| 1 | 201 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$100,000.00 |
$15,225.00 |
$45,935.93 |
$45,000.00 |
$45,000.00 |
$60,000.00 |
$104,244.39 |
$80,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 242,035 | CY |
$3.00 |
$2.54 |
$2.55 |
$2.50 |
$2.50 |
$2.50 |
$4.53 |
$5.00 |
| 3 | 202(C) 0184 |
UNCLASSIFIED BORROW | 23,196 | CY |
$5.00 |
$2.55 |
$2.55 |
$2.50 |
$2.50 |
$2.50 |
$8.00 |
$7.00 |
| 4 | 205 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$286,792.00 |
$45,675.00 |
$20,415.97 |
$20,000.00 |
$20,000.00 |
$35,000.00 |
$225,229.22 |
$275,000.00 |
| 5 | 223 2801 |
TEMPORARY SILT FENCE | 5,784 | LF |
$2.50 |
$2.03 |
$1.86 |
$2.00 |
$2.00 |
$2.00 |
$1.15 |
$1.15 |
| 6 | 224 2803 |
TEMPORARY SEDIMENT FILTER | 10 | EA |
$175.00 |
$152.25 |
$154.67 |
$220.00 |
$220.00 |
$100.00 |
$78.50 |
$81.12 |
| 7 | 225 2804 |
TEMPORARY SEDIMENT BASIN | 1 | EA |
$4,000.00 |
$812.00 |
$0.00 |
$250.00 |
$250.00 |
$500.00 |
$2,896.81 |
$780.00 |
| 8 | 227 0100 |
TEMPORARY SILT DIKE | 1,452 | LF |
$6.00 |
$6.10 |
$9.49 |
$8.00 |
$8.00 |
$7.00 |
$5.75 |
$5.93 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 299,936 | SY |
$2.25 |
$1.35 |
$1.34 |
$1.30 |
$1.13 |
$1.45 |
$1.14 |
$1.17 |
| 10 | 230(F) 2812 |
WATERING | 11,997 | MGAL |
$6.00 |
$8.15 |
$8.25 |
$8.00 |
$11.50 |
$11.50 |
$11.50 |
$11.96 |
| 11 | 233(A) 2817 |
VEGETATIVE MULCHING | 124 | AC |
$500.00 |
$101.50 |
$103.11 |
$100.00 |
$325.00 |
$400.00 |
$325.00 |
$338.00 |
| 12 | 241 2832 |
MOWING | 124 | AC |
$75.00 |
$101.50 |
$103.11 |
$20.00 |
$20.00 |
$50.00 |
$50.00 |
$52.00 |
| 13 | 327(A) 4200 |
(SP)FLY ASH | 10,139 | TON |
$50.00 |
$52.70 |
$45.00 |
$43.49 |
$29.25 |
$53.66 |
$64.09 |
$65.00 |
| 14 | 327(E) 4240 |
(SP)CEMENTITIOUS STABILIZED SUBGRADE | 148,220 | SY |
$2.00 |
$2.18 |
$0.9700 |
$2.00 |
$4.30 |
$2.10 |
$1.95 |
$2.80 |
| 15 | 403(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 425 | TON |
$25.00 |
$31.05 |
$27.93 |
$33.55 |
$33.55 |
$50.00 |
$45.00 |
$55.00 |
| 16 | 407 0250 |
TACK COAT | 65,994 | GAL |
$2.00 |
$2.41 |
$2.80 |
$2.20 |
$2.55 |
$2.15 |
$2.82 |
$3.25 |
| 17 | 408 5774 |
PRIME COAT | 32,055 | GAL |
$3.00 |
$4.95 |
$4.02 |
$5.50 |
$2.75 |
$3.28 |
$5.23 |
$4.75 |
| 18 | 411(S3) 5935 |
(SP)ASPHALT CONCRETE TYPE S3(PG 76-28 OK) | 16,435 | TON |
$59.00 |
$63.75 |
$62.58 |
$70.00 |
$65.50 |
$68.00 |
$74.26 |
$81.55 |
| 19 | 411(S3) 5945 |
(SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) | 52,453 | TON |
$52.00 |
$52.89 |
$56.54 |
$59.00 |
$60.00 |
$58.00 |
$67.15 |
$74.65 |
| 20 | 411(S4) 5950 |
(SP)ASPHALT CONCRETE TYPE S4(PG 76-28 OK) | 12,963 | TON |
$70.00 |
$68.75 |
$76.12 |
$77.00 |
$77.00 |
$78.00 |
$77.53 |
$90.56 |
| 21 | 411(S4) 5960 |
(SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | 5,452 | TON |
$65.00 |
$55.37 |
$68.64 |
$61.00 |
$71.00 |
$75.00 |
$69.77 |
$81.86 |
| 22 | 413(A) 4861 |
RUMBLE STRIP-METHOD AC-CON | 66,586 | LF |
$0.2500 |
$0.1000 |
$0.0800 |
$0.0500 |
$0.0900 |
$0.2000 |
$0.1600 |
$0.2300 |
| 23 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 1,494 | CY |
$15.00 |
$10.15 |
$3.06 |
$3.00 |
$3.00 |
$3.00 |
$5.00 |
$5.20 |
| 24 | 509(A) 0319 |
CLASS AA CONCRETE | 1,662 | CY |
$450.00 |
$345.10 |
$349.52 |
$342.40 |
$342.40 |
$342.40 |
$317.00 |
$444.08 |
| 25 | 509(C) 0322 |
CLASS A CONCRETE FOR SMALL STRUCTURES | 1.26 | CY |
$400.00 |
$1,015.00 |
$1,224.96 |
$1,200.00 |
$1,200.00 |
$1,200.00 |
$400.00 |
$2,080.00 |
| 26 | 509(D) 0325 |
CLASS C CONCRETE | 72 | CY |
$300.00 |
$208.10 |
$306.24 |
$300.00 |
$300.00 |
$450.00 |
$350.00 |
$328.64 |
| 27 | 511(A) 0332 |
REINFORCING STEEL | 242,824 | LB |
$0.7500 |
$0.7100 |
$0.7700 |
$0.7500 |
$0.7500 |
$0.7500 |
$0.7500 |
$0.6200 |
| 28 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 1,190 | TON |
$35.00 |
$41.55 |
$56.40 |
$55.25 |
$55.25 |
$60.00 |
$46.31 |
$67.60 |
| 29 | 611(E) 6002 |
INLET (SMD-TYPE 2) | 10 | EA |
$1,400.00 |
$604.00 |
$1,378.08 |
$1,350.00 |
$1,350.00 |
$1,350.00 |
$1,600.00 |
$3,120.00 |
| 30 | 611(J) 0487 |
JUNCTION BOXES | 40 | CF |
$70.00 |
$101.50 |
$28.58 |
$28.00 |
$28.00 |
$28.00 |
$70.00 |
$208.00 |
| 31 | 613(B) 0491 |
18" R.C.PIPE CLASS III | 250 | LF |
$50.00 |
$33.55 |
$34.35 |
$33.65 |
$33.65 |
$33.65 |
$78.79 |
$46.80 |
| 32 | 613(B) 0492 |
24" R.C.PIPE CLASS III | 348 | LF |
$60.00 |
$40.70 |
$39.96 |
$39.15 |
$39.15 |
$39.15 |
$87.79 |
$59.28 |
| 33 | 613(B) 0494 |
36" R.C.PIPE CLASS III | 456 | LF |
$70.00 |
$66.90 |
$77.58 |
$76.00 |
$76.00 |
$76.00 |
$91.59 |
$88.40 |
| 34 | 613(B) 0496 |
48" R.C.PIPE CLASS III | 176 | LF |
$115.00 |
$99.80 |
$115.35 |
$113.00 |
$113.00 |
$113.00 |
$141.42 |
$130.00 |
| 35 | 613(B) 4495 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 200 | LF |
$60.00 |
$55.75 |
$69.67 |
$68.25 |
$68.25 |
$68.25 |
$108.19 |
$93.60 |
| 36 | 613(B) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 204 | LF |
$70.00 |
$97.15 |
$125.05 |
$122.50 |
$122.50 |
$122.50 |
$136.60 |
$135.20 |
| 37 | 613(CC) 7186 |
TYPE A4 CULVERT END TREATMENT | 2 | EA |
$1,200.00 |
$903.35 |
$484.88 |
$475.00 |
$475.00 |
$475.00 |
$1,000.00 |
$1,560.00 |
| 38 | 613(CC) 7187 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$1,400.00 |
$1,014.00 |
$551.23 |
$540.00 |
$540.00 |
$540.00 |
$1,200.00 |
$1,768.00 |
| 39 | 613(CC) 7189 |
TYPE D4 CULVERT END TREATMENT | 2 | EA |
$1,600.00 |
$1,030.25 |
$1,572.03 |
$1,540.00 |
$1,540.00 |
$1,540.00 |
$1,500.00 |
$1,976.00 |
