PITTSBURG BRIDGE REHABILITATION SH -113: OVER ROCK CREEK, 11.2 MILES NORTH OF US -69. SH-9A: OVER GAINES CREEK, 0.92 MILES EAST OF US -69.

Let date
Thursday, June 21, 2012
Contract
120226
J/P numbers
28195(04)
District
County
Sbr-161b(247)sb
Highway
Limits
PITTSBURG BRIDGE REHABILITATION SH -113: OVER ROCK CREEK, 11.2 MILES NORTH OF US -69. SH-9A: OVER GAINES CREEK, 0.92 MILES EAST OF US -69.
Project number
SBR-161C(246)SB

Bidders 5

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$2,895,716
1 C-GAWF CONSTRUCTION, INC. Low bidder $2,376,240 -17.9%
2 MANHATTAN ROAD & BRIDGE COMPANY, LLC $2,654,388 -8.3% +11.7%
3 WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES $2,683,904 -7.3% +12.9%
4 SCR CONSTRUCTION CO., INC. $3,273,881 +13.1% +37.8%
5 MERIDIAN CONTRACTING, INC. $3,583,617 +23.8% +50.8%

Bid tab: unit prices 85 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 C-GAWF CONSTRUC…#2 MANHATTAN ROAD …#3 WILDCAT CONSTRU…#4 SCR CONSTRUCTIO…#5 MERIDIAN CONTRA…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $10,000.00 $12,500.00 $10,000.00 $10,000.00 $8,000.00 $50,000.00
2202(D) 0184 UNCLASSIFIED BORROW2,143CY $10.00 $15.00 $12.00 $13.00 $34.00 $34.00
3205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $8,000.00 $2,500.00 $15,000.00 $3,850.00 $6,000.00 $5,000.00
4221(C) 2801 TEMPORARY SILT FENCE1,233LF $3.50 $2.10 $2.50 $1.85 $1.85 $2.00
5221(F) 0100 TEMPORARY SILT DIKE72LF $10.00 $9.35 $9.00 $9.85 $8.95 $9.00
6230(A) 2806 SOLID SLAB SODDING2,159SY $5.00 $3.75 $5.50 $1.95 $1.95 $2.00
7303(A) 2100 AGGREGATE BASE TYPE A386CY $65.00 $49.00 $50.00 $63.00 $68.00 $40.00
8402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E41TON $40.00 $47.80 $35.00 $50.00 $200.00 $82.00
9408 5774 PRIME COAT430GAL $6.00 $4.40 $4.00 $4.00 $4.00 $4.00
10411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)220TON $90.00 $138.43 $95.00 $125.85 $135.00 $126.00
11411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)255TON $120.00 $142.29 $110.00 $129.35 $140.00 $130.00
12412 5267 COLD MILLING PAVEMENT533SY $16.00 $12.87 $12.00 $11.70 $8.00 $10.00
13509(D) 0325 CLASS C CONCRETE11CY $600.00 $300.00 $575.00 $750.00 $800.00 $348.00
14619(B) 4780 REMOVAL OF GUARDRAIL582LF $8.00 $3.00 $2.75 $1.00 $3.00 $2.00
15623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE475LF $20.00 $15.40 $14.75 $14.00 $15.00 $14.00
16623(G) 8571 GUARDRAIL END TREATMENT (GET)8EA $2,500.00 $2,200.00 $2,100.00 $2,000.00 $2,200.00 $2,000.00
17623(I) 8675 GUARDRAIL BRIDGE CONNECTION-TYPE A4EA $2,000.00 $1,430.00 $1,400.00 $1,300.00 $1,500.00 $1,300.00
18501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON60CY $15.00 $20.00 $50.00 $38.00 $50.00 $67.00
19501(G) 6309 CLSM BACKFILL66CY $250.00 $145.00 $110.00 $190.00 $220.00 $162.00
20502 6116 (PL)FALSEWORK JACKING1LSUM $15,000.00 $15,000.00 $30,000.00 $15,000.00 $8,000.00 $60,000.00
21504(A) 1304 APPROACH SLAB187.4SY $300.00 $255.00 $150.00 $210.00 $175.00 $161.00
22504(B) 1305 SAW-CUT GROOVING805.9SY $20.00 $5.00 $4.00 $4.05 $8.00 $5.00
