| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$3,000.00 |
$7,000.00 |
$7,500.00 |
$10,000.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$70,000.00 |
$50,000.00 |
$75,000.00 |
$100,000.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,000 | LF |
$2.50 |
$1.55 |
$1.85 |
$2.00 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 400 | LF |
$7.00 |
$6.00 |
$7.40 |
$6.60 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 4,500 | SY |
$3.00 |
$1.80 |
$2.24 |
$2.45 |
| 6 | 232(B) 2814 |
SEEDING METHOD B | 0.6 | AC |
$3,000.00 |
$500.00 |
$500.00 |
$600.00 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.2 | AC |
$1,000.00 |
$600.00 |
$600.00 |
$450.00 |
| 8 | 402(A) 0217 |
TRAFFIC BOUND SURFACE COURSE TYPE A | 1,353 | TON |
$40.00 |
$38.00 |
$38.91 |
$55.00 |
| 9 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$350.00 |
$250.00 |
$250.00 |
$326.00 |
| 10 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 54 | LF |
$35.00 |
$35.00 |
$26.50 |
$50.00 |
| 11 | 613(B) 0696 |
60" CORR. GALV. STEEL PIPE | 120 | LF |
$65.00 |
$75.00 |
$100.00 |
$175.00 |
| 12 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$1,500.00 |
$2,000.00 |
$1,200.00 |
$1,650.00 |
| 13 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 180 | CY |
$15.00 |
$15.00 |
$7.50 |
$18.00 |
| 14 | 501(F) 6352 |
GRANULAR BACKFILL | 66 | CY |
$50.00 |
$60.00 |
$65.00 |
$41.00 |
| 15 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 716 | LF |
$210.00 |
$192.00 |
$182.00 |
$191.00 |
| 16 | 504(C) 6250 |
SEALED EXPANSION JOINT | 58.34 | LF |
$250.00 |
$500.00 |
$265.00 |
$298.00 |
| 17 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 536 | LF |
$70.00 |
$70.00 |
$79.00 |
$84.00 |
| 18 | 506(A) 1322 |
STRUCTURAL STEEL | 6,050 | LB |
$3.00 |
$2.25 |
$2.85 |
$3.10 |
| 19 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 12 | EA |
$1,200.00 |
$750.00 |
$1,075.00 |
$1,114.00 |
| 20 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 12 | EA |
$1,200.00 |
$750.00 |
$1,075.00 |
$1,114.00 |
| 21 | 509(A) 1326 |
CLASS AA CONCRETE | 219.2 | CY |
$475.00 |
$605.00 |
$580.00 |
$654.00 |
| 22 | 509(B) 1328 |
CLASS A CONCRETE | 61.2 | CY |
$475.00 |
$605.00 |
$595.00 |
$939.00 |
| 23 | 511(A) 1332 |
REINFORCING STEEL | 59,390 | LB |
$0.9000 |
$0.9400 |
$0.9400 |
$0.8000 |
| 24 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 172 | LF |
$31.50 |
$85.00 |
$43.40 |
$42.00 |
| 25 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 406 | LF |
$38.00 |
$51.00 |
$53.20 |
$50.00 |
| 26 | 514(A) 6012 |
PILES, FURNISHED (HP 14X73) | 1,160 | LF |
$48.00 |
$61.50 |
$54.60 |
$64.00 |
| 27 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 172 | LF |
$12.00 |
$7.00 |
$18.60 |
$24.00 |
| 28 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 406 | LF |
$14.00 |
$7.00 |
$22.80 |
$24.00 |
| 29 | 514(B) 6296 |
PILES, DRIVEN (HP 14X73) | 1,160 | LF |
$16.00 |
$8.00 |
$23.40 |
$22.00 |
| 30 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 460 | TON |
$65.00 |
$71.00 |
$70.00 |
$76.00 |
| 31 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 78 | TON |
$60.00 |
$68.00 |
$62.00 |
$34.00 |
| 32 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$5,000.00 |
$25,000.00 |
$7,250.00 |
$13,600.00 |
| 33 | 623(F) 6034 |
GUARDRAIL ANCHOR UNIT (TYPE III) | 4 | EA |
$2,500.00 |
$2,300.00 |
$2,520.00 |
$2,100.00 |
| 34 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$3,000.00 |
$3,300.00 |
$4,000.00 |
$3,000.00 |
| 35 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$8,500.00 |
$10,500.00 |
$9,200.00 |
$7,500.00 |
| 36 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,000.00 |
$3,500.00 |
$4,000.00 |
$3,000.00 |
| 37 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$35,000.00 |
$27,500.00 |
$45,000.00 |
$105,200.00 |