Filtered by: County: Tazewell Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Mar 8, 2024 | 68H88 | TazewellDistrict 4 | 0.3 miles HMA partial depth patching and longitudinal joint repair. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $546,748 · | ||
| Mar 8, 2024 | 89850 | TazewellDistrict 4 | Construction of PCC Sidewalk, combination curb and gutter, pavement markings, signing and fencing along Stadiam Drive from Court Street North to the existing Pekin park District Trail in Pekin. | — | Executed | Illinois Civil Contractors, Inc. $573,961 · | ||
| Apr 26, 2024 | 68H71 | TazewellDistrict 4 | D4 Bridge Joint Repair 2024 at SN's 090-0130, 090-0132, 090-0133, 090-0137, 090-0138 and 090-0139 in Tazewell County. | — | Active | Otto Baum Company, Inc. $5,662,800 · | ||
| Apr 26, 2024 | 68H81 | TazewellDistrict 4 | Bridge deck patching on SN 090-0141 on Morton Ave (FAU 6729) over I-74 in Morton in Tazewell County. | — | Executed | Path Construction Company, Inc. $211,896 · | ||
| Apr 26, 2024 | 68I05 | TazewellDistrict 4 | Traffic signal mast arm replacement at IL 98 (Birchwood St.) and I-155 NB ramps in Morton. | — | Executed | Laser Electric, Inc. $243,063 · | ||
| Jun 14, 2024 | 68H95 | TazewellDistrict 4 | 4.2 miles of construction of HMA shoulders with an aggregate shoulder wedge, between Pekin and Tremont. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $1,978,846 · | ||
| Jun 14, 2024 | 68J08 | TazewellDistrict 4 | 4.61 miles of CIR and Mill and Overlay on IL 122 in Tazewell County. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $5,783,311 · | ||
| Jun 14, 2024 | 68J24 | PeoriaTazewellDistrict 4 | D4 highway lighting 2025: Inspection of existing high mast towers, luminaire repair and re-lamping, maintenance of existing lighting controllers in Peoria and Tazewell Counties. | — | Executed | Laser Electric, Inc. $516,745 · | ||
| Jun 14, 2024 | 68J25 | TazewellDistrict 4 | Lighting upgrades at I-74 and I-155 interchange in Morton in Tazewell County. | — | Executed | Laser Electric, Inc. $455,220 · | ||
| Aug 2, 2024 | 68J29 | TazewellDistrict 4 | Remove and replace chain link fence around the D4 Operations Bridge Yard in East Peoria. | — | Executed | COLLINS & HERMANN, INC. $143,158 · | ||
| Aug 2, 2024 | 89861 | TazewellDistrict 4 | Sidewalk construction on Eleanor Court from Briarwood Ct. to Groveland St. Sidewalk replacement on Groveland Street from Allyn St. to Eller Ave. in Creve Coeur. | — | Executed | Otto Baum Company, Inc. $138,200 · | ||
| Sep 20, 2024 | 68C94 | TazewellDistrict 4 | 5.42 miles of resurfacing on IL 122 from IL 29 to just east of Oak St in Delavan in Tazewell County. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $7,973,993 · | ||
| Sep 20, 2024 | 68J30 | TazewellDistrict 4 | Building demolition at four locations along Main Street between Cedar and Ravine Streets in East Peoria. | — | Executed | Phoenix Corporation of the Quad Cities $169,021 · | ||
| Sep 20, 2024 | 68J41 | TazewellDistrict 4 | 2.746 miles of resurfacing, patching, and ADA improvements on Illinois Route 8 and Business US Route 24 (Washington Rd) in Tazewell County. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $4,448,444 · | ||
| Sep 20, 2024 | 89803 | TazewellDistrict 4 | Resurface Washington Street from Main Street to the I-74 Interchange in the City of East Peoria. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $940,411 · |
1–15 of 15
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.