| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 31,729 | CY |
$3.50 |
$5.00 |
$5.44 |
$3.10 |
$3.00 |
$3.31 |
| 2 | 202(C) 0184 |
UNCLASSIFIED BORROW | 2,000 | CY |
$5.00 |
$0.7500 |
$1.00 |
$4.00 |
$4.00 |
$4.41 |
| 3 | 203 7116 |
TEST ROLLING | 1 | LSUM |
$5,000.00 |
$1,000.00 |
$2,500.00 |
$1,850.00 |
$7,500.00 |
$7,815.44 |
| 4 | 223 2801 |
TEMPORARY SILT FENCE | 500 | LF |
$2.50 |
$1.28 |
$2.42 |
$1.25 |
$1.20 |
$1.34 |
| 5 | 227 0100 |
TEMPORARY SILT DIKE | 100 | LF |
$8.00 |
$4.60 |
$7.97 |
$4.79 |
$4.60 |
$5.15 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 65,990 | SY |
$1.75 |
$1.10 |
$0.9600 |
$1.05 |
$1.01 |
$1.11 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 22 | AC |
$400.00 |
$273.00 |
$262.78 |
$285.00 |
$272.00 |
$304.55 |
| 8 | 241 2832 |
MOWING | 44 | AC |
$80.00 |
$50.00 |
$47.34 |
$50.00 |
$49.00 |
$54.86 |
| 9 | 317(F) 4270 |
(SP)CEMENT TREATED BASE | 71,640 | SY |
$9.00 |
$9.40 |
$9.34 |
$11.40 |
$12.20 |
$12.00 |
| 10 | 327(K) 4300 |
(SP)STABILIZED SUBGRADE | 75,106 | SY |
$3.50 |
$3.25 |
$3.58 |
$3.50 |
$4.00 |
$4.00 |
| 11 | 403(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,713 | TON |
$25.00 |
$27.00 |
$12.64 |
$26.79 |
$26.00 |
$30.00 |
| 12 | 407 0250 |
TACK COAT | 1,265 | GAL |
$3.00 |
$2.45 |
$2.66 |
$2.85 |
$2.75 |
$3.03 |
| 13 | 408 5774 |
PRIME COAT | 18,441 | GAL |
$3.50 |
$1.00 |
$4.83 |
$1.00 |
$2.75 |
$5.52 |
| 14 | 411(S3) 5945 |
(SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) | 4,258 | TON |
$65.00 |
$61.00 |
$53.62 |
$57.59 |
$55.50 |
$61.24 |
| 15 | 411(S4) 5960 |
(SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | 1,402 | TON |
$69.00 |
$76.00 |
$66.81 |
$71.75 |
$69.15 |
$76.30 |
| 16 | 413(D) 4868 |
(SP)RUMBLE STRIP-METHOD PCC-CON | 32,517 | LF |
$0.1800 |
$0.2200 |
$0.3000 |
$0.2100 |
$0.2100 |
$0.2300 |
| 17 | 414(A) 0210 |
(SP)P.C.CONCRETE PAVEMENT(PLACEMENT) | 21,648 | SY |
$7.00 |
$4.50 |
$4.66 |
$4.80 |
$10.50 |
$7.50 |
| 18 | 414(A1) 5725 |
(SP)DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 47,383 | SY |
$10.00 |
$9.00 |
$9.64 |
$11.28 |
$12.50 |
$11.50 |
| 19 | 414(P) 6000 |
(SP)P.C. CONCRETE FOR PAVEMENT | 17,258 | CY |
$87.00 |
$81.50 |
$95.67 |
$92.99 |
$85.00 |
$90.00 |
| 20 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 104 | CY |
$20.00 |
$7.85 |
$6.06 |
$15.46 |
$15.00 |
$16.55 |
| 21 | 509(A) 0319 |
CLASS AA CONCRETE | 281 | CY |
$415.00 |
$301.00 |
$284.83 |
$420.38 |
$408.00 |
$450.20 |
| 22 | 509(D) 0325 |
CLASS C CONCRETE | 500 | CY |
$250.00 |
$213.00 |
$217.37 |
$231.83 |
$225.00 |
$248.27 |
| 23 | 511(A) 0332 |
REINFORCING STEEL | 45,447 | LB |
$1.00 |
$0.8300 |
$0.5400 |
$0.7500 |
$0.7300 |
$0.8100 |
| 24 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 2,000 | TON |
