| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 1,470 | CY |
$7.00 |
$4.00 |
$9.00 |
$14.62 |
$15.00 |
$8.81 |
$9.55 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 10 | CY |
$25.00 |
$20.00 |
$24.00 |
$46.78 |
$50.00 |
$8.81 |
$19.85 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$3,500.00 |
$2,500.00 |
$2,550.00 |
$11,580.74 |
$2,500.00 |
$6,633.10 |
$5,964.04 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,000 | LF |
$2.00 |
$3.10 |
$3.10 |
$2.74 |
$3.00 |
$2.26 |
$2.14 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 84 | LF |
$7.00 |
$8.00 |
$8.30 |
$19.95 |
$10.00 |
$11.30 |
$12.77 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 3,591 | SY |
$1.50 |
$2.05 |
$2.05 |
$2.95 |
$2.50 |
$2.80 |
$2.04 |
| 7 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,233 | CY |
$36.00 |
$40.00 |
$34.40 |
$43.50 |
$34.20 |
$63.19 |
$54.33 |
| 8 | 325 5271 |
SEPARATOR FABRIC | 5,452 | SY |
$3.50 |
$1.05 |
$1.32 |
$1.57 |
$2.00 |
$2.12 |
$1.56 |
| 9 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 633 | TON |
$27.00 |
$19.00 |
$20.80 |
$23.39 |
$17.00 |
$38.31 |
$23.36 |
| 10 | 408 5774 |
PRIME COAT | 787 | GAL |
$7.50 |
$7.85 |
$7.90 |
$9.74 |
$7.70 |
$8.90 |
$8.05 |
| 11 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 564 | TON |
$105.00 |
$110.25 |
$110.00 |
$115.95 |
$120.00 |
$109.67 |
$113.22 |
| 12 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 850 | SY |
$25.00 |
$20.00 |
$21.00 |
$20.14 |
$32.00 |
$19.06 |
$12.51 |
| 13 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 2,202 | SY |
$40.00 |
$24.00 |
$28.00 |
$20.14 |
$25.00 |
$19.06 |
$24.28 |
| 14 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 712 | CY |
$125.00 |
$125.00 |
$115.00 |
$126.06 |
$125.00 |
$122.89 |
$143.94 |
| 15 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 1,240 | LF |
$7.00 |
$6.00 |
$9.80 |
$7.97 |
$5.00 |
$16.40 |
$5.01 |
| 16 | 613(K) 5916 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 60 | LF |
$23.00 |
$6.00 |
$8.40 |
$10.40 |
$5.00 |
$16.40 |
$20.24 |
| 17 | 613(U) 1100 |
PIPE UNDERDRAIN COVER MAT'L. | 46 | CY |
$36.00 |
$35.00 |
$30.40 |
$40.92 |
$60.00 |
$56.50 |
$65.90 |
| 18 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 304 | SY |
$6.00 |
$4.00 |
$7.70 |
$14.62 |
$5.55 |
$5.28 |
$9.39 |
| 19 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,373 | SY |
$6.00 |
$2.00 |
$6.30 |
$9.74 |
$5.55 |
$5.51 |
$5.90 |
| 20 | 619(C) 0924 |
SAWING PAVEMENT | 1,462 | LF |
$2.00 |
$4.00 |
$3.76 |
$8.53 |
$3.30 |
$3.39 |
$2.66 |
| 21 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 500 | LF |
$0.2100 |
$0.6300 |
$0.6300 |
$0.7300 |
$1.08 |
$0.7100 |
$0.6300 |
| 22 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 45 | SD |
$15.00 |
$8.40 |
$8.40 |
$9.74 |
$10.80 |
$9.44 |
$8.40 |
| 23 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 90 | SD |
$10.00 |
$3.15 |
$3.15 |
$3.65 |
$5.40 |
$3.54 |
$3.15 |
| 24 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,080 | SD |
$0.2300 |
$1.89 |
$1.90 |
$2.19 |
$0.3800 |
$2.12 |
$1.89 |
| 25 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 675 | SD |
$1.00 |
$1.89 |
$1.90 |
$2.19 |
$1.08 |
$2.12 |
$1.89 |
| 26 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 720 | SD |
$2.00 |
$1.89 |
$1.90 |
$2.19 |
$2.16 |
$2.12 |
$1.89 |
| 27 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 675 | SD |
$3.00 |
$0.0200 |
$0.0200 |
$0.0400 |
$0.8100 |
$0.0400 |
$0.0300 |
| 28 | 880(C) 8848 |
WING BARRICADES | 180 | SD |
$2.50 |
$0.0500 |
$0.0500 |
$0.0600 |
$2.16 |
$0.0700 |
$0.0600 |
| 29 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 450 | SD |
$0.5000 |
$0.7400 |
$0.7300 |
$0.8500 |
$0.3800 |
$0.8300 |
$0.7300 |
| 30 | 880(F) 8878 |
DRUMS | 1,575 | SD |
$0.3500 |
$0.0200 |
$0.0200 |
$0.0500 |
$0.5900 |
$0.0400 |
$0.0300 |
| 31 | 880(G) 8890 |
CHANNELIZER CONES | 2,250 | SD |
$0.4500 |
$0.4200 |
$0.4200 |
$0.4900 |
$0.5900 |
$0.4700 |
$0.4200 |
| 32 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 90 | SD |
$12.00 |
$8.40 |
$8.40 |
$9.74 |
$37.80 |
$9.44 |
$8.40 |
| 33 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 94.52 | SF |
$15.00 |
$16.80 |
$16.80 |
$19.49 |
$16.20 |
$18.88 |
$16.80 |
| 34 | 851(C) 8324 |
2" SQUARE TUBE POST | 141 | LF |
$6.86 |
$11.55 |
$11.60 |
$13.40 |
$12.96 |
$12.98 |
$11.55 |
| 35 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 608 | LF |
$0.4100 |
$0.5800 |
$0.5800 |
$0.6700 |
$1.08 |
$0.6500 |
$0.5700 |
| 36 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 1,976 | LF |
$1.17 |
$1.26 |
$1.26 |
$1.43 |
$2.16 |
$1.42 |
$1.26 |
| 37 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 888 | LF |
$1.72 |
$2.10 |
$2.10 |
$2.38 |
$4.32 |
$2.36 |
$2.10 |
| 38 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 16 | LF |
$11.03 |
$3.68 |
$3.70 |
$4.26 |
$8.64 |
$4.13 |
$3.67 |
| 39 | 856(B) 8525 |
TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) | 15 | EA |
$217.46 |
$84.00 |
$84.00 |
$95.00 |
$162.00 |
$94.40 |
$84.00 |
| 40 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$2,841.00 |
$3,000.00 |
$2,600.00 |
$9,744.00 |
$7,500.00 |
$4,426.21 |
$2,950.19 |
| 41 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$20,000.00 |
$35,000.00 |
$24,000.00 |
$14,226.24 |
$40,000.00 |
$30,000.00 |
$62,656.53 |