Bid tab 120225

Let Jun 21, 2012 · · Sbr-164b(163)sb Sign up free

‹ Jun 2012 results

PUSHMATAHA BRIDGE REHABILITATION US -271: OVER UNNAMED CREEK, 11.3 MILES NORTHEAST OF SH -3. US-271: OVER GAY CREEK , 13.0 MILES NORTHEAST OF SH -3.

Let date
Thursday, June 21, 2012
Contract
120225
J/P numbers
27877(04)
District
County
Sbr-164b(163)sb
Highway
Limits
PUSHMATAHA BRIDGE REHABILITATION US -271: OVER UNNAMED CREEK, 11.3 MILES NORTHEAST OF SH -3. US-271: OVER GAY CREEK , 13.0 MILES NORTHEAST OF SH -3.
Project number
SBR-164B(162)SB

Bidders 6

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$1,385,266
1 LOGOS CONSTRUCTION CO., LLC Low bidder $1,318,798 -4.8%
2 SCR CONSTRUCTION CO., INC. $1,368,430 -1.2% +3.8%
4 HUB Construction, Inc. $1,505,751 +8.7% +14.2%
5 PBX Corporation $1,522,224 +9.9% +15.4%
6 EARTH BUILDERS, L.P. $1,540,208 +11.2% +16.8%
7 WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES $1,738,669 +25.5% +31.8%

