| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$9,502.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 805 | CY |
$15.00 |
$7.00 |
$18.89 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 908 | CY |
$25.00 |
$16.00 |
$28.06 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$8,000.00 |
$5,381.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,609 | LF |
$2.50 |
$3.00 |
$6.07 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 176 | LF |
$8.00 |
$9.50 |
$4.37 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 2,658 | SY |
$2.00 |
$1.33 |
$1.48 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.22 | AC |
$750.00 |
$195.00 |
$217.00 |
| 9 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,171 | TON |
$30.00 |
$20.00 |
$21.45 |
| 10 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 40 | LF |
$40.00 |
$40.00 |
$57.60 |
| 11 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 40 | LF |
$50.00 |
$80.00 |
$91.60 |
| 12 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 4 | EA |
$1,500.00 |
$1,250.00 |
$2,757.00 |
| 13 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$4,000.00 |
$2,000.00 |
$8,132.00 |
| 14 | 508 6359 |
PRECAST ARCH CULVERT | 30 | LF |
$4,500.00 |
$6,500.00 |
$4,841.80 |
| 15 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 320 | TON |
$30.00 |
$28.00 |
$29.00 |
| 16 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 21 | TON |
$25.00 |
$42.00 |
$122.00 |
| 17 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$7,000.00 |
$6,294.00 |
| 18 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 225 | LF |
$35.00 |
$23.25 |
$25.90 |
| 19 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,500.00 |
$1,800.00 |
$2,005.00 |
| 20 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$2,500.00 |
$3,125.00 |
$3,481.00 |
| 21 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$20,000.00 |
$21,389.00 |
| 22 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 6,277 | CY |
$5.00 |
$7.00 |
$12.46 |
| 23 | 202(C) 0182 |
ROCK EXCAVATION | 200 | CY |
$10.00 |
$35.00 |
$70.70 |
| 24 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$20,000.00 |
$15,373.00 |
| 25 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,394 | LF |
$2.00 |
$3.00 |
$6.07 |
| 26 | 221(F) 0100 |
TEMPORARY SILT DIKE | 488 | LF |
$6.00 |
$9.50 |
$4.36 |
| 27 | 230(A) 2806 |
SOLID SLAB SODDING | 16,543 | SY |
$1.50 |
$1.33 |
$1.48 |
| 28 | 233(A) 2817 |
VEGETATIVE MULCHING | 3.42 | AC |
$350.00 |
$195.00 |
$217.00 |
| 29 | 303(B) 2110 |
AGGREGATE BASE TYPE B | 1,073 | CY |
$40.00 |
$40.00 |
$42.80 |
| 30 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 221 | TON |
$20.00 |
$22.00 |
$39.32 |
| 31 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,208 | TON |
$65.00 |
$77.21 |
$90.41 |
| 32 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 978 | TON |
$75.00 |
$84.51 |
$98.22 |
| 33 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 48 | CY |
$12.00 |
$110.00 |
$13.90 |
| 34 | 509(B) 0321 |
CLASS A CONCRETE | 78 | CY |
$300.00 |
$550.00 |
$459.90 |
| 35 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$250.00 |
$500.00 |
$580.40 |
| 36 | 511(A) 0332 |
REINFORCING STEEL | 10,780 | LB |
$0.8500 |
$1.00 |
$0.9300 |
| 37 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 235 | LF |
$25.00 |
$40.00 |
$57.80 |
| 38 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 10 | EA |
$750.00 |
$1,250.00 |
$2,752.00 |
| 39 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$2,500.00 |
$3,500.00 |
$35,871.00 |
| 40 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 1 | EA |
$200.00 |
$200.00 |
$206.00 |
| 41 | 629(C) 4960 |
MAILBOX | 2 | EA |
$30.00 |
$100.00 |
$28.00 |
| 42 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 2 | EA |
$15.00 |
$50.00 |
$17.00 |
| 43 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 229 | CY |
$16.00 |
$30.00 |
$39.50 |
| 44 | 508 6359 |
PRECAST ARCH CULVERT | 60 | LF |
$2,500.00 |
$7,500.00 |
$5,492.00 |
| 45 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,076 | TON |
$30.00 |
$28.00 |
$28.90 |
| 46 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 198 | TON |
$20.00 |
$27.00 |
$13.50 |
| 47 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$14,148.00 |
| 48 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 350 | LF |
$15.00 |
$23.25 |
$25.90 |
| 49 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,100.00 |
$1,800.00 |
$2,005.00 |
| 50 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 9,908 | LF |
$0.7500 |
$0.2500 |
$0.7200 |
| 51 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$3,000.00 |
$3,750.00 |
$4,177.00 |
| 52 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$5,000.00 |
$11,140.00 |
| 53 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$6,000.00 |
$11,140.00 |
| 54 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$67,240.00 |
$80,000.00 |
$94,690.00 |