| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$12,500.00 |
$10,000.00 |
$10,000.00 |
$8,000.00 |
$50,000.00 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,143 | CY |
$10.00 |
$15.00 |
$12.00 |
$13.00 |
$34.00 |
$34.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$8,000.00 |
$2,500.00 |
$15,000.00 |
$3,850.00 |
$6,000.00 |
$5,000.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,233 | LF |
$3.50 |
$2.10 |
$2.50 |
$1.85 |
$1.85 |
$2.00 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 72 | LF |
$10.00 |
$9.35 |
$9.00 |
$9.85 |
$8.95 |
$9.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 2,159 | SY |
$5.00 |
$3.75 |
$5.50 |
$1.95 |
$1.95 |
$2.00 |
| 7 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 386 | CY |
$65.00 |
$49.00 |
$50.00 |
$63.00 |
$68.00 |
$40.00 |
| 8 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 41 | TON |
$40.00 |
$47.80 |
$35.00 |
$50.00 |
$200.00 |
$82.00 |
| 9 | 408 5774 |
PRIME COAT | 430 | GAL |
$6.00 |
$4.40 |
$4.00 |
$4.00 |
$4.00 |
$4.00 |
| 10 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 220 | TON |
$90.00 |
$138.43 |
$95.00 |
$125.85 |
$135.00 |
$126.00 |
| 11 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 255 | TON |
$120.00 |
$142.29 |
$110.00 |
$129.35 |
$140.00 |
$130.00 |
| 12 | 412 5267 |
COLD MILLING PAVEMENT | 533 | SY |
$16.00 |
$12.87 |
$12.00 |
$11.70 |
$8.00 |
$10.00 |
| 13 | 509(D) 0325 |
CLASS C CONCRETE | 11 | CY |
$600.00 |
$300.00 |
$575.00 |
$750.00 |
$800.00 |
$348.00 |
| 14 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 582 | LF |
$8.00 |
$3.00 |
$2.75 |
$1.00 |
$3.00 |
$2.00 |
| 15 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 475 | LF |
$20.00 |
$15.40 |
$14.75 |
$14.00 |
$15.00 |
$14.00 |
| 16 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 8 | EA |
$2,500.00 |
$2,200.00 |
$2,100.00 |
$2,000.00 |
$2,200.00 |
$2,000.00 |
| 17 | 623(I) 8675 |
GUARDRAIL BRIDGE CONNECTION-TYPE A | 4 | EA |
$2,000.00 |
$1,430.00 |
$1,400.00 |
$1,300.00 |
$1,500.00 |
$1,300.00 |
| 18 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 60 | CY |
$15.00 |
$20.00 |
$50.00 |
$38.00 |
$50.00 |
$67.00 |
| 19 | 501(G) 6309 |
CLSM BACKFILL | 66 | CY |
$250.00 |
$145.00 |
$110.00 |
$190.00 |
$220.00 |
$162.00 |
| 20 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$15,000.00 |
$15,000.00 |
$30,000.00 |
$15,000.00 |
$8,000.00 |
$60,000.00 |
| 21 | 504(A) 1304 |
APPROACH SLAB | 187.4 | SY |
$300.00 |
$255.00 |
$150.00 |
$210.00 |
$175.00 |
$161.00 |
| 22 | 504(B) 1305 |
SAW-CUT GROOVING | 805.9 | SY |
$20.00 |
$5.00 |
$4.00 |
$4.05 |
$8.00 |
$5.00 |
| 23 | 504(C) 6250 |
SEALED EXPANSION JOINT | 86.4 | LF |
$300.00 |
$250.00 |
$190.00 |
$350.00 |
$220.00 |
$222.00 |
| 24 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 362.8 | LF |
$70.00 |
$75.00 |
$65.00 |
$100.00 |
$130.00 |
$68.00 |
| 25 | 506(A) 1322 |
STRUCTURAL STEEL | 33,480 | LB |
$4.00 |
$3.20 |
$3.50 |
$3.20 |
$3.00 |
$4.00 |
| 26 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 16 | EA |
$1,000.00 |
$885.00 |
$2,000.00 |
$2,400.00 |
$3,000.00 |
$2,208.00 |
| 27 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 6 | EA |
$1,000.00 |
$885.00 |
$2,000.00 |
$2,400.00 |
$3,000.00 |
$2,208.00 |
| 28 | 509(A) 1326 |
CLASS AA CONCRETE | 155 | CY |
$600.00 |
$750.00 |
$575.00 |
$800.00 |
$1,400.00 |
$957.00 |
| 29 | 509(B) 1328 |
CLASS A CONCRETE | 48.4 | CY |
$500.00 |
$750.00 |
$1,750.00 |
$800.00 |
$1,400.00 |
