| 1 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$50,000.00 |
$71,400.00 |
$72,000.00 |
$72,150.00 |
$75,000.00 |
$70,000.00 |
$85,320.00 |
$75,000.00 |
$90,000.00 |
| 2 | 221(C) 2801 |
TEMPORARY SILT FENCE | 300 | LF |
$3.00 |
$1.30 |
$2.00 |
$3.00 |
$2.20 |
$2.00 |
$2.00 |
$4.20 |
$4.00 |
| 3 | 221(F) 0100 |
TEMPORARY SILT DIKE | 500 | LF |
$8.00 |
$5.00 |
$6.00 |
$5.00 |
$6.60 |
$6.00 |
$6.00 |
$6.30 |
$6.50 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 10,484 | SY |
$2.25 |
$1.55 |
$1.45 |
$2.00 |
$1.60 |
$1.45 |
$1.45 |
$1.68 |
$1.70 |
| 5 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.2 | AC |
$550.00 |
$150.00 |
$375.00 |
$450.00 |
$400.00 |
$375.00 |
$375.00 |
$420.00 |
$450.00 |
| 6 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,050 | TON |
$35.00 |
$34.00 |
$29.00 |
$40.10 |
$32.00 |
$42.00 |
$38.00 |
$30.54 |
$40.00 |
| 7 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$275.00 |
$225.00 |
$250.00 |
$250.00 |
$300.00 |
$185.00 |
$255.00 |
$200.00 |
$250.00 |
| 8 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 540 | TON |
$38.00 |
$45.75 |
$44.00 |
$44.60 |
$45.00 |
$49.50 |
$37.50 |
$48.70 |
$40.00 |
| 9 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 178 | TON |
$35.00 |
$36.40 |
$40.00 |
$40.00 |
$34.00 |
$45.50 |
$37.50 |
$41.80 |
$40.00 |
| 10 | 601(H) 1390 |
TYPE IV GROUTED RIPRAP | 1,000 | SY |
$150.00 |
$32.00 |
$34.00 |
$24.00 |
$100.00 |
$32.00 |
$75.00 |
$26.00 |
$40.00 |
| 11 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 54 | LF |
$32.00 |
$22.00 |
$28.00 |
$30.00 |
$27.00 |
$27.50 |
$54.00 |
$27.23 |
$35.00 |
| 12 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 94 | LF |
$45.00 |
$31.00 |
$36.00 |
$41.00 |
$40.00 |
$35.00 |
$94.00 |
$34.70 |
$47.00 |
| 13 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$925.00 |
$800.00 |
$1,000.00 |
$800.00 |
$1,000.00 |
$1,700.00 |
$811.00 |
$545.00 |
$800.00 |
| 14 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 2 | EA |
$1,200.00 |
$1,150.00 |
$1,200.00 |
$1,000.00 |
$1,000.00 |
$2,200.00 |
$1,713.00 |
$935.00 |
$1,200.00 |
| 15 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 135.6 | CY |
$15.00 |
$7.50 |
$27.00 |
$10.00 |
$10.00 |
$15.00 |
$20.00 |
$30.00 |
$10.00 |
| 16 | 501(D) 6353 |
UNCLASSIFIED BACKFILL | 209.2 | CY |
$13.00 |
$8.50 |
$38.00 |
$12.00 |
$10.00 |
$20.00 |
$20.00 |
$25.00 |
$20.00 |
| 17 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 416.67 | LF |
$195.00 |
$175.50 |
$190.00 |
$179.00 |
$185.00 |
$202.00 |
$225.00 |
$210.00 |
$190.00 |
| 18 | 504(E) 1380 |
CONCRETE RAIL (TR1) | 315 | LF |
$55.00 |
$62.00 |
$55.00 |
$49.00 |
$50.00 |
$65.00 |
$72.00 |
$145.00 |
$40.00 |
| 19 | 506(A) 1322 |
STRUCTURAL STEEL | 306 | LB |
$2.75 |
$2.50 |
$4.00 |
$3.00 |
$4.00 |
$5.00 |
$4.00 |
$3.50 |
$2.50 |
| 20 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 4 | EA |
$700.00 |
$900.00 |
$950.00 |
$437.00 |
$550.00 |
$550.00 |
$1,165.00 |
$550.00 |
$600.00 |
| 21 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 4 | EA |
$700.00 |
$900.00 |
$950.00 |
$437.00 |
$550.00 |
$550.00 |
$1,165.00 |
$550.00 |
$600.00 |
| 22 | 509(A) 1326 |
CLASS AA CONCRETE | 80.6 | CY |
$475.00 |
$440.00 |
$400.00 |
$425.00 |
$500.00 |
$565.00 |
$603.00 |
$410.00 |
$375.00 |
| 23 | 509(B) 1328 |
CLASS A CONCRETE | 130.6 | CY |
$450.00 |
$445.00 |
$400.00 |
$425.00 |
$500.00 |
$565.00 |
$410.00 |
$400.00 |
$360.00 |
| 24 | 511(A) 1332 |
REINFORCING STEEL | 34,726 | LB |
$0.9000 |
$0.8100 |
$0.9500 |
$1.00 |
$0.9000 |
$0.8500 |
$0.8000 |
$1.00 |
$0.8500 |
| 25 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 180 | LF |
$28.00 |
$25.00 |
$25.50 |
$28.20 |
$25.00 |
$65.00 |
$35.00 |
$25.00 |
$27.00 |
| 26 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 560 | LF |
$32.00 |
$29.00 |
$32.75 |
$37.43 |
$29.00 |
$38.00 |
$44.00 |
$32.00 |
$32.00 |
| 27 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 180 | LF |
$12.00 |
$11.00 |
$19.50 |
$12.00 |
$11.00 |
$7.00 |
$11.00 |
$15.00 |
$8.00 |
| 28 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 560 | LF |
$15.00 |
$13.00 |
$12.75 |
$12.00 |
$13.00 |
$7.00 |
$11.00 |
$18.00 |
$800.00 |
| 29 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,925 | TON |
$38.00 |
$39.25 |
$40.00 |
$42.60 |
$42.00 |
$47.50 |
$60.00 |
$48.71 |
$45.00 |
| 30 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 576 | TON |
$35.00 |
$32.00 |
$37.00 |
$40.00 |
$34.00 |
$43.00 |
$49.00 |
$41.80 |
$45.00 |
| 31 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$4,200.00 |
$2,500.00 |
$6,500.00 |
$8,000.00 |
$8,000.00 |
$14,031.00 |
$86,000.00 |
$10,000.00 |
| 32 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 4 | EA |
$2,200.00 |
$2,000.00 |
$1,875.00 |
$2,175.00 |
$2,220.00 |
$2,200.00 |
$2,025.00 |
$2,126.00 |
$2,200.00 |
| 33 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$3,000.00 |
$2,200.00 |
$2,000.00 |
$3,200.00 |
$2,200.00 |
$2,500.00 |
$2,000.00 |
$2,100.00 |
$3,000.00 |
| 34 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$5,200.00 |
$5,650.00 |
$6,000.00 |
$6,000.00 |
$6,200.00 |
$6,000.00 |
$5,250.00 |
$5,880.00 |
$5,700.00 |
| 35 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,800.00 |
$2,000.00 |
$2,500.00 |
$2,500.00 |
$1,000.00 |
$3,500.00 |
$2,500.00 |
$1,200.00 |
$500.00 |
| 36 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$30,000.00 |
$21,000.00 |
$24,000.00 |
$24,000.00 |
$22,000.00 |
$36,000.00 |
$27,000.00 |
$64,000.00 |
$20,000.00 |