| 1 | 202(D) 0184 |
UNCLASSIFIED BORROW | 4,093 | CY |
$8.50 |
$8.50 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$40,000.00 |
$40,000.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,500 | LF |
$2.75 |
$4.00 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,344 | LF |
$8.50 |
$10.00 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 24,656 | SY |
$3.75 |
$2.88 |
| 6 | 230(F) 2812 |
WATERING | 986 | KGAL |
$8.00 |
$15.00 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 5.1 | AC |
$1,200.00 |
$488.00 |
| 8 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 93,488 | SY |
$5.25 |
$6.56 |
| 9 | 311(D) 0154 |
PROCESSING EXISTING BASE & SURFACE, METHOD D | 31,784 | LF |
$7.50 |
$7.68 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 247 | TON |
$55.00 |
$55.00 |
| 11 | 407(B) 0250 |
TACK COAT | 4,593 | GAL |
$3.50 |
$2.79 |
| 12 | 408 5774 |
PRIME COAT | 33,655 | GAL |
$3.75 |
$3.66 |
| 13 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 20,979 | TON |
$94.50 |
$87.87 |
| 14 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 10,135 | TON |
$98.50 |
$92.03 |
| 15 | 413(B) 4862 |
RUMBLE STRIP-METHOD HMA-CYC GROUP | 8 | EAGP |
$625.00 |
$755.00 |
| 16 | 504 6179 |
BRIDGE TRAFFIC RAIL | 148 | LF |
$115.00 |
$200.00 |
| 17 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$375.00 |
$375.00 |
| 18 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 500 | LF |
$6.00 |
$6.00 |
| 19 | 619(C) 0924 |
SAWING PAVEMENT | 138 | LF |
$3.50 |
$3.50 |
| 20 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 2,012.5 | LF |
$18.50 |
$17.50 |
| 21 | 623(F) 4447 |
GUARDRAIL ANCHOR UNIT (TYPE B) | 2 | EA |
$1,600.00 |
$825.00 |
| 22 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 12 | EA |
$1,850.00 |
$1,295.00 |
| 23 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 10 | EA |
$2,300.00 |
$2,275.00 |
| 24 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 133.37 | SF |
$52.00 |
$52.00 |
| 25 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 14,770 | LF |
$0.7000 |
$0.8200 |
| 26 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$20,000.00 |
$20,000.00 |
| 27 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$12,000.00 |
$17,700.00 |
| 28 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$10,000.00 |
| 29 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$200,000.00 |
$200,000.00 |