| FY 2025 | 3-08006-0180 3080060180 | District 3 | I-80 | Preservation - Pavements Smart Overlay 1 Mi W of ILL 26 to 1 Mi W of ILL 89 | $25,000,000 | Planned | ||
| FY 2025 | 3-08050-0061 3080500061 | District 3 | I-80 | Rehabilitation - Pavement Designed Overlay, Resurfacing (Int-4th) 0.1 Mi E of ILL 351 to 0.3 Mi W of ILL 178 | $18,000,000 | Planned | ||
| FY 2025 | 3-27052-0000 3270520000 | District 3 | (southbound)I-57 | Reconstruction - Bridges Bridge Replacement Big Four Ditch 2.4 Mi S of ILL 9 | $7,000,000 | Planned | ||
| FY 2025 | 3-27053-0000 3270530000 | District 3 | (northbound)I-57 | Reconstruction - Bridges Bridge Replacement Big Four Ditch 2.4 Mi S of ILL 9 | $7,000,000 | Planned | ||
| FY 2025 | 3-32025-0000 3320250000 | District 3 | US-6 | Maintenance - Bridges Bridge Repair Aux Sable Creek 4.9 Mi E of ILL 47 in Channahon | $2,000,000 | Planned | ||
| FY 2025 | 3-37053-0000 3370530000 | District 3 | 4th StLong Point Rd | Rehabilitation - Pavement Designed Overlay Main St in Long Point to ILL 23 | $2,300,000 | Planned | ||
| FY 2025 | 3-38001-0000 3380010000 | District 3 | (southbound)I-57 | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay Sugar Creek 1 Mi S of US 24 | $1,250,000 | Planned | ||
| FY 2025 | 3-38002-0000 3380020000 | District 3 | (northbound)I-57 | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay Sugar Creek 1 Mi S of US 24 | $1,250,000 | Planned | ||
| FY 2025 | 3-38007-0000 3380070000 | District 3 | (northbound)I-57 | Rehabilitation - Bridges Bridge New Deck W 2nd St 1.2 Mi N of US 24 | $2,000,000 | Planned | ||
| FY 2025 | 3-38008-0000 3380080000 | District 3 | (southbound)I-57 | Rehabilitation - Bridges Bridge New Deck W 2nd St 1.2 Mi N of US 24 | $2,000,000 | Planned | ||
| FY 2025 | 3-38031-0000 3380310000 | District 3 | I-57 | Preservation - Bridges Bridge Painting, Bridge Joint Replace/Repair, Bridge Deck Overlay At US 24 Intchg (Overhead) in Gilman | $3,000,000 | Planned | ||
| FY 2025 | 3-38057-2509 3380572509 | District 3 | I-57 | Miscellaneous Improvement Culvert Repair Stream 0.9 Mi N of US 24 | $500,000 | Planned | ||
| FY 2025 | 3-38086-0000 3380860000 | District 3 | I-57 | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay At TR 155 (Overhead) 2 Mi N of US 24 | $1,250,000 | Planned | ||
| FY 2025 | 3-38115-0000 3381150000 | District 3 | US-45US-52 | Reconstruction - Bridges Bridge Replacement Langan Creek 5.2 Mi N of US 52 | $3,000,000 | Planned | ||
| FY 2025 | 3-38117-0000 3381170000 | District 3 | US-45US-52 | Reconstruction - Bridges Bridge Replacement Prairie Creek 1.3 Mi N of US 52 | $2,200,000 | Planned | ||
| FY 2025 | 3-38129-0000 3381290000 | District 3 | I-57 | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay At TR 58A (Overhead) 1.2 Mi S of US 24 | $1,500,000 | Planned | ||
| FY 2025 | 3-40008-0000 3400080000 | District 3 | Old Us 24 | Rehabilitation - Pavement Designed Overlay US 24 to 0.4 Mi E (Dead End) | $300,000 | Planned | ||
