| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 500 | CY |
$4.00 |
$11.00 |
| 2 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$2,500.00 |
$8,830.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 464 | LF |
$3.25 |
$2.00 |
| 4 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 1 | EA |
$100.00 |
$138.00 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 1,765 | SY |
$2.00 |
$1.50 |
| 6 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,635 | CY |
$30.00 |
$46.00 |
| 7 | 307(D) 4230 |
LIME | 51 | TON |
$170.00 |
$166.00 |
| 8 | 307(H) 4270 |
LIME STABILIZED SUBGRADE | 3,409 | SY |
$3.00 |
$4.40 |
| 9 | 317 4270 |
CEMENT TREATED BASE | 500 | SY |
$3.00 |
$14.30 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 50 | TON |
$30.00 |
$38.00 |
| 11 | 408 5774 |
PRIME COAT | 1,852 | GAL |
$5.00 |
$5.30 |
| 12 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 480 | TON |
$76.00 |
$92.00 |
| 13 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 980 | SY |
$18.85 |
$12.40 |
| 14 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 1,852 | SY |
$20.00 |
$20.00 |
| 15 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 678 | CY |
$70.00 |
$129.00 |
| 16 | 609(A) 0300 |
CONCRETE CURB (6" BARRIER-INTEGRAL) | 359 | LF |
$12.17 |
$11.00 |
| 17 | 609(A) 0380 |
CONCRETE CURB (8" BARRIER-INTEGRAL) | 1,130 | LF |
$4.87 |
$11.20 |
| 18 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 874 | SY |
$43.71 |
$32.30 |
| 19 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 74 | SF |
$25.38 |
$60.00 |
| 20 | 611(A) 2657 |
MANHOLE (4' DIAMETER) | 1 | EA |
$1,534.45 |
$12,000.00 |
| 21 | 616(B) 5220 |
3" POLYVINYL CHLORIDE (PVC) PIPE | 150 | LF |
$20.00 |
$26.50 |
| 22 | 616(B) 5221 |
4" POLYVINYL CHLORIDE (PVC) PIPE | 100 | LF |
$23.00 |
$22.00 |
| 23 | 616(B) 5223 |
6" POLYVINYL CHLORIDE (PVC) PIPE | 725 | LF |
$26.00 |
$8.00 |
| 24 | 648(B) 0200 |
(SP)PORT OF ENTRY FACILITY | 1 | LSUM |
$2,443,566.00 |
|
| 25 | 802(B) 8350 |
4" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 50 | LF |
$8.50 |
$22.00 |
| 26 | 803(A) 8065 |
PULL BOX(SIZE I) | 3 | EA |
$240.00 |
$552.00 |
| 27 | 804(A) 2915 |
STRUCTURAL CONCRETE | 3 | CY |
$488.82 |
$221.00 |
| 28 | 804(B) 2916 |
REINFORCING STEEL | 390 | LB |
$1.71 |
$1.10 |
| 29 | 834(C) 8358 |
(SP)UNDERGROUND COMMUNICATION CABLE | 200 | LF |
$3.00 |
$5.50 |
| 30 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 87 | SF |
$15.96 |
$11.00 |
| 31 | 850(B) 8112 |
EXTRUDED ALUMINUM PANEL SIGNS | 77 | SF |
$25.79 |
$24.30 |
| 32 | 851(A) 3206 |
4"@13 GALV.STEEL WIDE FLANGE BEAM POST | 100 | LF |
$45.00 |
$33.00 |
| 33 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 182 | LF |
$11.54 |
$8.80 |
| 34 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 440 | LF |
$1.50 |
$1.10 |
| 35 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 127 | LF |
$9.00 |
$4.40 |
| 36 | 855(B) 8824 |
TRAFFIC STRIPE(PLASTIC)(SYMBOLS) | 2 | EA |
$619.57 |
$110.00 |
| 37 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$1,800.00 |
| 38 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$30,000.00 |
| 39 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$9,000.00 |
| 40 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$34,400.00 |
$155,000.00 |