23504(C) 6250 SEALED EXPANSION JOINT86.4LF $300.00 $250.00 $190.00 $350.00 $220.00 $222.00
24504(D) 6245 CONCRETE RAIL (TR4)362.8LF $70.00 $75.00 $65.00 $100.00 $130.00 $68.00
25506(A) 1322 STRUCTURAL STEEL33,480LB $4.00 $3.20 $3.50 $3.20 $3.00 $4.00
26507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY16EA $1,000.00 $885.00 $2,000.00 $2,400.00 $3,000.00 $2,208.00
27507(B) 6176 WEATHERING STEEL EXPANSION BEARING ASSEMBLY6EA $1,000.00 $885.00 $2,000.00 $2,400.00 $3,000.00 $2,208.00
28509(A) 1326 CLASS AA CONCRETE155CY $600.00 $750.00 $575.00 $800.00 $1,400.00 $957.00
29509(B) 1328 CLASS A CONCRETE48.4CY $500.00 $750.00 $1,750.00 $800.00 $1,400.00 $1,822.00
30511(A) 1332 REINFORCING STEEL680LB $1.00 $2.00 $2.00 $1.20 $5.00 $1.50
31511(B) 6010 EPOXY COATED REINFORCING STEEL48,660LB $1.90 $1.35 $1.00 $1.30 $1.00 $1.50
32512(A) 1323 PAINTING EXISTING STRUCTURES1LSUM $50,000.00 $12,250.00 $25,000.00 $10,000.00 $12,000.00 $20,000.00
33512(B) 6303 COLLECTION AND HANDLING OF WASTE1LSUM $10,000.00 $2,000.00 $2,000.00 $1,500.00 $2,000.00 $2,000.00
34514(A) 6011 PILES, FURNISHED (HP 12X53)88LF $65.00 $70.00 $80.00 $55.00 $50.00 $44.00
35514(B) 6294 PILES, DRIVEN (HP 12X53)88LF $25.00 $20.00 $25.00 $46.00 $150.00 $100.00
36515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)428SY $6.00 $5.00 $4.00 $3.60 $5.00 $4.00
37516(A) 6094 DRILLED SHAFTS 48" DIAMETER68LF $400.00 $660.00 $750.00 $770.00 $450.00 $1,125.00
38520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER40LF $30.00 $10.00 $75.00 $76.00 $35.00 $7.00
39520(C) 6060 EPOXY RESIN, ABOVE WATER4GAL $70.00 $125.00 $75.00 $74.00 $60.00 $60.00
40521(A) 6210 PNEUMATICALLY PLACED MORTAR10SY $600.00 $750.00 $1,000.00 $880.00 $1,200.00 $788.00
41601(A) 1351 TYPE I PLAIN RIPRAP700TON $40.00 $36.25 $33.00 $50.00 $120.00 $58.00
42619(B) 2500 REMOVAL OF BRIDGE ITEMS1LSUM $50,000.00 $27,500.00 $150,000.00 $80,000.00 $85,000.00 $100,000.00
43823 8478 (SP)PORTABLE TRAFFIC SIGNAL SYSTEM90SD $150.00 $200.00 $194.73 $190.00 $185.00 $350.00
44855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)3,560LF $1.00 $0.6500 $0.5800 $0.5500 $0.5500 $0.6000
45877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER1,070LF $15.00 $42.00 $17.50 $22.00 $29.00 $38.00
46877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER1,070LF $7.00 $10.00 $4.00 $2.40 $5.00 $2.00
47880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $25,000.00 $8,250.00 $8,000.00 $7,500.00 $12,000.00 $8,000.00
48205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $15,000.00 $3,750.00 $5,000.00 $8,750.00 $6,000.00 $6,000.00
49221(C) 2801 TEMPORARY SILT FENCE3,650LF $2.56 $2.00 $2.25 $1.90 $1.85 $2.00
50221(F) 0100 TEMPORARY SILT DIKE40LF $14.34 $9.00 $10.00 $9.00 $8.95 $9.00
51230(A) 2806 SOLID SLAB SODDING3,200SY $4.00 $3.75 $5.50 $2.00 $1.95 $2.00
52303(A) 2100 AGGREGATE BASE TYPE A2,590CY $39.01 $42.50 $45.00 $63.00 $65.00 $40.00
53411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)1,113TON $300.00 $95.42 $90.00 $87.00 $90.00 $87.00
54412 5267 COLD MILLING PAVEMENT2,187SY $4.00 $5.12 $4.50 $4.70 $7.00 $10.00