| FY 2025 | 3-40029-0000 3400290000 | District 3 | 2600e | Rehabilitation - Pavement Designed Overlay ILL 29 to 0.8 Mi S of 2600E Rd (Dead End) | $600,000 | Planned | ||
| FY 2025 | 3-47071-2514 3470712514 | District 3 | IL-71 | Miscellaneous Improvement Culvert Removal Stream 0.1 Mi SW of Fennel Rd in Newark | $200,000 | Planned | ||
| FY 2025 | 3-50058-0000 3500580000 | District 3 | US-52 | Reconstruction - Bridges Bridge Replacement Fox River 2.1 Mi W of ILL 71 | $11,000,000 | Planned | ||
| FY 2025 | 3-50059-0100 3500590100 | District 3 | US-52 | Reconstruction - Bridges Bridge Replacement Mission Creek 0.3 Mi W of ILL 71 | $1,200,000 | Planned | ||
| FY 2025 | 3-50124-0000 3501240000 | District 3 | IL-71 | Reconstruction - Bridges Bridge Replacement Cedar Creek 3 Mi W of I-39 | $1,000,000 | Planned | ||
| FY 2025 | 3-50254-0000 3502540000 | District 3 | N 4550th RdWater St / | Reconstruction - Bridges Bridge Replacement Creek 0.4 Mi N of US 34 in Earlville | $1,400,000 | Planned | ||
| FY 2025 | 3-53098-0100 3530980100 | District 3 | US-24 | Reconstruction - Bridges Bridge Replacement Stream 3.6 Mi W of ILL 115 (N) at Piper City | $1,000,000 | Planned | ||
| FY 2025 | 3-53103-0100 3531030100 | District 3 | IL-116 | Reconstruction - Bridges Bridge Replacement Short Point Creek 5.4 Mi E of ILL 251 | $1,000,000 | Planned | ||
| FY 2025 | 3-53149-0000 3531490000 | District 3 | IL-23 | Rehabilitation - Bridges Bridge New Deck BNSF RR & Vermilion River 0.8 mi s of LaSalle Co line | $13,000,000 | Planned | ||
| FY 2025 | 3-77700-0250 3777000250 | District 3 | I-80 | Maintenance - Bridges Bridge Repair ILL 251 Intchg in Peru | $2,000,000 | Planned | ||
| FY 2025 | 4-00015-0100 4000150100 | District 4 | IL-78IL-97US-136 | Preservation - Bridges Bridge Painting, Bridge Repair Illinois River at Havana | $15,000,000 | Planned | ||
| FY 2025 | 4-00025-0500 4000250500 | District 4 | IL-90IL-91 | Rehabilitation - Pavement Designed Overlay ILL 91 (N) in Princeville to ILL 91 (S) N of Dunlap | $5,200,000 | Planned | ||
| FY 2025 | 4-00112-0170 4001120170 | District 4 | IL-6 | Rehabilitation - Pavement Designed Overlay, Patching, Shoulder Repair N of ILL 29 to ILL 40 (Knoxville Ave) in Peoria | $17,000,000 | Planned | ||
| FY 2025 | 4-00143-0220 4001430220 | District 4 | IL-17 | Rehabilitation - Pavement Designed Overlay Lacon ECL to ILL 89 | $10,000,000 | Planned | ||
| FY 2025 | 4-00143-0320 4001430320 | District 4 | IL-17 | Rehabilitation - Pavement Designed Overlay ILL 89 to W of I-39 | $10,100,000 | Planned | ||
| FY 2025 | 4-00219-0200 4002190200 | District 4 | US-150 | Rehabilitation - Pavement Standard Overlay ILL 117 to McLean Co Line | $10,800,000 | Planned | ||
| FY 2025 | 4-00551-0400 4005510400 | District 4 | IL-41 | Rehabilitation - Pavement Designed Overlay Avon SCL to ILL 9 | $5,584,000 | Planned | ||
| FY 2025 | 4-00840-0200 4008400200 | District 4 | IL-78Old Ill 78 | Rehabilitation - Pavement Standard Overlay, Designed Overlay ILL 78: Fort St in Farmington to 0.2 Mi N of Alder St in Canton; Old ILL 78: ILL 78 (N) to ILL 78 (S) in Norris | $8,500,000 | Planned | ||