$22.00 |
$38.79 |
$21.55 |
$44.30 |
$43.00 |
$47.45 |
| 25 | 610(B) 0399 |
6" CONCRETE DRIVEWAY (H.E.S.) | 210 | SY |
$50.00 |
$36.25 |
$38.51 |
$46.37 |
$45.00 |
$52.00 |
| 26 | 611(E) 6002 |
INLET (SMD-TYPE 2) | 1 | EA |
$2,000.00 |
$2,200.00 |
$1,738.97 |
$1,597.02 |
$1,550.00 |
$1,710.30 |
| 27 | 613(B) 4495 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 42 | LF |
$60.00 |
$105.00 |
$92.26 |
$84.49 |
$82.00 |
$90.48 |
| 28 | 613(CC) 7196 |
TYPE A6 CULVERT END TREATMENT | 1 | EA |
$1,500.00 |
$825.00 |
$898.47 |
$654.26 |
$635.00 |
$700.67 |
| 29 | 613(CC) 7197 |
TYPE B6 CULVERT END TREATMENT | 32 | EA |
$1,500.00 |
$850.00 |
$801.86 |
$757.30 |
$735.00 |
$811.01 |
| 30 | 613(D) 0688 |
12" CORR. GALV. STEEL PIPE | 44 | LF |
$25.00 |
$15.50 |
$37.00 |
$20.61 |
$20.00 |
$22.07 |
| 31 | 613(D) 0690 |
24" CORR. GALV. STEEL PIPE | 1,188 | LF |
$35.00 |
$24.00 |
$56.12 |
$30.91 |
$30.00 |
$33.10 |
| 32 | 613(D) 4533 |
64" X 43" CORR. GALV. STEEL PIPE ARCH | 41 | LF |
$120.00 |
$68.00 |
$167.16 |
$71.09 |
$69.00 |
$76.14 |
| 33 | 613(P) 1091 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 180 | LF |
$10.00 |
$5.00 |
$11.59 |
$15.46 |
$15.00 |
$16.55 |
| 34 | 613(Q) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$10.00 |
$5.00 |
$11.59 |
$10.30 |
$10.00 |
$11.03 |
| 35 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$15,000.00 |
$8,000.00 |
$10,480.90 |
$7,000.00 |
$6,000.00 |
$6,620.53 |
| 36 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 10,414 | SY |
$3.00 |
$0.5000 |
$0.8200 |
$2.45 |
$1.00 |
$1.10 |
| 37 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 32,490 | SY |
$5.50 |
$1.50 |
$0.8200 |
$4.25 |
$2.10 |
$4.00 |
| 38 | 619(C) 0924 |
SAWING PAVEMENT | 300 | LF |
$3.00 |
$3.39 |
$3.56 |
$4.50 |
$3.00 |
$4.41 |
| 39 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 4 | EA |
$80.00 |
$65.00 |
$62.80 |
$67.21 |
$65.00 |
$71.72 |
| 40 | 629(C) 4960 |
MAILBOX | 4 | EA |
$35.00 |
$25.00 |
$19.32 |
$25.85 |
$25.00 |
$27.59 |
| 41 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 4 | EA |
$13.00 |
$12.00 |
$11.59 |
$10.34 |
$10.00 |
$11.04 |
| 42 | 653(C) 5946 |
OUTLET LATERAL HEADWALL | 6 | EA |
$500.00 |
$852.00 |
$289.83 |
$309.10 |
$300.00 |
$331.03 |
| 43 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$30,000.00 |
$13,000.00 |
$43,957.24 |
$15,000.00 |
$12,000.00 |
$13,241.05 |
| 44 | 627(P) 4425 |
RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN BARRIER | 1,730 | LF |
$20.00 |
$24.00 |
$14.49 |
$25.20 |
$20.75 |
$34.00 |
| 45 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 122 | SF |
$16.00 |
$21.30 |
$16.42 |
$20.68 |
$20.00 |
$22.07 |
| 46 | 851(C) 8324 |
2" SQUARE TUBE POST | 287 | LF |
