| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 19, 2024 | 61H98 | WillDistrict 1 | Pavement widening and reconstruction, storm sewer, sidewalk replacment, curb and gutter replacement, concrete box culvert, pavement markings, traffic signals, and water main replacement on IL 7 from Lincoln Street to Summit Drive in Lockport. | — | Executed | Austin Tyler Construction, Inc. $10,458,102 · | ||
| Jan 19, 2024 | 61J97 | WillDistrict 1 | Resurfacing on St. Francis Road from US 45 to 88th Avenue in Frankfort | — | Executed | P. T. Ferro Construction Co. $856,758 · | ||
| Jan 19, 2024 | 62H58 | WillDistrict 1 | Parking lot improvement. Full depth removal and replacement of existing pavement. Location: Movable Bridge Maintenance Yard (105 Bridge Street) in the City of Joliet, Will County. | — | Executed | Austin Tyler Construction, Inc. $211,505 · | ||
| Jan 19, 2024 | 62R89 | WillDistrict 1 | The reconstruction of I-80 mainline pavement from west of Joliet Junction Trail to Wheeler Avenue The project consists of the reconstruction of I-80 mainline pavement from west of Joliet Junction Trail to Wheeler Avenue. The work also includes reconstruction of the I-80 EB Bridge over Joliet Junction Trail, the l-80 WB Bridge over Joliet Junction Trail, I-80 EB Bridge over Midland Avenue, and the I-80 WB Bridge over Midland Avenue. Other work includes drainage system improvements, signing, lighting, temporary traffic signals, ITS improvements, and noise abatement walls. The project is in the | — | Executed | Walsh Construction Company II, LLC $94,772,970 · | ||
| Jan 19, 2024 | 62V04 | WillDistrict 1 | The pickup, removal and disposal of debris/litter on a work order basis on I-80 from I-355 to the Kendall Coun The work to be completed under this contract consists of the pickup, removal and disposal of debris/litter on a work order basis on I-80 from I-355 to the Kendall County Line. | — | Executed | Interstate Business Solutions, LLC $143,366 · | ||
| Jan 19, 2024 | 62V10 | WillDistrict 1 | Hot-Mix Asphalt Resurfacing, Class D Pavement Patching, Grading and Shaping Ditches, Curb and Gutter Removal a (1.68-Mile) Designed Overlay consist of Hot-Mix Asphalt Resurfacing, Class D Pavement Patching, Grading and Shaping Ditches, Curb and Gutter Removal and Replacement on New Avenue from IL 171 (State Street) to Long Run Creek. This project is located in the City of Lockport in Will County. | — | Executed | P. T. Ferro Construction Co. $1,559,449 · | ||
| Jan 19, 2024 | 62V27 | WillDistrict 1 | A full bridge painting of the structure (099-0139) carrying US 52 (Jefferson St This project consists of a full bridge painting of the structure (099-0139) carrying US 52 (Jefferson St.) over I-55 in the Village of Shorewood and City of Joliet in Will County and zone painting of structure (099-0274) carrying IL 7 (West 9th St.) over EJandE Railroad in the City of Lockport in Will County. | — | Executed | ERA-Valdivia Contractors, Inc. $545,765 · | ||
| Jan 19, 2024 | 62W35 | WillDistrict 1 | Arterial road sweeping in Will County This contract consists of arterial road sweeping in Will County. | — | Active | Central Sweeping of Illinois, LLC $1,326,875 · | ||
| Jan 19, 2024 | 78A18 | WilliamsonDistrict 9 | 10.2 miles of resurfacing on IL 13 westbound lanes from the Saline County line to Crab Orchard Creek in Marion. | — | Executed | Samron Midwest Contracting, Inc. $2,696,596 · | ||
| Mar 8, 2024 | 61K17 | WillDistrict 1 | Sidewalk Construction along Court Street from East of Eastgate Avenue to Will Center Road in Monee | — | Executed | Iroquois Paving Corporation $416,195 · | ||
| Mar 8, 2024 | 62R94 | WillDistrict 1 | (5,317-Ft) SMART Overlay, ADA Improvements project along IL 53/ US 6 (Washington Street) from 200-feet South of South Chicago Street to West of Chicago Street in the City of Joliet, Will County. | — | Executed | P. T. Ferro Construction Co. $1,491,866 · | ||
| Mar 8, 2024 | 62U99 | CookWillDistrict 1 | (618-Mile) Debris and litter cleaning along I-94 (Bishop Ford Expwy) from I- 90/94 (Dan Ryan Expwy) to I-80, Stony Island Ave from I-94 to US-12 (95th St) and 103rd St. from Collage Groove to Stony Island. | — | Executed | William Dunbar Construction LLC. $363,019 · | ||