| FY 2025 | 4-02024-2408 4020242408 | District 4 | IL-110IL-336US-136 | Preservation - Pavements Crack & Joint Sealing 0.6 Mi S of US 136 to US 67 (N) | $200,000 | Planned | ||
| FY 2025 | 4-02024-2409 4020242409 | District 4 | E Fort StIL-116IL-78 | Preservation - Pavements Crack & Joint Sealing ILL 78/116 (Fort St): N Lightfoot RD to S Main ST & ILL 78 (S Main St): Fort St to S of E Spring St in Farmington | $100,000 | Planned | ||
| FY 2025 | 4-02024-2410 4020242410 | District 4 | IL-78IL-97US-24 | Preservation - Pavements Crack & Joint Sealing US 24: Maple St in Lewistown to Little America; ILL 78/97: US 24 to S of Clark Rd | $250,000 | Planned | ||
| FY 2025 | 4-02024-2411 4020242411 | District 4 | IL-164US-34US-67 | Preservation - Pavements Crack & Joint Sealing N of Jct US 34 (W) to E of 11th St in Monmouth | $300,000 | Planned | ||
| FY 2025 | 4-02024-2412 4020242412 | District 4 | I-74US-34 | Preservation - Pavements Crack & Joint Sealing 0.4 Mi N of US 34 to 0.3 Mi N of Main St in Galesburg & Ramps at I-74 / US 34 Intchg | $350,000 | Planned | ||
| FY 2025 | 4-02024-2413 4020242413 | District 4 | IL-61 | Preservation - Pavements Crack & Joint Sealing US 136 / ILL 336 to 0.1 Mi N of Lamb Rd in Colmar | $200,000 | Planned | ||
| FY 2025 | 4-02024-2601 4020242601 | District 4 | IL-100 | Preservation - Pavements Cape Seal US 136 to 0.4 Mi S of Schuyler Co Line | $1,500,000 | Planned | ||
| FY 2025 | 4-02024-2602 4020242602 | District 4 | US-24 BUSWashington Rd | Preservation - Pavements Cape Seal E of Lynn St in Washington to US 24 | $900,000 | Planned | ||
| FY 2025 | 4-02024-2801 4020242801 | District 4 | US-67 BUS | Preservation - Pavements Smart Overlay 0.5 Mi S of 90th Ave to 0.4 Mi S of 60th Ave | $1,395,000 | Planned | ||
| FY 2025 | 4-02024-2904 4020242904 | District 4 | IL-100US-136US-24 | Preservation - Pavements Smart Overlay Izaack Walton Rd to Back Rd | $3,755,000 | Planned | ||
| FY 2025 | 4-02025-2600 4020252600 | District 4 | I-474US-24 | Preservation - Pavements Microsurfacing 2 Pass Illinois River to I-74 | $2,500,000 | Planned | ||
| FY 2025 | 4-02025-2602 4020252602 | District 4 | IL-29MainUS-24 | Preservation - Pavements Smart Overlay S of Highland / Rusche St to N of Wesley Rd in Creve Coeur | $1,120,000 | Planned | ||
| FY 2025 | 4-02025-2603 4020252603 | District 4 | IL-40 | Preservation - Pavements Smart Overlay Bradford SCL to ILL 17 (W) | $3,235,000 | Planned | ||
| FY 2025 | 4-02126-0100 4021260100 | District 4 | IL-40 | Safety Traf Signal Installation at ILL 6 (NB) Ramp Terminal in Peoria | $2,102,000 | Planned | ||
| FY 2025 | 4-02205-0450 4022050450 | District 4 | US-67 | Rehabilitation - Pavement Designed Overlay Grindstone Creek At Industry NCL to N 200th Rd | $8,200,000 | Planned | ||
| FY 2025 | 4-02922-0400 4029220400 | District 4 | IL-100US-136US-24 | Rehabilitation - Pavement Standard Overlay S of Back Rd to N of Rut Rd & JCT US 24 / US 136 / ILL 100 (S) | $3,500,000 | Planned | ||