Bid tab: unit prices 90 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 LOGOS CONSTRUCT…#2 SCR CONSTRUCTIO…#4 HUB Constructio…#5 PBX Corporation#6 EARTH BUILDERS,…#7 WILDCAT CONSTRU…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $5,000.00 $4,170.00 $5,000.00 $5,000.00 $2,000.00 $50,000.00 $10,000.00
2202(D) 0184 UNCLASSIFIED BORROW1,630CY $15.00 $18.00 $20.00 $20.00 $18.00 $25.00 $40.00
3205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $7,500.00 $6,950.00 $5,000.00 $1,500.00 $8,000.00 $15,000.00 $6,500.00
4221(C) 2801 TEMPORARY SILT FENCE1,040LF $5.00 $0.4000 $1.85 $5.00 $2.00 $2.20 $1.85
5221(F) 0100 TEMPORARY SILT DIKE20LF $10.00 $5.35 $8.95 $10.00 $10.00 $11.00 $8.95
6230(A) 2806 SOLID SLAB SODDING2,775SY $4.00 $6.88 $1.85 $3.00 $2.00 $2.50 $1.85
7230(F) 2812 WATERING111KGAL $8.00 $27.50 $15.00 $10.00 $16.00 $18.00 $15.00
8234(A) 2824 FERTILIZING (10-20-10)0.28TON $900.00 $1,400.00 $800.00 $1,000.00 $880.00 $950.00 $800.00
9303(A) 2100 AGGREGATE BASE TYPE A290CY $51.00 $26.00 $80.00 $75.00 $75.00 $60.00 $70.00
10408 5774 PRIME COAT486GAL $6.00 $5.56 $4.25 $6.00 $5.00 $5.00 $4.00
11411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)154.2TON $80.00 $156.00 $120.00 $125.00 $124.00 $140.00 $112.75
12411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)294TON $90.00 $152.00 $117.00 $125.00 $120.00 $138.00 $109.75
13412 5267 COLD MILLING PAVEMENT1,503SY $8.00 $6.50 $5.00 $6.00 $5.00 $6.00 $4.75
14619(B) 4780 REMOVAL OF GUARDRAIL656LF $5.00 $5.00 $3.00 $5.00 $2.00 $3.00 $3.50
15623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE400LF $25.00 $20.00 $14.25 $18.00 $15.00 $17.00 $14.25
16623(G) 8571 GUARDRAIL END TREATMENT (GET)4EA $2,500.00 $2,780.00 $2,000.00 $2,500.00 $2,200.00 $2,200.00 $2,000.00
17623(I) 8675 GUARDRAIL BRIDGE CONNECTION-TYPE A4EA $2,000.00 $1,807.00 $1,300.00 $1,500.00 $1,430.00 $1,500.00 $1,300.00
18501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON150CY $90.00 $90.00 $50.00 $15.00 $13.00 $20.00 $40.00
19501(G) 6309 CLSM BACKFILL185CY $150.00 $135.00 $180.00 $175.00 $200.00 $150.00 $400.00
20504(A) 1304 APPROACH SLAB234.2SY $240.00 $185.00 $195.00 $200.00 $235.00 $165.00 $250.00
21504(B) 1305 SAW-CUT GROOVING492.5SY $5.00 $5.60 $8.00 $6.00 $5.00 $5.00 $4.00
22504(C) 6250 SEALED EXPANSION JOINT43.2LF $250.00 $283.00 $210.00 $250.00 $325.00 $230.00 $400.00
23504(D) 6245 CONCRETE RAIL (TR4)221.6LF $80.00 $85.00 $105.00 $85.00 $125.00 $75.00 $100.00
24506(A) 1322 STRUCTURAL STEEL26,480LB $2.50 $2.60 $2.75 $2.60 $3.50 $2.80 $4.50
25507(A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY7EA $2,500.00 $1,390.00 $1,900.00 $1,500.00 $2,500.00 $1,500.00 $2,500.00
26507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY7EA $2,500.00 $1,390.00 $1,900.00 $1,500.00 $2,500.00 $1,600.00 $2,500.00
27509(A) 1326 CLASS AA CONCRETE67.7CY $550.00 $800.00 $750.00 $1,500.00 $950.00 $900.00 $900.00
28509(B) 1328 CLASS A CONCRETE45CY $750.00 $600.00 $1,235.00 $1,500.00 $850.00 $900.00 $800.00
29511 6306 MECHANICAL SPLICES260EA $35.00 $55.00 $12.00 $12.00 $20.00 $20.00 $25.00
30511(B) 6010 EPOXY COATED REINFORCING STEEL23,820LB $1.20 $1.10 $1.00 $1.25 $1.50 $1.30 $1.50
31512(A) 1323 PAINTING EXISTING STRUCTURES1LSUM $20,000.00 $18,765.00 $10,000.00 $10,000.00 $20,000.00 $14,000.00 $8,815.43
32515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)254SY $4.00 $5.50 $6.00 $5.00 $5.00 $5.00 $4.00
33520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER33LF $50.00 $40.00 $16.00 $8.00 $30.00 $5.00 $35.00
34520(C) 6060 EPOXY RESIN, ABOVE WATER3GAL $120.00 $60.00 $55.00 $400.00 $80.00 $150.00 $100.00
35523(A) 6550 SEALER CRACK PREPARATION101.6LF $4.00 $4.00 $11.00 $5.00 $3.00 $5.00 $4.00
36523(B) 6560 SEALER RESIN2GAL $200.00 $80.00 $55.00 $200.00 $50.00 $150.00 $100.00
37545 4815 (PL)REPLACE BRIDGE ITEM (TYPE A)4EA $500.00 $1,112.00 $1,800.00 $4,500.00 $300.00 $3,500.00 $2,000.00
38619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $50,000.00 $42,000.00 $70,000.00 $40,000.00 $70,000.00 $30,000.00 $100,000.00
39823 8478 (SP)PORTABLE TRAFFIC SIGNAL SYSTEM150SD $200.00 $165.00 $185.00 $225.00 $200.00 $230.00 $185.00
40855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)5,404LF $1.00 $1.90 $0.7000 $0.7500 $0.7200 $1.00 $0.6500
41870(A) 8485 SAND FILLED IMPACT ATTENUATION MODULE1,125SD $3.00 $0.7000 $0.5000 $0.7500 $0.5500 $5.00 $0.5000
42877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER1,920LF $22.00 $3.50 $3.00 $35.00 $2.50 $28.00 $30.00
43877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER816LF $5.00 $36.00 $24.00 $6.00 $27.00 $12.00 $5.00
44880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $10,000.00 $14,500.00 $15,000.00 $15,000.00 $23,750.00 $16,000.00 $10,500.00
