
$92.00 |
$94.00 |
$99.40 |
| 14 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 32 | LF |
$131.60 |
$115.00 |
$128.75 |
| 15 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 222 | LF |
$41.05 |
$38.00 |
$25.75 |
| 16 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 160 | LF |
$24.72 |
$38.00 |
$28.85 |
| 17 | 613(L) 4504 |
21" X 15" PREFAB. CULVERT END SECTION, ARCH | 6 | EA |
$201.00 |
$400.00 |
$247.00 |
| 18 | 613(L) 4515 |
28" X 18" PREFAB. CULVERT END SECTION, ARCH | 4 | EA |
$1,200.00 |
$1,300.00 |
$515.00 |
| 19 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 8 | EA |
$784.67 |
$400.00 |
$258.00 |
| 20 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$9,000.00 |
$10,000.00 |
$55,650.00 |
| 21 | 619(C) 0924 |
SAWING PAVEMENT | 44 | LF |
$6.50 |
$3.00 |
$16.85 |
| 22 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 25.54 | SF |
$55.00 |
$40.00 |
$41.00 |
| 23 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 5,589 | LF |
$1.60 |
$2.25 |
$2.30 |
| 24 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$22,330.00 |
$20,000.00 |
$5,150.00 |
| 25 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$29,772.00 |
$41,800.00 |
$42,500.00 |
| 26 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,916.00 |
$20,000.00 |
$20,750.00 |
| 27 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$144,000.00 |
$151,500.00 |
$218,400.00 |