| FY 2025 | 4-03024-2440 4030242440 | District 4 | US-24 | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Approach Roadway, Bridge Deck Overlay US 24 BUS (Overhead) 0.5 mi e of Grange Rd w of Washington | $1,000,000 | Planned | ||
| FY 2025 | 4-03024-2470 4030242470 | District 4 | I-74IL-29 | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay, Slopewall Repair ILL 40 (Overhead) | $1,000,000 | Planned | ||
| FY 2025 | 4-03024-2480 4030242480 | District 4 | IL-8 | Preservation - Bridges Bridge Painting, Bridge Joint Replace/Repair Over UP RR 0.2 Mi E of Reservoir Blvd | $1,200,000 | Planned | ||
| FY 2025 | 4-03024-2510 4030242510 | District 4 | IL-26 | Preservation - Bridges Bridge Repair, Bridge Joint Replace/Repair, Bridge Deck Overlay Snag Creek S of Washburn Rd; Dry Creek 0.5 Mi S of Columbia Rd; Richland Creek S of Banta Rd; Partridge Creek S of Northcreek Rd; Blalock Creek 1.3 Mi S of Lourdes Rd | $2,700,000 | Planned | ||
| FY 2025 | 4-03617-0000 4036170000 | District 4 | IL-94 | Rehabilitation - Pavement Designed Overlay ILL 116 to 300N | $7,000,000 | Planned | ||
| FY 2025 | 4-04320-0250 4043200250 | District 4 | IL-122 | Rehabilitation - Pavement Designed Overlay W of I-155 to 2.1 mi E of Hopedale | $6,500,000 | Planned | ||
| FY 2025 | 4-04320-0550 4043200550 | District 4 | IL-122 | Rehabilitation - Pavement Designed Overlay 2.1 mi E of Hopedale to McLean Co Line | $7,000,000 | Planned | ||
| FY 2025 | 4-04822-0000 4048220000 | District 4 | US-34 | Rehabilitation - Pavement Standard Overlay W of Knox County Rd 900E to 0.8 mi E of CH 9 | $7,100,000 | Planned | ||
| FY 2025 | 4-04825-0000 4048250000 | District 4 | IL-110US-34 | Maintenance - Pavements Designed Overlay 0.4 Mi W to 1.2 Mi E of I-74 | $3,500,000 | Planned | ||
| FY 2025 | 4-05524-0100 4055240100 | District 4 | US-136 | Rehabilitation - Pavement Designed Overlay 0.1 mi W of TR 226 to 0.1 mi W of CH 18 | $2,900,000 | Planned | ||
| FY 2025 | 4-06165-0500 4061650500 | District 4 | IL-6 | Rehabilitation - Pavement Designed Overlay, Patching, Shoulder Repair US 150 to S of I-74 | $16,000,000 | Planned | ||
| FY 2025 | 4-06165-0510 4061650510 | District 4 | IL-6 | Rehabilitation - Pavement Designed Overlay, Patching, Shoulder Repair 0.7 Mi N of Hoerr's Pond to US 150 | $8,000,000 | Planned | ||
| FY 2025 | 4-06220-0400 4062200400 | District 4 | IL-89 | Rehabilitation - Pavement Designed Overlay Putnam Co Line to ILL 17 | $7,000,000 | Planned | ||
| FY 2025 | 4-07010-0200 4070100200 | District 4 | I-74 | Rehabilitation - Pavement Standard Overlay, Resurfacing (Int-4th) 0.5 Mi E of Ch 9 to E of ILL 97 Intchg | $7,000,000 | Planned | ||
| FY 2025 | 4-07010-0201 4070100201 | District 4 | I-74 | Rehabilitation - Pavement Standard Overlay, Resurfacing (Int-4th) 0.3 Mi W of East Main St in Galesburg to 0.5 Mi E of Ch 9 | $8,000,000 | Planned | ||
