| 1 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$39,097.64 |
$60,738.55 |
$28,116.50 |
$143,500.00 |
$58,362.50 |
| 2 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,430.00 |
$8,346.04 |
$20,291.82 |
$17,250.00 |
$21,558.60 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 100 | LF |
$2.10 |
$8.85 |
$1.95 |
$2.00 |
$7.55 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 8,940 | SY |
$2.00 |
$1.39 |
$1.39 |
$1.45 |
$2.85 |
| 5 | 234(A) 2824 |
FERTILIZING (10-20-10) | 0.67 | TON |
$800.00 |
$881.54 |
$881.07 |
$915.00 |
$2,009.71 |
| 6 | 234(A) 4406 |
FERTILIZING (0-46-0) | 0.14 | TON |
$1,000.00 |
$1,141.30 |
$1,762.14 |
$1,150.00 |
$2,009.71 |
| 7 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,615.05 | CY |
$50.00 |
$53.82 |
$57.20 |
$63.80 |
$76.83 |
| 8 | 408 5774 |
PRIME COAT | 1,048.39 | GAL |
$6.50 |
$5.87 |
$13.97 |
$2.75 |
$8.99 |
| 9 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 6,989.28 | SY |
$18.00 |
$17.04 |
$27.55 |
$23.30 |
$29.20 |
| 10 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 1,633.54 | CY |
$105.00 |
$117.15 |
$158.58 |
$105.00 |
$151.63 |
| 11 | 609(A) 0288 |
CONCRETE CURB (6" MNTBLE-INTEGRAL) | 450 | LF |
$25.00 |
$8.49 |
$12.01 |
$17.55 |
$11.37 |
| 12 | 610(C) 0608 |
4" CONCRETE DIVIDING STRIP | 138.86 | SY |
$30.00 |
$40.10 |
$47.19 |
$30.10 |
$40.92 |
| 13 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 190 | LF |
$225.00 |
$47.53 |
$35.59 |
$93.60 |
$47.44 |
| 14 | 613(P) 4571 |
28" X 20" GALV. STEEL CULVERT END SECTION ARCH | 4 | EA |
$30.50 |
$459.57 |
$565.79 |
$550.00 |
$2,155.86 |
| 15 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$2,000.00 |
$5,520.06 |
$3,009.49 |
$6,800.00 |
$48,720.00 |
| 16 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 738.22 | SY |
$7.00 |
$8.30 |
$8.00 |
$20.00 |
$12.18 |
| 17 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 2,804.83 | SY |
$2.00 |
$7.24 |
$2.70 |
$12.00 |
$9.74 |
| 18 | 619(C) 0924 |
SAWING PAVEMENT | 225 | LF |
$4.00 |
$3.53 |
$2.81 |
$5.00 |
$12.18 |
| 19 | 804(A) 2915 |
STRUCTURAL CONCRETE | 1.6 | CY |
$500.00 |
$353.10 |
$352.43 |
$345.00 |
$365.40 |
| 20 | 804(B) 2916 |
REINFORCING STEEL | 192 | LB |
$2.50 |
$2.03 |
$2.00 |
$2.05 |
$1.98 |
| 21 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 22 | EA |
$50.00 |
$52.92 |
$52.86 |
$51.75 |
$52.53 |
| 22 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 197.8 | SF |
$22.00 |
$19.92 |
$19.97 |
$19.55 |
$19.84 |
| 23 | 851(B) 3217 |
2 1/2"@5.79 GALV.STEEL PIPE POST | 60 | LF |
$24.00 |
$16.55 |
$16.45 |
$16.10 |
$16.34 |
| 24 | 851(C) 8324 |
2" SQUARE TUBE POST | 112 | LF |
$8.50 |
$10.58 |
$10.57 |
$10.35 |
$10.51 |
| 25 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 126 | LF |
$8.00 |
$11.69 |
$11.75 |
$11.50 |
$11.67 |
| 26 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 18,261 | LF |
$1.05 |
$0.3100 |
$0.3100 |
$0.3000 |
$0.3000 |
| 27 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 2,290 | LF |
$0.9300 |
$0.7100 |
$0.7000 |
$0.7000 |
$0.7000 |
| 28 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 1,900 | LF |
$1.25 |
$0.9400 |
$0.9400 |
$0.9500 |
$0.9300 |
| 29 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 215 | LF |
$2.10 |
$3.50 |
$3.52 |
$3.45 |
$3.50 |
| 30 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 39 | EA |
$75.00 |
$211.15 |
$211.46 |
$210.00 |
$210.11 |
| 31 | 856(B) 8880 |
TRAFFIC STRIPE(MULTI-POLY.)(WORDS) | 6 | EA |
$80.00 |
$233.97 |
$234.95 |
$230.00 |
$233.45 |
| 32 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 20,000 | LF |
$0.2700 |
$0.2600 |
$0.2600 |
$0.2500 |
$0.2600 |
| 33 | 857(F) 8007 |
PAVEMENT MARKING REMOVAL(ARROWS) | 11 | EA |
$5.00 |
$75.74 |
$76.36 |
$75.00 |
$75.87 |
| 34 | 880(G) 8900 |
TUBE CHANNELIZERS | 302 | EA |
$85.00 |
$72.80 |
$72.84 |
$71.50 |
$72.37 |
| 35 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$15,265.26 |
$15,271.92 |
$31,300.00 |
$15,174.25 |
| 36 | 890 7700 |
(PL)TRAFFIC ITEMS | 1 | LSUM |
$5,000.00 |
$5,518.32 |
$5,521.39 |
$5,400.00 |
$5,486.08 |