$1,822.00 |
| 30 | 511(A) 1332 |
REINFORCING STEEL | 680 | LB |
$1.00 |
$2.00 |
$2.00 |
$1.20 |
$5.00 |
$1.50 |
| 31 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 48,660 | LB |
$1.90 |
$1.35 |
$1.00 |
$1.30 |
$1.00 |
$1.50 |
| 32 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$50,000.00 |
$12,250.00 |
$25,000.00 |
$10,000.00 |
$12,000.00 |
$20,000.00 |
| 33 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$10,000.00 |
$2,000.00 |
$2,000.00 |
$1,500.00 |
$2,000.00 |
$2,000.00 |
| 34 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 88 | LF |
$65.00 |
$70.00 |
$80.00 |
$55.00 |
$50.00 |
$44.00 |
| 35 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 88 | LF |
$25.00 |
$20.00 |
$25.00 |
$46.00 |
$150.00 |
$100.00 |
| 36 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 428 | SY |
$6.00 |
$5.00 |
$4.00 |
$3.60 |
$5.00 |
$4.00 |
| 37 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 68 | LF |
$400.00 |
$660.00 |
$750.00 |
$770.00 |
$450.00 |
$1,125.00 |
| 38 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 40 | LF |
$30.00 |
$10.00 |
$75.00 |
$76.00 |
$35.00 |
$7.00 |
| 39 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 4 | GAL |
$70.00 |
$125.00 |
$75.00 |
$74.00 |
$60.00 |
$60.00 |
| 40 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 10 | SY |
$600.00 |
$750.00 |
$1,000.00 |
$880.00 |
$1,200.00 |
$788.00 |
| 41 | 601(A) 1351 |
TYPE I PLAIN RIPRAP | 700 | TON |
$40.00 |
$36.25 |
$33.00 |
$50.00 |
$120.00 |
$58.00 |
| 42 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$50,000.00 |
$27,500.00 |
$150,000.00 |
$80,000.00 |
$85,000.00 |
$100,000.00 |
| 43 | 823 8478 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 90 | SD |
$150.00 |
$200.00 |
$194.73 |
$190.00 |
$185.00 |
$350.00 |
| 44 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 3,560 | LF |
$1.00 |
$0.6500 |
$0.5800 |
$0.5500 |
$0.5500 |
$0.6000 |
| 45 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,070 | LF |
$15.00 |
$42.00 |
$17.50 |
$22.00 |
$29.00 |
$38.00 |
| 46 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 1,070 | LF |
$7.00 |
$10.00 |
$4.00 |
$2.40 |
$5.00 |
$2.00 |
| 47 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$25,000.00 |
$8,250.00 |
$8,000.00 |
$7,500.00 |
$12,000.00 |
$8,000.00 |
| 48 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,000.00 |
$3,750.00 |
$5,000.00 |
$8,750.00 |
$6,000.00 |
$6,000.00 |
| 49 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,650 | LF |
$2.56 |
$2.00 |
$2.25 |
$1.90 |
$1.85 |
$2.00 |
| 50 | 221(F) 0100 |
TEMPORARY SILT DIKE | 40 | LF |
$14.34 |
$9.00 |
$10.00 |
$9.00 |
$8.95 |
$9.00 |
| 51 | 230(A) 2806 |
SOLID SLAB SODDING | 3,200 | SY |
$4.00 |
$3.75 |
$5.50 |
$2.00 |
$1.95 |
$2.00 |
| 52 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 2,590 | CY |
$39.01 |
$42.50 |
$45.00 |
$63.00 |
$65.00 |
$40.00 |
| 53 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,113 | TON |
$300.00 |
$95.42 |
$90.00 |
$87.00 |
$90.00 |
$87.00 |
| 54 | 412 5267 |
COLD MILLING PAVEMENT | 2,187 | SY |
$4.00 |
$5.12 |
$4.50 |
$4.70 |
$7.00 |
$10.00 |
| 55 | 509(D) 0325 |
CLASS C CONCRETE | 5 | CY |
$500.00 |
$500.00 |
$700.00 |
$1,000.00 |
$1,100.00 |
$348.00 |
| 56 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 2,900 | LF |
$3.50 |
$2.00 |
$2.30 |
$1.00 |
$1.00 |
$2.00 |
| 57 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 3,000 | LF |
$20.00 |
$15.40 |
$14.75 |
$14.00 |
$14.00 |
$14.00 |