| FY 2025 | 4-07010-0202 4070100202 | District 4 | Main St | Rehabilitation - Pavement Designed Overlay 0.2 mi E of Michigan Ave to 0.1 mi E of Soangetaha Rd in Galesburg | $900,000 | Planned | ||
| FY 2025 | 4-07010-0203 4070100203 | District 4 | IL-97US-150 | Rehabilitation - Pavement Designed Overlay US 150: 0.2 mi E of I-74 W ramp to 0.1 mi W of JCT ILL 97 (S); ILL 97: JCT US 150 (W) to S of CH 17 | $2,000,000 | Planned | ||
| FY 2025 | 4-07217-0200 4072170200 | District 4 | IL-8 | Rehabilitation - Pavement Designed Overlay 0.7 mi E of Taylor Rd to I-474 | $5,100,000 | Planned | ||
| FY 2025 | 4-07217-0400 4072170400 | District 4 | IL-8 | Rehabilitation - Pavement Designed Overlay Texas Rd to Taylor Rd | $8,200,000 | Planned | ||
| FY 2025 | 4-07220-0400 4072200400 | District 4 | IL-116 | Rehabilitation - Pavement Designed Overlay Kickapoo Creek to Griswold St | $3,500,000 | Planned | ||
| FY 2025 | 4-07220-1400 4072201400 | District 4 | Farmington RdIL-8 | Maintenance - Pavements Standard Overlay E of Kickapoo Creek to Main St | $3,000,000 | Planned | ||
| FY 2025 | 4-07224-0000 4072240000 | District 4 | IL-78IL-8 | Rehabilitation - Pavement Designed Overlay US 150 to ILL 8 | $8,000,000 | Planned | ||
| FY 2025 | 4-07224-0200 4072240200 | District 4 | IL-78US-150 | Rehabilitation - Pavement Standard Overlay 0.1 mi N of N Jct ILL 78 / US 150 to 0.1 mi N of I-74 | $5,000,000 | Planned | ||
| FY 2025 | 4-07225-0000 4072250000 | District 4 | IL-90 | Rehabilitation - Pavement Standard Overlay ILL 90/91 JCT (E) to ILL 40 | $2,750,000 | Planned | ||
| FY 2025 | 4-08450-0200 4084500200 | District 4 | Osceola Rd | Rehabilitation - Pavement Designed Overlay E Osceola Rd to ILL 93 | $2,500,000 | Planned | ||
| FY 2025 | 4-08825-0000 4088250000 | District 4 | AreaCamp Grove RestIL-40 | Rehabilitation - Pavement Designed Overlay 0.6 mi N of JCT ILL 17 (W) | $300,000 | Planned | ||
| FY 2025 | 4-09018-0500 4090180500 | District 4 | IL-116IL-116US-150 | Preservation - Bridges Bridge Deck Overlay At ILL 116 Ramp (NB) to US 150 (WB) | $1,000,000 | Planned | ||
| FY 2025 | 4-09022-0000 4090220000 | District 4 | IL-8Mccluggage RdUS-24 BUS | Rehabilitation - Pavement Standard Overlay US 24 to ILL 8 | $4,000,000 | Planned | ||
| FY 2025 | 4-09022-0300 4090220300 | District 4 | IL-98 | Rehabilitation - Pavement Designed Overlay ILL 29 to 0.2 mi E of Parkway Dr | $2,400,000 | Planned | ||
| FY 2025 | 4-09023-0100 4090230100 | District 4 | IL-29MainUS-24 | Miscellaneous Improvement Drainage N of Ravine St to S of Center St in East Peoria | $800,000 | Planned | ||
| FY 2025 | 4-09025-0000 4090250000 | District 4 | IL-29MainUS-24 | Rehabilitation - Pavement Designed Overlay S of Poplar St to S of Highland / Rusche St in Creve Coeur | $500,000 | Planned | ||
| FY 2025 | 4-09417-0200 4094170200 | District 4 | 20th StNorth St | Rehabilitation - Pavement Designed Overlay 20th St: US 34 to North St in Kirkwood; North St: 20th St to US 34 in Kirkwood | $1,530,000 | Planned | ||
| FY 2025 | 4-09850-0300 4098500300 | District 4 | IL-40 | Maintenance - Pavements Smart Overlay at ILL 6 (NB) Ramp Terminal in Peoria | $220,000 | Planned | ||