| Mar 8, 2024 | 62V02 | CookWillDistrict 1 | This work is located on I-57 expressway from I-94 (Dan Ryan Expwy) to the Will/Kankakee County Line Cook and Will Couties. The project length is 375.6 miles. | — | Executed | William Dunbar Construction LLC. $220,631 · | ||
| Mar 8, 2024 | 62V03 | CookWillDistrict 1 | Debris and litter cleaning along I-80 from I-294 (Tri State Tollway) to I-355 This contract consists of debris and litter cleaning along I-80 from I-294 (Tri State Tollway) to I-355. The length of the project is 148 miles. | — | Executed | William Dunbar Construction LLC. $86,937 · | ||
| Mar 8, 2024 | 62V11 | WillDistrict 1 | Deck overlay and joint repair of structure carrying 1-55 At Des Plaines River in Channahon Township in Will Co The proposed improvement consists of deck overlay and joint repair of structure carrying 1-55 At Des Plaines River in Channahon Township in Will County. Total gross length and net length= 2810 Feet (0.532 Mile). , The proposed improvement consists of deck overlay and joint repair of structures carrying I-55 At Des Plaines River in Channahon Township in Will County. Total gross length and net length= 2810 Feet (0.532 Mile). | — | Executed | ICC Group Inc. $4,043,500 · | ||
| Mar 8, 2024 | 99726 | WilliamsonDistrict 9 | Construct a Bi-Directional Left Turn lane to include base course widening, resurfacing, and extension of a box culvert on IL 166, 4 miles south of IL 13. | — | Active | |||
| Apr 26, 2024 | 61D34 | WillDistrict 1 | Pavement widening and reconstrtution;includes resurfacing, traffic signals and lightings at the intersection of Bell Road and 143rd Street in Homer Glen. | — | Executed | D. Construction, Inc. $24,310,460 · | ||
| Apr 26, 2024 | 61H34 | WillDistrict 1 | New roadway construction to extend 143rd Street from IL 59 to IL 126. Includes; construction of a new bridge over the DuPage River, culvert exetensions, retaining walls, traffic signals and lighting in Plainfield. | — | Executed | D. Construction, Inc. $53,042,202 · | ||
| Apr 26, 2024 | 61J08 | WillDistrict 1 | Construct a single-lane eliptical roundabout at the intersection of Cedar Road and Haven Avenue in New Lenox. Includes full-depth HMA Pavement, curb and gutter, sidewalk, lighting, and landscaping. | — | Executed | Austin Tyler Construction, Inc. $2,355,249 · | ||
| Apr 26, 2024 | 62380 | WillDistrict 1 | Location 1: FAU 354 (Richards Street) at Hickory Creek North of I-80 (SN 099- 0123) 1,835 Feet (0.35 Mile) project which includes reconstruction and widening of the bridge bridge superstructure, pavement reconstruction, noise barriers, drainage, signing, lighting, and traffic signals in the City of Joliet and Joliet Township in Will County. Location feet 2: FAI 80 (I-80) over Des Plaine River (099-0056 EB and 099-0057 WB) 782 feet (0.15 Mile) project which includes structural steel repairs in th | — | Executed | D. Construction, Inc. $19,992,722 · | ||
| Apr 26, 2024 | 62T33 | WillDistrict 1 | This is a bridge preservation project of SN 099-0282; US 6 (Maple Road) over CN Railroad. Scope of work includes bridge deck scarification and overlay, joint repair, approach slab repair and sidewalk and guardrail replacement. The project is located within the City of Joliet in Will County. | — | Executed | D. Construction, Inc. $1,303,768 · | ||
| Apr 26, 2024 | 62W10 | WillDistrict 1 | Debris cleaning and litter picking This work is located on I-55 expressway from I-355 to Reed Rd in Will County. It consists of debris cleaning and litter picking. | — | Executed | The Final Connection, Inc. $168,480 · | ||
| Apr 26, 2024 | 62W42 | WillDistrict 1 | (231.5-Ft) This project includes overlay of Gougar Road Bridge over I-80 (SN 099-0 203) and replacement of permanent protective shield, in the Village of New Lenox within Will County. | — | Executed | D. Construction, Inc. $128,211 · | ||
| Apr 26, 2024 | 78A06 | WilliamsonDistrict 9 | Microsilica deck overlay, joint replacement and bridge deck patching on SN 100-0037 carrying IL 148 over Middle Wolf Creek, 1 mile north of I-57. | — | Executed | Samron Midwest Contracting, Inc. $376,698 · | ||
| Apr 26, 2024 | 78A19 | WilliamsonDistrict 9 | 2.2 miles of resurfacing on IL 13 from Sinclair Street to IL 37. | — | Executed | Samron Midwest Contracting, Inc. $2,745,072 · | ||