| 58 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,500.00 |
$2,200.00 |
$2,100.00 |
$2,000.00 |
$2,000.00 |
$2,000.00 |
| 59 | 623(I) 8675 |
GUARDRAIL BRIDGE CONNECTION-TYPE A | 4 | EA |
$2,000.00 |
$1,430.00 |
$1,400.00 |
$1,300.00 |
$1,300.00 |
$1,300.00 |
| 60 | 501(G) 6309 |
CLSM BACKFILL | 120 | CY |
$175.00 |
$145.00 |
$105.00 |
$210.00 |
$180.52 |
$162.00 |
| 61 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$30,000.00 |
$17,500.00 |
$60,000.00 |
$20,500.00 |
$6,000.00 |
$120,000.00 |
| 62 | 504(A) 1304 |
APPROACH SLAB | 143 | SY |
$225.00 |
$255.00 |
$150.00 |
$210.00 |
$141.35 |
$161.00 |
| 63 | 504(B) 1305 |
SAW-CUT GROOVING | 2,403.4 | SY |
$6.00 |
$5.05 |
$4.00 |
$3.60 |
$7.00 |
$4.00 |
| 64 | 504(C) 6250 |
SEALED EXPANSION JOINT | 63.5 | LF |
$250.00 |
$255.00 |
$190.00 |
$350.00 |
$200.00 |
$222.00 |
| 65 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 1,442 | LF |
$80.00 |
$65.00 |
$65.00 |
$100.00 |
$80.00 |
$68.00 |
| 66 | 506(A) 1322 |
STRUCTURAL STEEL | 15,130 | LB |
$3.50 |
$4.25 |
$10.00 |
$5.00 |
$5.45 |
$4.00 |
| 67 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$3,000.00 |
$885.00 |
$2,000.00 |
$2,900.00 |
$3,972.50 |
$2,208.00 |
| 68 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 8 | EA |
$3,000.00 |
$885.00 |
$2,000.00 |
$2,900.00 |
$3,972.50 |
$2,208.00 |
| 69 | 509(A) 1326 |
CLASS AA CONCRETE | 576.2 | CY |
$600.00 |
$575.00 |
$455.00 |
$600.00 |
$1,200.00 |
$957.00 |
| 70 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 143,880 | LB |
$1.25 |
$1.35 |
$0.9500 |
$1.30 |
$1.00 |
$1.50 |
| 71 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$50,000.00 |
$27,500.00 |
$25,000.00 |
$25,000.00 |
$26,000.00 |
$40,000.00 |
| 72 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$15,000.00 |
$2,500.00 |
$2,000.00 |
$2,000.00 |
$2,500.00 |
$4,000.00 |
| 73 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,243.6 | SY |
$6.00 |
$5.00 |
$4.00 |
$3.60 |
$4.00 |
$4.00 |
| 74 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 31.5 | LF |
$40.00 |
$10.00 |
$75.00 |
$92.00 |
$60.00 |
$7.00 |
| 75 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 2.8 | GAL |
$111.58 |
$125.00 |
$75.00 |
$74.00 |
$60.00 |
$60.00 |
| 76 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 9.7 | SY |
$750.00 |
$750.00 |
$1,000.00 |
$880.00 |
$1,100.00 |
$788.00 |
| 77 | 523(A) 6550 |
SEALER CRACK PREPARATION | 128.7 | LF |
$6.00 |
$5.00 |
$5.00 |
$4.00 |
$5.00 |
$4.00 |
| 78 | 523(B) 6560 |
SEALER RESIN | 2 | GAL |
$206.85 |
$250.00 |
$125.00 |
$100.00 |
$60.00 |
$100.00 |
| 79 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$150,000.00 |
$175,000.00 |
$300,000.00 |
$265,000.00 |
$250,000.00 |
$599,000.00 |
| 80 | 504 6176 |
INSERTS | 85 | EA |
$35.00 |
$35.00 |
$30.00 |
$24.00 |
$400.00 |
$38.00 |
| 81 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 7,126 | LF |
$2.00 |
$0.6100 |
$0.5800 |
$0.5500 |
$0.6000 |
$0.6000 |
| 82 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$35,000.00 |
$11,000.00 |
$11,000.00 |
$10,000.00 |
$14,000.00 |
$10,000.00 |
| 83 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 250 | SD |
$25.00 |
$19.80 |
$18.95 |
$18.00 |
$18.00 |
$40.00 |
| 84 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$25,000.00 |
$12,500.00 |
$15,000.00 |
$9,800.00 |
$6,000.00 |
$30,000.00 |
| 85 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$188,991.00 |
$125,000.00 |
$150,000.00 |
$123,000.00 |
$184,000.00 |
$170,000.00 |