| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$7,500.00 |
$30,884.24 |
$20,000.00 |
$13,906.97 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 4,435 | CY |
$7.00 |
$2.88 |
$17.00 |
$20.24 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,500 | CY |
$10.00 |
$18.61 |
$5.00 |
$33.58 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$2,000.00 |
$22,939.36 |
$45,000.00 |
$15,073.72 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,850 | LF |
$2.00 |
$1.93 |
$1.49 |
$1.89 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 72 | LF |
$8.00 |
$8.75 |
$16.00 |
$8.59 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 7,819 | SY |
$2.00 |
$1.27 |
$1.29 |
$1.26 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 2 | AC |
$500.00 |
$218.90 |
$115.00 |
$218.24 |
| 9 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,200 | CY |
$50.00 |
$44.36 |
$45.00 |
$48.73 |
| 10 | 310(B) 0149 |
SUBGRADE, METHOD B | 4,300 | SY |
$2.00 |
$1.46 |
$4.00 |
$0.8100 |
| 11 | 325 5271 |
SEPARATOR FABRIC | 4,300 | SY |
$2.00 |
$1.38 |
$1.75 |
$1.24 |
| 12 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 180 | TON |
$25.00 |
$32.69 |
$22.00 |
$23.51 |
| 13 | 407(B) 0250 |
TACK COAT | 5,965 | GAL |
$4.00 |
$2.84 |
$2.80 |
$2.83 |
| 14 | 408 5774 |
PRIME COAT | 2,750 | GAL |
$5.00 |
$4.54 |
$2.99 |
$9.00 |
| 15 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 845 | TON |
$82.00 |
$78.81 |
$78.00 |
$74.30 |
| 16 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,060 | TON |
$88.00 |
$82.03 |
$80.00 |
$97.73 |
| 17 | 411(D) 5975 |
SUPERPAVE, TYPE S5(PG 64-22 OK) | 180 | TON |
$150.00 |
$97.65 |
$150.00 |
$110.63 |
| 18 | 509(D) 0325 |
CLASS C CONCRETE | 15 | CY |
$300.00 |
$350.65 |
$650.00 |
$427.73 |
| 19 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 264 | TON |
$50.00 |
$45.51 |
$48.00 |
$43.94 |
| 20 | 609(B) 1513 |
1'-8" COMB. CURB & GUTTER (6" BARRIER) | 834 | LF |
$20.00 |
$22.89 |
$22.00 |
$20.90 |
| 21 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 182 | LF |
$125.00 |
$118.44 |
$71.00 |
$104.72 |
| 22 | 613(A) 0591 |
72" R.C.PIPE CLASS IV | 98 | LF |
$350.00 |
$347.80 |
$410.00 |
$354.93 |
| 23 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 180 | LF |
$30.00 |
$53.17 |
$36.00 |
$55.11 |
| 24 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 100 | LF |
$13.00 |
$9.76 |
$17.00 |
$27.52 |
| 25 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 100 | LF |
$15.00 |
$9.76 |
$14.00 |
$27.52 |
| 26 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 12 | EA |
$300.00 |
$513.38 |
$745.00 |
$1,047.17 |
| 27 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$1,000.00 |
$2,108.96 |
$1,500.00 |
$1,956.55 |
| 28 | 613(L) 5746 |
72" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$3,650.00 |
$8,220.09 |
$3,200.00 |
$4,629.58 |
| 29 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 2 | EA |
$1,750.00 |
$3,326.84 |
$2,200.00 |
$3,313.51 |
| 30 | 613(S) 1186 |
STANDARD BEDDING MATERIAL, CLASS B | 298 | CY |
$33.00 |
$41.79 |
$44.00 |
$39.68 |
| 31 | 613(V) 1180 |
TRENCH EXCAVATION | 592 | CY |
$6.00 |
$16.32 |
$42.00 |
$93.69 |
| 32 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$9,217.44 |
$35,000.00 |
$11,316.16 |
| 33 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 127 | SY |
$20.00 |
$15.80 |
$45.00 |
$18.26 |
| 34 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 2,500 | SY |
$6.00 |
$7.52 |
$4.39 |
$3.36 |
| 35 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 300 | LF |
$20.00 |
$22.00 |
$24.00 |
$21.93 |
| 36 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,500.00 |
$2,915.00 |
$2,800.00 |
$2,906.22 |
| 37 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 3 | EA |
$85.00 |
$110.00 |
$120.00 |
$109.67 |
| 38 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 1 | EA |
$200.00 |
$165.00 |
$180.00 |
$164.50 |
| 39 | 629(C) 4960 |
MAILBOX | 5 | EA |
$32.00 |
$27.50 |
$6.00 |
$27.42 |
| 40 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 5 | EA |
$35.00 |
$11.00 |
$12.00 |
$10.97 |
| 41 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 35.72 | SF |
$20.00 |
$15.40 |
$17.00 |
$15.35 |
| 42 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 77 | LF |
$20.00 |
$6.60 |
$8.00 |
$6.58 |
| 43 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 7,380 | LF |
$0.5000 |
$0.6600 |
$0.6500 |
$0.6600 |
| 44 | 856(B) 8525 |
TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) | 4 | EA |
$150.00 |
$220.00 |
$220.00 |
$219.34 |
| 45 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$7,000.00 |
$6,120.15 |
$3,500.00 |
$3,290.06 |
| 46 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$21,000.00 |
$14,520.00 |
$16,000.00 |
$14,259.11 |
| 47 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,886.00 |
$1,000.00 |
$1,412.95 |
| 48 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$65,000.00 |
$68,495.97 |
$28,000.00 |
$43,790.79 |