45642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $9,000.00 $4,850.00 $6,000.00 $5,000.00 $3,500.00 $25,000.00 $10,000.00
46641 1552 MOBILIZATION1LSUM $57,637.10 $85,000.00 $90,000.00 $50,000.00 $100,321.00 $100,000.00 $100,000.00
47201(A) 0102 CLEARING AND GRUBBING1LSUM $5,000.00 $4,170.00 $4,000.00 $5,000.00 $2,000.00 $50,000.00 $10,000.00
48202(D) 0184 UNCLASSIFIED BORROW1,000CY $15.00 $18.00 $20.00 $20.00 $18.00 $25.00 $40.00
49205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $7,500.00 $4,865.00 $5,000.00 $1,500.00 $8,000.00 $15,000.00 $6,500.00
50221(C) 2801 TEMPORARY SILT FENCE1,040LF $5.00 $0.3200 $1.85 $5.00 $2.00 $2.20 $1.85
51221(F) 0100 TEMPORARY SILT DIKE20LF $10.00 $5.35 $8.95 $10.00 $10.00 $11.00 $8.95
52230(A) 2806 SOLID SLAB SODDING1,900SY $4.00 $6.85 $1.85 $3.00 $2.00 $2.50 $1.85
53230(F) 2812 WATERING76KGAL $8.00 $27.73 $15.00 $10.00 $16.00 $18.00 $15.00
54234(A) 2824 FERTILIZING (10-20-10)0.2TON $900.00 $1,350.00 $800.00 $1,000.00 $880.00 $950.00 $800.00
55303(A) 2100 AGGREGATE BASE TYPE A290CY $51.00 $28.00 $80.00 $75.00 $75.00 $60.00 $70.00
56408 5774 PRIME COAT486GAL $6.00 $6.00 $4.25 $6.00 $5.00 $5.00 $4.00
57411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)154.2TON $80.00 $156.50 $120.00 $120.00 $124.00 $140.00 $112.75
58411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)294TON $90.00 $153.00 $117.00 $120.00 $120.00 $138.00 $109.75
59412 5267 COLD MILLING PAVEMENT1,503SY $8.00 $6.50 $5.00 $6.00 $5.00 $6.00 $4.75
60619(B) 4780 REMOVAL OF GUARDRAIL656LF $5.00 $5.00 $3.00 $3.00 $2.00 $3.00 $3.50
61623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE400LF $25.00 $20.00 $14.25 $18.00 $15.00 $17.00 $14.25
62623(G) 8571 GUARDRAIL END TREATMENT (GET)4EA $2,500.00 $2,780.00 $2,000.00 $2,500.00 $2,200.00 $2,200.00 $2,000.00
63623(I) 8675 GUARDRAIL BRIDGE CONNECTION-TYPE A4EA $2,000.00 $1,807.00 $1,300.00 $1,500.00 $1,430.00 $1,500.00 $1,300.00
64501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON120CY $90.00 $80.00 $50.00 $15.00 $13.00 $20.00 $40.00
65501(G) 6309 CLSM BACKFILL163CY $150.00 $135.00 $160.00 $175.00 $200.00 $150.00 $400.00
66504(A) 1304 APPROACH SLAB234.2SY $240.00 $190.00 $195.00 $200.00 $235.00 $165.00 $250.00
67504(B) 1305 SAW-CUT GROOVING403.7SY $5.00 $5.68 $8.00 $6.00 $5.00 $5.00 $4.00
68504(C) 6250 SEALED EXPANSION JOINT43.2LF $250.00 $280.00 $210.00 $250.00 $325.00 $230.00 $400.00
69504(D) 6245 CONCRETE RAIL (TR4)181.6LF $80.00 $90.00 $105.00 $85.00 $125.00 $75.00 $100.00
70506(A) 1322 STRUCTURAL STEEL12,700LB $2.50 $2.60 $2.75 $3.00 $5.00 $2.80 $4.50
71507(A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY7EA $2,500.00 $1,800.00 $1,800.00 $1,500.00 $2,500.00 $1,500.00 $2,500.00
72507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY7EA $2,500.00 $1,900.00 $1,800.00 $1,500.00 $2,500.00 $1,600.00 $2,500.00
73509(A) 1326 CLASS AA CONCRETE45.7CY $550.00 $800.00 $750.00 $1,500.00 $950.00 $900.00 $900.00
74509(B) 1328 CLASS A CONCRETE42.2CY $750.00 $600.00 $1,235.00 $1,500.00 $850.00 $900.00 $800.00
75511 6306 MECHANICAL SPLICES189EA $35.00 $55.00 $12.00 $12.00 $20.00 $20.00 $24.00
76511(B) 6010 EPOXY COATED REINFORCING STEEL17,550LB $1.20 $1.10 $1.00 $1.25 $1.50 $1.30 $1.50
77512(A) 1323 PAINTING EXISTING STRUCTURES1LSUM $15,000.00 $15,300.00 $9,000.00 $5,000.00 $20,000.00 $18,000.00 $6,359.33
78515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)208SY $4.00 $5.50 $6.00 $5.00 $5.00 $5.00 $4.00
79520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER26LF $50.00 $40.00 $16.00 $8.00 $30.00 $5.00 $40.00
80520(C) 6060 EPOXY RESIN, ABOVE WATER2GAL $120.00 $60.00 $55.00 $400.00 $80.00 $150.00 $100.00
81523(A) 6550 SEALER CRACK PREPARATION81.6LF $4.00 $4.00 $11.00 $5.00 $3.00 $5.00 $4.00
82523(B) 6560 SEALER RESIN2GAL $200.00 $80.00 $55.00 $200.00 $50.00 $150.00 $100.00
83540 4515 (PL)REPAIR BRIDGE ITEM (TYPE A)2EA $3,000.00 $300.00 $8,000.00 $10,000.00 $4,000.00 $3,500.00 $6,000.00
84545 4815 (PL)REPLACE BRIDGE ITEM (TYPE A)4EA $500.00 $1,112.00 $1,800.00 $5,000.00 $500.00 $3,500.00 $2,000.00
85619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $40,000.00 $30,000.00 $70,000.00 $25,000.00 $70,000.00 $30,000.00 $80,000.00
86823 8478 (SP)PORTABLE TRAFFIC SIGNAL SYSTEM150SD $200.00 $165.00 $150.00 $225.00 $200.00 $230.00 $150.00
87855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)5,724LF $1.00 $0.9000 $0.7000 $0.7500 $0.7200 $1.00 $0.6500
88877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER2,080LF $22.00 $3.50 $3.00 $35.00 $2.50 $28.00 $30.00
89877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER1,040LF $5.00 $36.00 $24.00 $6.00 $27.00 $12.00 $5.00
90880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $10,000.00 $18,865.00 $15,000.00 $15,000.00 $23,750.00 $16,000.00 $10,500.00