$20.00 |
$12.78 |
$7.00 |
$12.41 |
$12.00 |
$13.24 |
| 47 | 854(C) 8530 |
(SP)TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 64,814 | LF |
$0.6000 |
$0.5500 |
$0.4000 |
$0.4300 |
$0.4200 |
$0.4600 |
| 48 | 859(A) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 400 | LF |
$0.2500 |
$0.8000 |
$0.9700 |
$0.5200 |
$0.5000 |
$0.5500 |
| 49 | 880(C) 8845 |
BARRICADES(TYPE III) | 21 | EA |
$200.00 |
$175.00 |
$893.64 |
$175.78 |
$170.00 |
$187.58 |
| 50 | 890A/B 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 5 | EA |
$50.00 |
$106.50 |
$96.61 |
$103.40 |
$100.00 |
$110.34 |
| 51 | 220 2800 |
(SP)SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,500.00 |
$750.00 |
$1,207.62 |
$3,000.00 |
$3,750.00 |
$5,109.06 |
| 52 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$225,000.00 |
$190,000.00 |
$300,000.00 |
$430,500.00 |
$178,000.00 |
$533,000.00 |
| 53 | 643 0087 |
(SP)CONTRACTORS QUALITY CONTROL | 1 | LSUM |
$16,800.00 |
$17,000.00 |
$15,000.00 |
$15,000.00 |
$47,500.00 |
$23,000.00 |
| 54 | 642 0098 |
STAKING | 1 | LSUM |
$25,000.00 |
$35,000.00 |
$42,508.10 |
$40,000.00 |
$30,850.00 |
$61,019.19 |
| 55 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 36,095 | CY |
$3.50 |
$5.00 |
$5.44 |
$3.10 |
$3.00 |
$3.31 |
| 56 | 202(C) 0184 |
UNCLASSIFIED BORROW | 2,000 | CY |
$5.00 |
$0.7500 |
$1.00 |
$4.00 |
$4.00 |
$4.41 |
| 57 | 203 7116 |
TEST ROLLING | 1 | LSUM |
$5,000.00 |
$1,000.00 |
$2,500.00 |
$2,600.00 |
$11,000.00 |
$7,815.44 |
| 58 | 223 2801 |
TEMPORARY SILT FENCE | 470 | LF |
$2.50 |
$1.28 |
$2.42 |
$1.25 |
$1.20 |
$1.34 |
| 59 | 227 0100 |
TEMPORARY SILT DIKE | 160 | LF |
$8.00 |
$4.60 |
$7.97 |
$4.79 |
$4.60 |
$5.15 |
| 60 | 230(A) 2806 |
SOLID SLAB SODDING | 73,140 | SY |
$2.00 |
$1.10 |
$0.9600 |
$1.05 |
$1.01 |
$1.11 |
| 61 | 233(A) 2817 |
VEGETATIVE MULCHING | 45 | AC |
$400.00 |
$273.00 |
$262.78 |
$285.00 |
$272.00 |
$304.55 |
| 62 | 241 2832 |
MOWING | 90 | AC |
$80.00 |
$50.00 |
$47.34 |
$50.00 |
$49.00 |
$54.86 |
| 63 | 317(F) 4270 |
(SP)CEMENT TREATED BASE | 97,594 | SY |
$9.00 |
$9.40 |
$9.34 |
$11.40 |
$12.20 |
$12.00 |
| 64 | 327(K) 4300 |
(SP)STABILIZED SUBGRADE | 102,823 | SY |
$3.50 |
$3.25 |
$3.58 |
$3.50 |
$4.00 |
$4.00 |
| 65 | 403(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 3,532 | TON |
$25.00 |
$27.00 |
$12.64 |
$26.79 |
$26.00 |
$28.69 |
| 66 | 407 0250 |
TACK COAT | 428 | GAL |
$3.00 |
$2.61 |
$2.66 |
$2.85 |
$2.75 |
$3.03 |
| 67 | 408 5774 |
PRIME COAT | 22,383 | GAL |
$3.50 |
$1.00 |
$4.83 |
$1.00 |
$2.75 |
$5.52 |
| 68 | 411(S3) 5940 |
(SP)ASPHALT CONCRETE TYPE S3(PG 70-28 OK) | 79 | TON |
$100.00 |
$102.93 |
$74.53 |
$80.06 |
$77.15 |
$85.13 |
| 69 | 411(S3) 5945 |
(SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) | 1,255 | TON |