| 40 | 613(CC) 7196 |
TYPE A6 CULVERT END TREATMENT | 2 | EA |
$1,300.00 |
$912.50 |
$964.66 |
$945.00 |
$945.00 |
$945.00 |
$1,300.00 |
$1,560.00 |
| 41 | 613(CC) 7197 |
TYPE B6 CULVERT END TREATMENT | 6 | EA |
$1,500.00 |
$964.25 |
$852.37 |
$835.00 |
$835.00 |
$835.00 |
$1,400.00 |
$1,664.00 |
| 42 | 613(CC) 7198 |
TYPE C6 CULVERT END TREATMENT | 1 | EA |
$1,600.00 |
$1,827.00 |
$2,077.32 |
$2,035.00 |
$2,035.00 |
$2,035.00 |
$1,750.00 |
$2,080.00 |
| 43 | 613(CC) 7199 |
TYPE D6 CULVERT END TREATMENT | 2 | EA |
$1,700.00 |
$2,283.75 |
$1,484.24 |
$1,454.00 |
$1,454.00 |
$1,454.00 |
$1,800.00 |
$2,184.00 |
| 44 | 613(D) 0690 |
24" CORR. GALV. STEEL PIPE | 158 | LF |
$30.00 |
$31.75 |
$30.62 |
$30.00 |
$30.00 |
$30.00 |
$51.00 |
$52.00 |
| 45 | 613(D) 0692 |
36" CORR. GALV. STEEL PIPE | 166 | LF |
$45.00 |
$48.95 |
$38.79 |
$38.00 |
$38.00 |
$38.00 |
$60.00 |
$78.00 |
| 46 | 613(D) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 76 | LF |
$25.00 |
$26.70 |
$27.56 |
$27.00 |
$27.00 |
$27.00 |
$47.73 |
$52.00 |
| 47 | 613(M) 5738 |
48" PREFAB. CULVERT END SECTION, ROUND | 3 | EA |
$1,400.00 |
$1,369.30 |
$1,224.96 |
$1,200.00 |
$1,200.00 |
$1,200.00 |
$1,195.93 |
$2,912.00 |
| 48 | 619(B) 0291 |
REMOVAL OF HEADWALL | 17 | EA |
$1,000.00 |
$888.15 |
$408.32 |
$400.00 |
$400.00 |
$400.00 |
$988.24 |
$1,175.20 |
| 49 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 79,069 | SY |
$2.00 |
$1.62 |
$2.50 |
$3.40 |
$3.10 |
$2.01 |
$2.00 |
$2.68 |
| 50 | 619(B) 4778 |
REMOVAL OF EXISTING STRUCTURES | 5 | EA |
$1,000.00 |
$1,015.00 |
$714.56 |
$700.00 |
$700.00 |
$700.00 |
$6,194.86 |
$5,200.00 |
| 51 | 619(B) 4780 |
REMOVAL OF GUARD RAIL | 880 | LF |
$4.00 |
$6.50 |
$1.02 |
$1.00 |
$1.00 |
$1.00 |
$2.00 |
$4.16 |
| 52 | 619(B) 5918 |
REMOVAL OF EXISTING PIPE | 180 | LF |
$10.00 |
$4.10 |
$15.31 |
$15.00 |
$15.00 |
$15.00 |
$39.34 |
$14.56 |
| 53 | 624(C) 4459 |
(SP)FENCE-STYLE SWF (5 BARBED WIRE) | 13,681 | LF |
$3.00 |
$3.12 |
$3.17 |
$3.07 |
$3.07 |
$3.07 |
$3.08 |
$4.18 |
| 54 | 856(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 67,000 | LF |
$0.2000 |
$0.0800 |
$0.0800 |
$0.0800 |
$0.0800 |
$0.0800 |
$0.0800 |
$0.0700 |
| 55 | 856(G) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 4,500 | EA |
$0.9000 |
$0.7500 |
$0.5800 |
$0.5500 |
$0.5500 |
$0.5500 |
$0.5500 |
$0.5000 |
| 56 | 859(A) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 1,000 | LF |
$0.4000 |
$0.5100 |
$0.5300 |
$0.5000 |
$0.5000 |
$0.5000 |
$0.5000 |
$1.04 |
| 57 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 5,760 | SD |
$0.5000 |
$0.2000 |
$0.2100 |
$0.2000 |
$0.2000 |
$0.2000 |
$0.2000 |
$0.2600 |
| 58 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,640 | SD |
$1.25 |
