| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$9,000.00 |
$6,000.00 |
$10,000.00 |
$20,000.00 |
$8,000.00 |
$7,500.00 |
$5,145.00 |
$15,000.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$35,000.00 |
$39,000.00 |
$39,000.00 |
$31,080.00 |
$40,000.00 |
$52,000.00 |
$42,500.00 |
$50,400.00 |
$80,000.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 850 | LF |
$2.50 |
$2.00 |
$1.70 |
$2.00 |
$2.20 |
$3.00 |
$2.00 |
$2.42 |
$3.00 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 42 | LF |
$7.00 |
$4.00 |
$10.00 |
$4.00 |
$4.40 |
$6.00 |
$6.00 |
$8.50 |
$10.00 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 3,975 | SY |
$2.50 |
$2.00 |
$1.77 |
$2.00 |
$2.30 |
$3.00 |
$1.75 |
$1.67 |
$2.00 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.6 | AC |
$500.00 |
$300.00 |
$200.00 |
$300.00 |
$330.00 |
$500.00 |
$550.00 |
$519.75 |
$500.00 |
| 7 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 621 | TON |
$30.00 |
$18.00 |
$23.25 |
$25.00 |
$24.00 |
$39.00 |
$22.75 |
$24.47 |
$20.00 |
| 8 | 509(D) 0325 |
CLASS C CONCRETE | 15 | CY |
$400.00 |
$150.00 |
$275.00 |
$200.00 |
$300.00 |
$300.00 |
$225.00 |
$289.75 |
$350.00 |
| 9 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 88 | LF |
$30.00 |
$32.00 |
$18.00 |
$26.00 |
$20.00 |
$28.00 |
$21.00 |
$26.49 |
$30.00 |
| 10 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$500.00 |
$200.00 |
$215.00 |
$300.00 |
$120.00 |
$350.00 |
$250.00 |
$325.50 |
$300.00 |
| 11 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 12.5 | SF |
$20.00 |
$12.50 |
$14.00 |
$12.50 |
$15.00 |
$28.00 |
$15.00 |
$13.12 |
$15.00 |
| 12 | 851(D) 8597 |
FLANGE CHANNEL POSTS(4 LB/FT) | 26 | LF |
$12.00 |
$5.00 |
$8.00 |
$5.00 |
$9.00 |
$16.00 |
$5.50 |
$5.25 |
$10.00 |
| 13 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 84 | CY |
$15.00 |
$15.00 |
$8.00 |
$30.00 |
$7.00 |
$10.00 |
$15.00 |
$11.00 |
$15.00 |
| 14 | 501(D) 6353 |
UNCLASSIFIED BACKFILL | 82 | CY |
$15.00 |
$20.00 |
$8.00 |
$45.00 |
$7.00 |
$12.00 |
$15.00 |
$11.00 |
$15.00 |
| 15 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 396.67 | LF |
$200.00 |
$190.00 |
$169.00 |
$180.00 |
$163.00 |
$168.00 |
$175.00 |
$215.90 |
$175.00 |
| 16 | 504(E) 1380 |
CONCRETE RAIL (TR1) | 265 | LF |
$60.00 |
$75.00 |
$60.00 |
$55.00 |
$55.00 |
$49.00 |
$65.00 |
$65.34 |
$70.00 |
| 17 | 506(A) 1322 |
STRUCTURAL STEEL | 1,810 | LB |
$3.00 |
$1.10 |
$2.25 |
$3.00 |
$2.50 |
$2.70 |
$3.75 |
$6.85 |
$2.00 |
| 18 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$500.00 |
$750.00 |
$1,250.00 |
$1,100.00 |
$1,200.00 |
$459.00 |
$1,000.00 |
$1,451.47 |
$600.00 |
| 19 | 509(A) 1326 |
CLASS AA CONCRETE | 77 | CY |
$500.00 |
$325.00 |
$465.00 |
$430.00 |
$500.00 |
$420.00 |
$525.00 |
$521.54 |
$550.00 |
| 20 | 509(B) 1328 |
CLASS A CONCRETE | 53.8 | CY |
$450.00 |
$325.00 |
$495.00 |
$430.00 |
$500.00 |
$420.00 |
$525.00 |
$517.54 |
$550.00 |
| 21 | 511(A) 1332 |
REINFORCING STEEL | 25,198 | LB |
$1.00 |
$1.15 |
$0.8400 |
$0.9000 |
$0.9000 |
$0.9500 |
$1.25 |
$1.05 |
$1.00 |
| 22 | 516(A) 6091 |
DRILLED SHAFTS 30" DIAMETER | 70 | LF |
$500.00 |
$400.00 |
$455.00 |
$400.00 |
$550.00 |
$494.25 |
$475.00 |
$839.92 |
$450.00 |
| 23 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 892 | TON |
$35.00 |
$25.00 |
$29.00 |
$34.00 |
$30.00 |
$40.00 |
$32.75 |
$33.12 |
$33.00 |
| 24 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 207 | TON |
$35.00 |
$21.00 |
$28.00 |
$32.50 |
$28.00 |
$38.00 |
$32.75 |
$32.04 |
$30.00 |
| 25 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$5,000.00 |
$4,000.00 |
$2,500.00 |
$10,000.00 |
$5,000.00 |
$3,500.00 |
$5,400.00 |
$7,000.00 |
| 26 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 33 | LF |
$30.00 |
$17.55 |
$30.00 |
$17.55 |
$38.00 |
$21.00 |
$38.50 |
$18.95 |
$35.00 |
| 27 | 623(F) 4447 |
GUARDRAIL ANCHOR UNIT (TYPE B) | 2 | EA |
$2,500.00 |
$400.00 |
$650.00 |
$400.00 |
$720.00 |
$700.00 |
$715.00 |
$432.00 |
$700.00 |
| 28 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 1 | EA |
$2,500.00 |
$1,725.00 |
$1,870.00 |
$1,725.00 |
$1,625.00 |
$1,950.00 |
$1,622.50 |
$1,863.00 |
$1,500.00 |
| 29 | 623(F) 6034 |
GUARDRAIL ANCHOR UNIT (TYPE III) | 2 | EA |
$2,500.00 |
$1,325.00 |
$1,800.00 |
$1,325.00 |
$1,980.00 |
$1,650.00 |
$1,980.00 |
$1,431.00 |
$2,000.00 |
| 30 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$2,650.00 |
$2,250.00 |
$2,650.00 |
$2,150.00 |
$3,000.00 |
$3,000.00 |
$2,862.00 |
$2,000.00 |
| 31 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$5,000.00 |
$3,950.00 |
$4,300.00 |
$7,500.00 |
$5,000.00 |
$5,200.00 |
$4,250.00 |
$4,830.00 |
$1,000.00 |
| 32 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$1,500.00 |
$2,800.00 |
$2,500.00 |
$1,200.00 |
$2,500.00 |
$2,250.00 |
$1,530.00 |
$3,000.00 |
| 33 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$25,000.00 |
$10,000.00 |
$18,000.00 |
$20,000.00 |
$12,000.00 |
$16,000.00 |
$20,000.00 |
$21,948.32 |
$45,000.00 |