| Jun 14, 2024 | 46648 | LakeWillDistrict 1 | Applying water borne, lead free, white and yellow paint pavement marking lines of 4,6, and 8 inches in width This work shall consist of applying water borne, lead free, white and yellow paint pavement marking lines of 4,6, and 8 inches in width. The location of of the work is on various State-maintained highways in Lake and Will Counties. | — | Executed | STF, LLC d/b/a Traffic Control Company $1,812,600 · | ||
| Jun 14, 2024 | 62M79 | WillDistrict 1 | Rehabilitate bascule spans of US 30 (Cass St) bridge over Des Plaines River (SN 099-0101) including structural, mechanical, and electrical improvements for total length of 552 ft (0.1 mile). The project is located within the City of Joliet in Will County, Illinois. | — | Executed | D. Construction, Inc. $22,831,654 · | ||
| Jun 14, 2024 | 62T19 | WillDistrict 1 | (304-Ft) Bridge deck overlay and bridge joint repairs improvement of the structure that carries IL 126 / Lockport Street over the DuPage River. The improvement is located in the Village of Plainfield in Will County. | — | Executed | D. Construction, Inc. $784,236 · | ||
| Jun 14, 2024 | 62T28 | WillDistrict 1 | (1.14-Mile) SMART Overlay and curb ramps (ADA) improvements on US 30 (Center St/ Western Ave/ Cass St) from US 30 (Jefferson St/ Center St) to US 6 (Collins St). Located in the City of Joliet in Will County. | — | Executed | D. Construction, Inc. $1,201,456 · | ||
| Jun 14, 2024 | 62T55 | WillDistrict 1 | (2,710-Ft) Smart overlay and ADA project, located on FAP 607: US 6, US 30 (Collins Street) within the City of Joliet in Will County. | — | Executed | Gallagher Asphalt Corporation $734,798 · | ||
| Jun 14, 2024 | 62T56 | WillDistrict 1 | (4,758-Ft) SMART Overlay: hot-mix asphalt surface removal, earth excavation, new shoulders, pavement patching, hot-mix asphalt surface, curb and gutter removal and replacement, longitudinal joint sealing, pavement markings, and detector loops replacement. Located on US 6 (Channahon Road) from Southwest of Terry Drive to Northeast of Hollywood Road, in the City of Joliet in Will Co. | — | Executed | P. T. Ferro Construction Co. $1,020,995 · | ||
| Jun 14, 2024 | 62U76 | WillDistrict 1 | (3,093-Ft) Traffic Signal Modernization, Left Turn Lanes includes resurfacing, traffic signals, drainage improvements, and pavement markings. Located on IL 7 (Renwick Road) at the intersection with IL 53 (Independence Blvd) in the Cities of Lockport and Crest Hill in Will County. | — | Executed | Alliance Contractors, Inc. & Home Towne Electric, Inc. $2,728,452 · | ||
| Jun 14, 2024 | 62U79 | WillDistrict 1 | (0.71-Mile) Designed Overlay, ADA Improvements Located along IL 53 (Baltimore Street) from IL 102 (Water Street) to Kankakee Street and from Forked Creek to to just South of Wilmington/ Peotone Road within the City of Wilmington in Will County. | — | Executed | Iroquois Paving Corporation $856,805 · | ||
| Aug 2, 2024 | 62R85 | WillDistrict 1 | Installation of new fiber optic cable, conduit, PTZ cameras, network switches along IL Route 7 from 7th Street to Gougar Rd. just east of the City of Lockport Downtown area. | — | Executed | H & H Electric Co. $589,015 · | ||
| Aug 2, 2024 | 62T29 | WillDistrict 1 | (1.13-Mile) SMART Overlay improvements. It begins 0.2 miles south of McClintock Rd. and proceeds southeasterly to a point 0.5 miles northeast of I-55, through the Village of Channahon and City of Joliet in Will County. | — | Executed | D. Construction, Inc. $1,009,101 · | ||
| Aug 2, 2024 | 62W96 | WillDistrict 1 | (2,365-Ft) Patching project includes full depth patches and HMA/ PCC surface removal and replacement with HMA surface course. Location: US 52 / IL 53 (Chicago Street) from North of Doris Avenue to I-80 interchange, within the City of Joliet in Will County. | — | Executed | Gallagher Asphalt Corporation $697,638 · | ||
| Aug 2, 2024 | 78978 | WilliamsonDistrict 9 | 1.4 miles of HMA resurfacing, ADA improvements and traffic signal upgrades on IL 148 from Hemlock Street to Herrin Street in Herrin. | — | Executed | Samron Midwest Contracting, Inc. $1,968,583 · | ||