55509(D) 0325 CLASS C CONCRETE5CY $500.00 $500.00 $700.00 $1,000.00 $1,100.00 $348.00
56619(B) 4780 REMOVAL OF GUARDRAIL2,900LF $3.50 $2.00 $2.30 $1.00 $1.00 $2.00
57623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE3,000LF $20.00 $15.40 $14.75 $14.00 $14.00 $14.00
58623(G) 8571 GUARDRAIL END TREATMENT (GET)4EA $2,500.00 $2,200.00 $2,100.00 $2,000.00 $2,000.00 $2,000.00
59623(I) 8675 GUARDRAIL BRIDGE CONNECTION-TYPE A4EA $2,000.00 $1,430.00 $1,400.00 $1,300.00 $1,300.00 $1,300.00
60501(G) 6309 CLSM BACKFILL120CY $175.00 $145.00 $105.00 $210.00 $180.52 $162.00
61502 6116 (PL)FALSEWORK JACKING1LSUM $30,000.00 $17,500.00 $60,000.00 $20,500.00 $6,000.00 $120,000.00
62504(A) 1304 APPROACH SLAB143SY $225.00 $255.00 $150.00 $210.00 $141.35 $161.00
63504(B) 1305 SAW-CUT GROOVING2,403.4SY $6.00 $5.05 $4.00 $3.60 $7.00 $4.00
64504(C) 6250 SEALED EXPANSION JOINT63.5LF $250.00 $255.00 $190.00 $350.00 $200.00 $222.00
65504(D) 6245 CONCRETE RAIL (TR4)1,442LF $80.00 $65.00 $65.00 $100.00 $80.00 $68.00
66506(A) 1322 STRUCTURAL STEEL15,130LB $3.50 $4.25 $10.00 $5.00 $5.45 $4.00
67507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY8EA $3,000.00 $885.00 $2,000.00 $2,900.00 $3,972.50 $2,208.00
68507(B) 6176 WEATHERING STEEL EXPANSION BEARING ASSEMBLY8EA $3,000.00 $885.00 $2,000.00 $2,900.00 $3,972.50 $2,208.00
69509(A) 1326 CLASS AA CONCRETE576.2CY $600.00 $575.00 $455.00 $600.00 $1,200.00 $957.00
70511(B) 6010 EPOXY COATED REINFORCING STEEL143,880LB $1.25 $1.35 $0.9500 $1.30 $1.00 $1.50
71512(A) 1323 PAINTING EXISTING STRUCTURES1LSUM $50,000.00 $27,500.00 $25,000.00 $25,000.00 $26,000.00 $40,000.00
72512(B) 6303 COLLECTION AND HANDLING OF WASTE1LSUM $15,000.00 $2,500.00 $2,000.00 $2,000.00 $2,500.00 $4,000.00
73515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)1,243.6SY $6.00 $5.00 $4.00 $3.60 $4.00 $4.00
74520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER31.5LF $40.00 $10.00 $75.00 $92.00 $60.00 $7.00
75520(C) 6060 EPOXY RESIN, ABOVE WATER2.8GAL $111.58 $125.00 $75.00 $74.00 $60.00 $60.00
76521(A) 6210 PNEUMATICALLY PLACED MORTAR9.7SY $750.00 $750.00 $1,000.00 $880.00 $1,100.00 $788.00
77523(A) 6550 SEALER CRACK PREPARATION128.7LF $6.00 $5.00 $5.00 $4.00 $5.00 $4.00
78523(B) 6560 SEALER RESIN2GAL $206.85 $250.00 $125.00 $100.00 $60.00 $100.00
79619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $150,000.00 $175,000.00 $300,000.00 $265,000.00 $250,000.00 $599,000.00
80504 6176 INSERTS85EA $35.00 $35.00 $30.00 $24.00 $400.00 $38.00
81855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)7,126LF $2.00 $0.6100 $0.5800 $0.5500 $0.6000 $0.6000
82880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $35,000.00 $11,000.00 $11,000.00 $10,000.00 $14,000.00 $10,000.00
83882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN250SD $25.00 $19.80 $18.95 $18.00 $18.00 $40.00
84642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $25,000.00 $12,500.00 $15,000.00 $9,800.00 $6,000.00 $30,000.00
85641 1399 MOBILIZATION1LSUM $188,991.00 $125,000.00 $150,000.00 $123,000.00 $184,000.00 $170,000.00