$0.3600 |
$0.3700 |
$0.3500 |
$0.3500 |
$0.3500 |
$0.3500 |
$2.08 |
| 59 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 5,760 | SD |
$1.50 |
$1.02 |
$1.05 |
$1.00 |
$1.00 |
$1.00 |
$1.00 |
$1.04 |
| 60 | 880(C) 8842 |
BARRICADES(TYPE III) | 6,120 | SD |
$2.00 |
$0.5100 |
$0.5300 |
$0.5000 |
$0.5000 |
$0.5000 |
$0.5000 |
$0.2600 |
| 61 | 880(C) 8845 |
BARRICADES(TYPE III) | 3 | EA |
$250.00 |
$1,268.75 |
$1,315.46 |
$1,250.00 |
$1,250.00 |
$1,250.00 |
$1,300.00 |
$676.00 |
| 62 | 880(C) 8848 |
WING BARRICADES | 600 | SD |
$2.00 |
$1.02 |
$1.05 |
$1.00 |
$1.00 |
$1.00 |
$1.00 |
$2.08 |
| 63 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 1,800 | SD |
$0.1500 |
$0.5100 |
$0.5300 |
$0.5000 |
$0.5000 |
$0.5000 |
$0.5000 |
$1.04 |
| 64 | 880(E) 8872 |
WARNING LIGHTS(TYPE C) | 12,060 | SD |
$0.1500 |
$0.1200 |
$0.1300 |
$0.1200 |
$0.1200 |
$0.1200 |
$0.1200 |
$0.1000 |
| 65 | 880(F) 8878 |
DRUMS | 25,500 | SD |
$0.3000 |
$0.1500 |
$0.1600 |
$0.1500 |
$0.1500 |
$0.1500 |
$0.1500 |
$0.1000 |
| 66 | 880(G) 8890 |
CHANNELIZER CONES | 37,200 | SD |
$0.1500 |
$0.1500 |
$0.1600 |
$0.1500 |
$0.1500 |
$0.1500 |
$0.1500 |
$0.1000 |
| 67 | 882(A) 8303 |
PORTABLE CHANGEABLE MESSAGE SIGN | 1 | EA |
$14,000.00 |
$1,522.50 |
$1,578.55 |
$1,500.00 |
$1,500.00 |
$1,500.00 |
$1,500.00 |
$14,559.79 |
| 68 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 418.1 | SF |
$15.00 |
$12.20 |
$12.63 |
$12.00 |
$12.00 |
$12.00 |
$12.00 |
$10.40 |
| 69 | 851(C) 8324 |
2" SQUARE TUBE POST | 646 | LF |
$7.00 |
$8.15 |
$8.42 |
$8.00 |
$8.00 |
$8.00 |
$8.00 |
$6.24 |
| 70 | 854(C) 8525 |
(SP)TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) | 24 | EA |
$120.00 |
$117.74 |
$122.07 |
$116.00 |
$116.00 |
$116.00 |
$116.00 |
$208.00 |
| 71 | 854(C) 8530 |
(SP)TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 81,585 | LF |
$0.4000 |
$0.3900 |
$0.4000 |
$0.3800 |
$0.3800 |
$0.3800 |
$0.3800 |
$0.3300 |
| 72 | 854(C) 8555 |
(SP)TRAFFIC STRIPE(MULTI-POLYMER)(24" WIDE) | 250 | LF |
$2.00 |
$6.39 |
$6.63 |
$6.30 |
$6.30 |
$6.30 |
$6.30 |
$11.44 |
| 73 | 642 0098 |
STAKING | 1 | LSUM |
$65,000.00 |
$41,615.00 |
$55,000.00 |
$50,000.00 |
$43,650.00 |
$50,000.00 |
$32,000.00 |
$200,000.00 |
| 74 | 220 2800 |
(SP)SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,500.00 |
$5,582.50 |
$2,500.00 |
$5,000.00 |
$7,500.00 |
$20,000.00 |
$2,000.00 |
$15,000.00 |
| 75 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$333,500.00 |
$336,600.00 |
$325,000.00 |
$302,000.00 |
$280,000.00 |
$465,000.00 |
$350,000.00 |
$635,000.00 |
| 76 | 643 0087 |
(SP)CONTRACTORS QUALITY CONTROL | 1 | LSUM |
$36,800.00 |
$40,600.00 |
$61,000.00 |
$36,800.00 |
$98,000.00 |
$95,000.00 |
$63,000.00 |
$41,600.00 |