| Sep 20, 2024 | 62R25 | WillDistrict 1 | The reconstruction of the following Larkin Avenue ramps to and from I-80: EB I-80 exit ramp to Larkin Avenue, The proposed project scope of work consists of the reconstruction of the following Larkin Avenue ramps to and from I-80: EB I-80 exit ramp to Larkin Avenue, NB Larkin Avenue entrance ramp to EB I-80, WB I-80 exit ramp to Larkin Avenue and SB Larkin entrance ramp to WB I-80. The work also includes reconstruction of the northwest and southeast shoulder approaches to the Larkin Avenue Bridge over I-80 as well as construction of a proposed retaining wall along the EB exit ramp and noise walls. Relat | — | Executed | Walsh Construction Company II, LLC $22,132,931 · | ||
| Sep 20, 2024 | 62R26 | WillDistrict 1 | The partial reconstruction of entrance and exit ramps proposed at the I-80 and I-55 interchange The proposed project scope of work consists of the partial reconstruction of entrance and exit ramps proposed at the I-80 and I-55 interchange. The work also includes the construction of a new directional ramp for SB I-55 to EB I-80 with flyover bridge crossing over I-55, along with reconstruction of Mound Road Frontage Road, construction of new retaining walls and drainage improvements within the reconstruction limits. Related work proposed in this contract includes grading, pavement markings, | — | Executed | D. Construction, Inc. $27,356,588 · | ||
| Sep 20, 2024 | 78942 | WilliamsonDistrict 9 | 5 miles of resurfacing, patching and shoulder work on IL 37 from 4th Street in Johnson City to IL 13 in Marion. | — | Executed | E. T. Simonds Construction Company $2,232,933 · | ||
| Sep 20, 2024 | 99735 | WilliamsonDistrict 9 | Resurface TR 298 from Stotar Road to Crenshaw Road. | — | Executed | E. T. Simonds Construction Company $496,850 · | ||
| Sep 20, 2024 | 99737 | WilliamsonDistrict 9 | Resurface Rocky Comfort Road from Grassy Road to West Devils Kitchen Road. | — | Executed | E. T. Simonds Construction Company $567,540 · | ||
| Nov 8, 2024 | 61H32 | WillDistrict 1 | Replace the bridge carrying TR 181 over Jackson Creek, 0.4 mile east of US 52. | — | Executed | D. Construction, Inc. $2,994,900 · | ||
| Nov 8, 2024 | 62R21 | WillDistrict 1 | The building demolition at various locations The proposed scope of work consists of the building demolition at various locations. Each building removal will include removing any structure above and below the ground, including the main building frames, attached and detached buildings, and facilities. It will also include the removal of fences, sidewalks and driveways, utilities, and trees within the parcels- limits. The project is in the City of Joliet in Will County. | — | Executed | P. T. Ferro Construction Co. $597,064 · | ||
| Nov 8, 2024 | 78906 | WilliamsonDistrict 9 | Modification of a signalized intersection to a roundabout at IL 148 and Old IL 13 in the City of Marion. | — | Executed | Samron Midwest Contracting, Inc. $3,758,898 · | ||
| Nov 8, 2024 | 99736 | WilliamsonDistrict 9 | Guardrail replacement, pavement markings and signage, and LED Stop Signs at the intersection of Creal Springs Road and Borton Street in Creal Springs. | — | Rejected | Midwest Fence Corporation $92,499 · | ||
| Dec 13, 2024 | 62T04 | WillDistrict 1 | Bridge deck overlay, reconstruction of abutment deck joint, approach slab repairs and substructure repairs of The proposed improvement consists of bridge deck overlay, reconstruction of abutment deck joint, approach slab repairs and substructure repairs of the bridge located on La Grange Road/US 45 at Hickory Creek in Will County. Gross length: 4854 Ft (0.919 Mi), Net length: 1327 Ft (0.252 Mi). | — | Executed | D. Construction, Inc. $1,407,207 · | ||
| Dec 13, 2024 | 78633 | WilliamsonDistrict 9 | 7.8 miles of resurfacing, HMA shoulders, aggregate shoulders, earthwork, culvert replacement, tree removal, guardrail updates, addition of a right turn lane, and construction of a roundabout on IL 37, south of Marion, from Wildcat Road to IL 148. | — | Executed | E. T. Simonds Construction Company $16,365,141 · | ||
| Dec 13, 2024 | 78798 | WilliamsonDistrict 9 | 8 miles of earthwork, HMA pavement, HMA resurfacing, drainage and guardrail in order to add a lane in each direction of I-57 from Westminster Drive in Marion to just south of the I-24 interchange. | — | Executed | Samron Midwest Contracting, Inc. $41,665,230 · | ||
| Dec 13, 2024 | 78A65 | WilliamsonDistrict 9 | 7.8 miles of standard overlay on Crab Orchard Road from the IL 13 West Connector to the IL 13 East Connector. | — | Executed | Samron Midwest Contracting, Inc. $643,012 · |
1–50 of 50
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.