| FY 2025 | 4-50401-1100 4504011100 | District 4 | US-34 | Initial Construction - Pa Additional Lanes TR 190 E of Biggsville to 20th St S of Kirkwood | $60,000,000 | Planned | ||
| FY 2025 | 4-50401-1150 4504011150 | District 4 | US-34 | Initial Construction - Pa Utility Adjustment TR 190 E of Biggsville to 20th St S of Kirkwood | $500,000 | Planned | ||
| FY 2025 | 5-52980-0000 5529800000 | District 5 | IL-9 | Reconstruction - Bridges Bridge Replacement At stream 0.4 mi W of 3200 East Rd NW of Arrowsmith | $1,500,000 | Planned | ||
| FY 2025 | 5-53008-0000 5530080000 | District 5 | Center StUS-51 BUSWoodlawn Ave | Rehabilitation - Pavement Standard Overlay, ADA Improvements, Traf Signal Modernization US 51 Byp (N) to US 51 Byp (S) in Clinton | $5,400,000 | Planned | ||
| FY 2025 | 5-53008-0300 5530080300 | District 5 | US-51 BUS | Preservation - Bridges Culvert Replacement At Coon Creek 0.2 mi S of Clinton & At stream at Clinton SCL | $1,500,000 | Planned | ||
| FY 2025 | 5-53008-0500 5530080500 | District 5 | Center StUS-51 BUSWoodlawn Ave | Rehabilitation - Pavement Utility Adjustment US 51 Byp (N) to US 51 Byp (S) in Clinton | $50,000 | Planned | ||
| FY 2025 | 5-53149-0000 5531490000 | District 5 | I-74 | Preservation - Pavements Smart Overlay 0.4 mi E of US 51 Bus S of Bloomington to CH 36 (700 N Rd) at Downs | $16,500,000 | Planned | ||
| FY 2025 | 5-53151-0000 5531510000 | District 5 | IL-9 | Rehabilitation - Pavement Designed Overlay Tazewell Co Line to ILL 122 | $7,000,000 | Planned | ||
| FY 2025 | 5-53179-0000 5531790000 | District 5 | US-136 | Miscellaneous Improvement Drainage At ILL 54 SW of Bellflower | $2,000,000 | Planned | ||
| FY 2025 | 5-53274-0000 5532740000 | District 5 | US-150 | Reconstruction - Bridges Bridge Replacement 0.3 mi W of D&EI RR to 0.1 mi E of N 1800th St E of Paris | $6,000,000 | Planned | ||
| FY 2025 | 5-53278-0000 5532780000 | District 5 | I-74 | Reconstruction - Bridges Bridge Replacement Stony Creek 2.4 Mi E of ILL 49 | $8,000,000 | Planned | ||
| FY 2025 | 5-53367-0000 5533670000 | District 5 | IL-32 | Preservation - Bridges Bridge Deck Overlay At Sangamon River 4.3 mi S of Cisco | $2,500,000 | Planned | ||
| FY 2025 | 5-53379-0000 5533790000 | District 5 | IL-133 | Rehabilitation - Pavement Designed Overlay 0.5 mi E of I-57 to Coles Co Line | $27,100,000 | Planned | ||
| FY 2025 | 5-53379-0300 5533790300 | District 5 | IL-133 | Rehabilitation - Pavement Utility Adjustment 0.5 mi E of I-57 to Coles Co Line | $1,000,000 | Planned | ||
| FY 2025 | 5-53379-0500 5533790500 | District 5 | IL-133 | Safety Culvert Extension 0.5 mi E of I-57 to Coles Co Line | $3,643,000 | Planned | ||
| FY 2025 | 5-53379-0600 5533790600 | District 5 | IL-133 | Miscellaneous Improvement Culvert Replacement 0.1 MI E OF EGYPTIAN TRAIL; 0.2 MI E OF 1200E RD; 0.4 MI E OF 1375E (ALL E OF ARCOLA) | $2,600,000 | Planned |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.