| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$8,000.00 |
$15,000.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$15,000.00 |
$20,000.00 |
$18,600.00 |
| 3 | 210 0121 |
OBLITERATING ABANDONED ROAD | 202 | LF |
$10.00 |
$5.00 |
$4.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,100 | LF |
$2.10 |
$5.00 |
$1.34 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 80 | LF |
$9.00 |
$8.00 |
$8.88 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 2,500 | SY |
$2.75 |
$3.00 |
$4.11 |
| 7 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 350 | CY |
$50.00 |
$55.00 |
$50.00 |
| 8 | 408 5774 |
PRIME COAT | 1,200 | GAL |
$6.00 |
$5.50 |
$5.45 |
| 9 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 323 | TON |
$112.00 |
$150.00 |
$135.45 |
| 10 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 207 | TON |
$115.00 |
$165.00 |
$146.45 |
| 11 | 509(A) 0319 |
CLASS AA CONCRETE | 114.34 | CY |
$475.00 |
$700.00 |
$600.00 |
| 12 | 509(B) 0321 |
CLASS A CONCRETE | 24.4 | CY |
$500.00 |
$950.00 |
$700.00 |
| 13 | 511(A) 0332 |
REINFORCING STEEL | 22,700.6 | LB |
$1.00 |
$1.00 |
$1.00 |
| 14 | 613(C) 5206 |
21" X 15" PRECOATED CORR. STL. PIPE ARCH | 54 | LF |
$50.00 |
$35.00 |
$40.00 |
| 15 | 613(L) 4504 |
21" X 15" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$250.00 |
$250.00 |
$100.00 |
| 16 | 619(B) 4791 |
REMOVAL OF CURB | 48 | LF |
$10.00 |
$10.00 |
$26.00 |
| 17 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 143.75 | LF |
$20.00 |
$25.00 |
$17.00 |
| 18 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,500.00 |
$2,000.00 |
$1,800.00 |
| 19 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,200.00 |
$2,300.00 |
$2,200.00 |
| 20 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 1,342.3 | CY |
$30.00 |
$12.00 |
$8.00 |
| 21 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 168.36 | LF |
$76.00 |
$125.00 |
$85.00 |
| 22 | 509(A) 1326 |
CLASS AA CONCRETE | 237.7 | CY |
$500.00 |
$650.00 |
$600.00 |
| 23 | 511(A) 1332 |
REINFORCING STEEL | 44,259 | LB |
$1.00 |
$1.00 |
$1.00 |
| 24 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$25,000.00 |
$5,000.00 |
$18,000.00 |
| 25 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$3,000.00 |
$2,200.00 |
| 26 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$12,000.00 |
$3,500.00 |
$7,000.00 |
| 27 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,000.00 |
$2,000.00 |
$3,500.00 |
| 28 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$40,000.00 |
$15,000.00 |
$50,000.00 |