| 1 | 201 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$5,000.00 |
$4,250.00 |
$8,250.00 |
$13,449.42 |
$12,500.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 3,088 | CY |
$9.00 |
$3.00 |
$3.92 |
$6.50 |
$11.72 |
$8.80 |
| 3 | 202(C) 0184 |
UNCLASSIFIED BORROW | 2,184 | CY |
$12.00 |
$4.00 |
$5.25 |
$7.75 |
$12.87 |
$22.10 |
| 4 | 205 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,000.00 |
$2,000.00 |
$2,500.00 |
$5,500.00 |
$16,265.36 |
$4,700.00 |
| 5 | 223 2801 |
TEMPORARY SILT FENCE | 200 | LF |
$7.00 |
$1.89 |
$1.75 |
$2.00 |
$2.08 |
$3.35 |
| 6 | 227 0100 |
TEMPORARY SILT DIKE | 56 | LF |
$15.00 |
$7.35 |
$10.00 |
$7.70 |
$8.08 |
$11.50 |
| 7 | 229 4318 |
DITCH LINER PROTECTION | 208 | LF |
$10.00 |
$1.89 |
$1.90 |
$2.00 |
$2.08 |
$2.20 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 9,376 | SY |
$4.00 |
$1.42 |
$1.45 |
$1.50 |
$1.56 |
$1.65 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.93 | AC |
$800.00 |
$105.00 |
$100.00 |
$100.00 |
$115.44 |
$125.00 |
| 10 | 327(A) 4200 |
(SP)FLY ASH | 81 | TON |
$170.00 |
$80.00 |
$70.00 |
$66.00 |
$68.11 |
$75.38 |
| 11 | 327(D) 4230 |
(SP)LIME | 11 | TON |
$300.00 |
$200.00 |
$180.00 |
$285.00 |
$296.67 |
$206.00 |
| 12 | 327(E) 4240 |
(SP)CEMENTITIOUS STABILIZED SUBGRADE | 1,969 | SY |
$7.00 |
$3.00 |
$5.30 |
$9.00 |
$9.52 |
$3.55 |
| 13 | 327(G) 4260 |
(SP)LIME PRETREATMENT | 563 | SY |
$7.00 |
$3.00 |
$3.85 |
$12.00 |
$13.27 |
$12.40 |
| 14 | 403(A) 0217 |
TRAFFIC BOUND SURFACE COURSE TYPE A | 4 | TON |
$60.00 |
$30.00 |
$150.00 |
$165.00 |
$45.32 |
$266.00 |
| 15 | 407 0250 |
TACK COAT | 178 | GAL |
$8.00 |
$3.15 |
$6.00 |
$7.25 |
$7.50 |
$4.20 |
| 16 | 408 5774 |
PRIME COAT | 363 | GAL |
$10.00 |
$6.83 |
$10.00 |
$8.50 |
$9.23 |
$5.90 |
| 17 | 411(S3) 5945 |
(SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) | 642 | TON |
$70.00 |
$82.95 |
$96.00 |
$100.00 |
$103.89 |
$92.77 |
| 18 | 411(S4) 5960 |
(SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | 178 | TON |
$80.00 |
$96.60 |
$140.00 |
$130.00 |
$132.75 |
$109.67 |
| 19 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 194 | CY |
$22.00 |
$6.00 |
$8.50 |
$20.00 |
$13.40 |
$11.00 |
| 20 | 509(A) 0319 |
CLASS AA CONCRETE | 487 | CY |
$400.00 |
$267.00 |
$317.50 |
$320.00 |
$492.42 |
$525.00 |
| 21 | 509(D) 0325 |
CLASS C CONCRETE | 43 | CY |
$265.00 |
$225.00 |
$285.00 |
$300.00 |
$297.50 |
$350.00 |
| 22 | 511(A) 0332 |
REINFORCING STEEL | 69,630 | LB |
$0.8000 |
$0.7500 |
$0.6900 |
$0.8000 |
$0.7400 |
$0.8500 |
| 23 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 189 | TON |
$40.00 |
$40.00 |
$38.00 |
$39.60 |
$38.89 |
$37.00 |
| 24 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$25,000.00 |
$2,000.00 |
$6,000.00 |
$11,000.00 |
$21,660.93 |
$10,500.00 |
| 25 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,055 | SY |
$5.00 |
$4.00 |
$8.00 |
$5.50 |
$9.87 |
$5.00 |
| 26 | 619(C) 0924 |
SAWING PAVEMENT | 1,334 | LF |
$4.00 |
$2.00 |
$5.00 |
$2.20 |
$3.33 |
$3.00 |
| 27 | 624(C) 4459 |
(SP)FENCE-STYLE SWF (5 BARBED WIRE) | 1,157 | LF |
$8.00 |
$4.43 |
$4.56 |
$4.15 |
$4.95 |
$6.00 |
| 28 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 1,600 | LF |
$0.9000 |
$1.32 |
$1.30 |
$1.40 |
$1.45 |
$2.45 |
| 29 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 4,320 | SD |
$0.1200 |
$0.0200 |
$0.0500 |
$0.0300 |
$0.0200 |
$0.2000 |
| 30 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,080 | SD |
$0.8500 |
$0.0200 |
$0.0500 |
$0.0300 |
$0.0200 |
$0.6500 |
| 31 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 240 | SD |
$1.20 |
$6.30 |
$6.60 |
$7.00 |
$6.93 |
$4.10 |
| 32 | 880(C) 8842 |
BARRICADES(TYPE III) | 600 | SD |
$1.10 |
$0.5800 |
$0.6200 |
$0.7500 |
$0.6300 |
$1.85 |
| 33 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 1,200 | SD |
$0.2000 |
$0.3200 |
$0.3300 |
$0.3500 |
$0.3500 |
$0.4000 |
| 34 | 882(B) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 15 | SD |
$20.00 |
$36.75 |
$39.00 |
$40.00 |
$40.40 |
$82.00 |
| 35 | 642 0098 |
STAKING | 1 | LSUM |
$46,000.00 |
$2,100.00 |
$3,000.00 |
$2,200.00 |
$5,309.96 |
$5,000.00 |
| 36 | 220 2800 |
(SP)SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,000.00 |
$1,000.00 |
$3,000.00 |
$2,000.00 |
$2,854.60 |
$3,500.00 |
| 37 | 640 1398 |
FIELD OFFICE | 1 | EA |
$5,000.00 |
$1,500.00 |
$4,900.00 |
$2,000.00 |
$5,083.37 |
$5,000.00 |
| 38 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$50,000.00 |
$16,000.00 |
$13,250.00 |
$20,000.00 |
$12,364.41 |
$55,000.00 |