$65.00 |
$67.20 |
$55.07 |
$59.15 |
$57.00 |
$62.90 |
| 70 | 411(S4) 5955 |
(SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) | 53 | TON |
$105.00 |
$115.93 |
$112.55 |
$120.89 |
$116.50 |
$128.55 |
| 71 | 411(S4) 5960 |
(SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | 596 | TON |
$69.00 |
$83.39 |
$70.23 |
$75.44 |
$72.70 |
$80.22 |
| 72 | 413(D) 4868 |
(SP)RUMBLE STRIP-METHOD PCC-CON | 43,980 | LF |
$0.1800 |
$0.2200 |
$0.3000 |
$0.2100 |
$0.2100 |
$0.2300 |
| 73 | 414(A) 0210 |
(SP)P.C.CONCRETE PAVEMENT(PLACEMENT) | 28,768 | SY |
$7.00 |
$4.50 |
$4.66 |
$4.50 |
$10.50 |
$7.50 |
| 74 | 414(A1) 5725 |
(SP)DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 64,067 | SY |
$10.00 |
$9.00 |
$9.64 |
$10.55 |
$12.50 |
$12.00 |
| 75 | 414(P) 6000 |
(SP)P.C. CONCRETE FOR PAVEMENT | 23,209 | CY |
$87.00 |
$81.50 |
$95.67 |
$92.80 |
$85.00 |
$90.00 |
| 76 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 463 | CY |
$20.00 |
$7.85 |
$6.06 |
$15.46 |
$15.00 |
$16.55 |
| 77 | 509(A) 0319 |
CLASS AA CONCRETE | 1,171 | CY |
$415.00 |
$301.00 |
$284.83 |
$420.38 |
$408.00 |
$450.20 |
| 78 | 509(D) 0325 |
CLASS C CONCRETE | 50 | CY |
$250.00 |
$213.00 |
$217.37 |
$242.13 |
$235.00 |
$259.30 |
| 79 | 511(A) 0332 |
REINFORCING STEEL | 180,830 | LB |
$1.00 |
$0.8300 |
$0.5400 |
$0.7500 |
$0.7300 |
$0.8100 |
| 80 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 2,000 | TON |
$22.00 |
$38.79 |
$21.55 |
$44.30 |
$43.00 |
$47.45 |
| 81 | 613(CC) 7197 |
TYPE B6 CULVERT END TREATMENT | 38 | EA |
$1,500.00 |
$850.00 |
$801.86 |
$757.30 |
$735.00 |
$811.01 |
| 82 | 613(D) 0688 |
12" CORR. GALV. STEEL PIPE | 88 | LF |
$25.00 |
$15.50 |
$32.18 |
$20.61 |
$20.00 |
$22.07 |
| 83 | 613(D) 0690 |
24" CORR. GALV. STEEL PIPE | 1,306 | LF |
$35.00 |
$24.00 |
$53.70 |
$30.91 |
$30.00 |
$33.10 |
| 84 | 613(D) 0695 |
54" CORR. GALV. STEEL PIPE | 42 | LF |
$95.00 |
$48.58 |
$134.75 |
$58.73 |
$57.00 |
$62.90 |
| 85 | 613(P) 1091 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 150 | LF |
$10.00 |
$5.00 |
$11.59 |
$15.46 |
$15.00 |
$16.55 |
| 86 | 613(Q) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 50 | LF |
$10.00 |
$5.00 |
$11.59 |
$10.30 |
$10.00 |
$11.03 |
| 87 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$8,000.00 |
$14,673.26 |
$15,000.00 |
$13,000.00 |
$14,344.48 |
| 88 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 3,108 | SY |
$3.00 |
$0.5000 |
$0.8200 |
$2.45 |
$1.00 |
$1.10 |
| 89 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 58,640 | SY |
$5.50 |
$1.50 |
$0.8200 |
$4.25 |
$2.10 |
$4.00 |
| 90 | 619(C) 0924 |
SAWING PAVEMENT | 1,000 | LF |
$3.00 |
$3.39 |
$2.57 |
$4.50 |
$3.00 |
$4.41 |
| 91 | 623(A) 0932 |
