| 1 | 201 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$30,000.00 |
$7,000.00 |
$5,000.00 |
$10,000.00 |
$10,000.00 |
$5,250.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,593 | CY |
$10.25 |
$3.25 |
$5.00 |
$5.00 |
$6.00 |
$12.08 |
| 3 | 202(C) 0184 |
UNCLASSIFIED BORROW | 13,070 | CY |
$9.00 |
$4.75 |
$5.00 |
$6.75 |
$7.00 |
$14.70 |
| 4 | 205 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$4,000.00 |
$2,500.00 |
$5,750.00 |
$10,000.00 |
$5,250.00 |
| 5 | 210 0121 |
OBLITERATING ABANDONED ROAD | 6 | STA |
$484.00 |
$250.00 |
$350.00 |
$450.00 |
$775.00 |
$2,772.00 |
| 6 | 223 2801 |
TEMPORARY SILT FENCE | 1,390 | LF |
$2.65 |
$1.35 |
$3.00 |
$1.80 |
$2.00 |
$2.63 |
| 7 | 227 0100 |
TEMPORARY SILT DIKE | 126 | LF |
$9.00 |
$8.85 |
$6.00 |
$8.00 |
$7.00 |
$8.40 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 7,950 | SY |
$2.47 |
$1.40 |
$2.00 |
$1.56 |
$2.50 |
$2.10 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 3.3 | AC |
$640.00 |
$800.00 |
$300.00 |
$375.00 |
$500.00 |
$630.00 |
| 10 | 325 5271 |
SEPARATOR FABRIC | 4,716 | SY |
$2.10 |
$1.25 |
$2.00 |
$2.15 |
$1.25 |
$3.00 |
| 11 | 403(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,920 | TON |
$23.11 |
$20.00 |
$27.50 |
$26.00 |
$23.75 |
$32.33 |
| 12 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$295.97 |
$300.00 |
$250.00 |
$275.00 |
$300.00 |
$270.00 |
| 13 | 613(B) 0493 |
30" R.C.PIPE CLASS III | 40 | LF |
$82.59 |
$52.25 |
$75.00 |
$110.00 |
$100.00 |
$73.50 |
| 14 | 613(D) 0689 |
18" CORR. GALV. STEEL PIPE | 30 | LF |
$38.44 |
$23.50 |
$25.00 |
$23.50 |
$25.00 |
$18.90 |
| 15 | 613(M) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$859.76 |
$300.00 |
$200.00 |
$270.00 |
$400.00 |
$242.55 |
| 16 | 613(M) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$839.81 |
$700.00 |
$1,000.00 |
$1,300.00 |
$1,250.00 |
$551.25 |
| 17 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 84 | CY |
$15.08 |
$33.00 |
$12.00 |
$8.00 |
$15.00 |
$12.08 |
| 18 | 501(D) 6353 |
UNCLASSIFIED BACKFILL | 82 | CY |
$16.89 |
$45.00 |
$12.00 |
$10.25 |
$20.00 |
$12.08 |
| 19 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 396.67 | LF |
$204.01 |
$200.00 |
$198.00 |
$188.50 |
$250.00 |
$210.00 |
| 20 | 504(E) 1380 |
CONCRETE RAIL (TR1) | 265 | LF |
$69.46 |
$57.25 |
$60.00 |
$66.50 |
$75.00 |
$50.62 |
| 21 | 506(A) 1322 |
STRUCTURAL STEEL | 1,810 | LB |
$3.67 |
$3.50 |
$2.50 |
$3.20 |
$6.00 |
$3.15 |
| 22 | 509(A) 1326 |
CLASS AA CONCRETE | 77 | CY |
$605.00 |
$500.00 |
$500.00 |
$495.00 |
$500.00 |
$420.00 |
| 23 | 509(B) 1328 |
CLASS A CONCRETE | 53.8 | CY |
$652.00 |
$500.00 |
$500.00 |
$510.50 |
$550.00 |
$450.00 |
| 24 | 511(A) 1332 |
REINFORCING STEEL | 24,676 | LB |
$1.25 |
$1.00 |
$0.9000 |
$0.8400 |
$1.25 |
$1.00 |
| 25 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 394 | LF |
$30.11 |
$31.00 |
$35.00 |
$32.00 |
$40.00 |
$30.72 |
| 26 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 394 | LF |
$15.59 |
$25.00 |
$15.00 |
$10.50 |
$8.00 |
$40.00 |
| 27 | 601(A-1)1353 |
TYPE I-A PLAIN RIPRAP | 855 | TON |
$40.26 |
$25.00 |
$32.00 |
$31.00 |
$33.00 |
$37.72 |
| 28 | 601(A-2)1355 |
TYPE I-A FILTER BLANKET | 214 | TON |
$32.22 |
$26.00 |
$28.00 |
$27.50 |
$33.00 |
$32.95 |
| 29 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$5,000.00 |
$3,000.00 |
$5,000.00 |
$4,750.00 |
$7,500.00 |
$2,625.00 |
| 30 | 623(F) 6033 |
GUARD RAIL ANCHOR UNIT (TYPE II) | 4 | EA |
$2,527.32 |
$2,275.00 |
$2,500.00 |
$2,325.00 |
$2,500.00 |
$2,404.50 |
| 31 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$11,564.15 |
$2,700.00 |
$3,500.00 |
$3,500.00 |
$7,500.00 |
$3,491.26 |
| 32 | 642 0098 |
STAKING | 1 | LSUM |
$7,500.00 |
$9,500.00 |
$3,500.00 |
$6,500.00 |
$5,000.00 |
$8,925.00 |
| 33 | 220 2800 |
(SP)SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$4,000.00 |
$2,500.00 |
$3,500.00 |
$2,250.00 |
$5,000.00 |
| 34 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$41,900.00 |
$26,400.00 |
$10,000.00 |
$23,000.00 |
$25,000.00 |
$25,300.00 |