BEAM GUARD RAIL-W-BEAM-SINGLE | 975 | LF |
$20.00 |
$16.51 |
$14.25 |
$18.40 |
$17.80 |
$17.10 |
| 92 | 623(E) 7114 |
THRIE BEAM BRIDGE CONNECTION-TYPE A | 8 | EA |
$2,000.00 |
$1,357.88 |
$1,231.77 |
$1,550.00 |
$1,500.00 |
$1,406.86 |
| 93 | 623(H) 8571 |
(SP)G.E.T. GUARD RAIL END SECTION | 8 | EA |
$2,600.00 |
$2,231.18 |
$2,197.86 |
$2,275.00 |
$2,200.00 |
$2,311.67 |
| 94 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 11 | EA |
$80.00 |
$65.00 |
$62.80 |
$67.21 |
$65.00 |
$71.72 |
| 95 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 1 | EA |
$150.00 |
$138.45 |
$96.61 |
$134.42 |
$130.00 |
$143.44 |
| 96 | 629(C) 4960 |
MAILBOX | 13 | EA |
$35.00 |
$25.00 |
$19.32 |
$25.85 |
$25.00 |
$27.59 |
| 97 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 12 | EA |
$13.00 |
$12.00 |
$11.59 |
$10.34 |
$10.00 |
$11.03 |
| 98 | 653(C) 5946 |
OUTLET LATERAL HEADWALL | 6 | EA |
$500.00 |
$852.00 |
$289.83 |
$309.10 |
$300.00 |
$331.03 |
| 99 | 504(A) 1304 |
APPROACH SLAB | 353.4 | SY |
$140.00 |
$127.80 |
$159.41 |
$170.01 |
$165.00 |
$182.06 |
| 100 | 504(F) 6190 |
42" F-SHAPED PARAPET | 120 | LF |
$80.00 |
$133.13 |
$82.12 |
$87.58 |
$85.00 |
$93.79 |
| 101 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 60 | SY |
$3.00 |
$6.36 |
$4.11 |
$4.38 |
$4.25 |
$4.69 |
| 102 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$120,000.00 |
$37,100.00 |
$38,643.73 |
$42,000.00 |
$40,000.00 |
$44,136.85 |
| 103 | 504(A) 1304 |
APPROACH SLAB | 300 | SY |
$180.00 |
$127.80 |
$159.41 |
$170.01 |
$165.00 |
$182.06 |
| 104 | 504(F) 6190 |
42" F-SHAPED PARAPET | 120 | LF |
$80.00 |
$133.13 |
$82.12 |
$87.58 |
$85.00 |
$93.79 |
| 105 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 60 | SY |
$3.00 |
$6.36 |
$4.11 |
$4.38 |
$4.25 |
$4.69 |
| 106 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 76 | SF |
$16.00 |
$21.30 |
$16.42 |
$20.68 |
$20.00 |
$22.07 |
| 107 | 851(C) 8324 |
2" SQUARE TUBE POST | 181 | LF |
$20.00 |
$12.78 |
$7.00 |
$12.41 |
$12.00 |
$13.24 |
| 108 | 854(C) 8530 |
(SP)TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 97,364 | LF |
$0.6000 |
$0.5500 |
$0.4000 |
$0.4300 |
$0.4200 |
$0.4600 |
| 109 | 859(A) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 7,650 | LF |
$0.2500 |
$0.8000 |
$0.5300 |
$0.2100 |
$0.2000 |
$0.2200 |
| 110 | 890A/B 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 6 | EA |
$50.00 |
$106.50 |
$96.61 |
$103.40 |
$100.00 |
$110.34 |
| 111 | 220 2800 |
(SP)SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,500.00 |
$750.00 |
$1,207.62 |
$3,000.00 |
$3,750.00 |
$5,109.06 |
| 112 | 643 0087 |
(SP)CONTRACTORS QUALITY CONTROL | 1 | LSUM |
$37,200.00 |
$35,000.00 |
$35,000.00 |
$32,000.00 |
$47,500.00 |
$32,000.00 |