IDOT Jobs

2022 · 15 jobs · — Sign up free
★ My Jobs

Filtered by: County: Tazewell Clear all

15 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 21, 2022 68D73 TazewellDistrict 4 Resurfacing on IL-9 from East Chestnut St. in Tremont to just West of the Prairie Creek Bridge (S.N. 090-0061). — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $1,282,674 ·
Jan 21, 2022 68F11 TazewellDistrict 4 This pavement patching and HMA overlay project is located on Interstate 74 from 0.8 miles East of Morton to the Woodford Co. line. Project length is 6.42 miles. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $11,367,686 ·
Jan 21, 2022 68G75 PeoriaTazewellDistrict 4 Repair and replace traffic signals, overhead lighting, and ITS facilities at various locations in East Peoria, Peoria, Pekin and Peoria County. — Executed Nov 26 New Oberlander Electric Co. $301,890 ·
Jan 21, 2022 89787 TazewellDistrict 4 Reconstruction and widening of Courtland Street to a 5-lane section from Walton Avenue to Main Street in Morton. — Executed Nov 26 New Gensini Excavating, Inc. $2,572,414 ·
Mar 11, 2022 68F32 TazewellDistrict 4 Drainage improvenments along the East fore slope of US 24/IL 29 South of Ravine St This project will be .10 miles long and will consist of drainage improvenments along the East fore slope of US 24/IL 29 South of Ravine St. in the city of East Peoria. — Executed Nov 26 New Stark Excavating, Inc. $79,890 ·
Mar 11, 2022 68F75 TazewellDistrict 4 Bridge joint replace/repair, bridge deck repairs, bridge repair on S.N. 090-0136 on Townline Road over 1-155, 3 miles South of IL Route 9. — Executed Nov 26 New Stark Excavating, Inc. $357,062 ·
Mar 11, 2022 68G28 PeoriaTazewellDistrict 4 Crack and Joint Sealing on US 24/IL 9 from N of Pfeiffer Rd in Bartonville to 0.16 mi SW of IL 9 (E.) and on IL 29 from Margaret Drive in Creve Coeur to N of LaSalle BLVD in Marquette Heights. — Executed Nov 26 New Denler, Inc. $214,975 ·
Mar 11, 2022 68G58 MarshallMasonTazewellDistrict 4 Bridge washing of nine (9) bridges over the Illinois River in Tazewell, Mason, and Marshall Counties. — Executed Nov 26 New Interstate Maintenance, Incorporated $219,300 ·
Mar 11, 2022 68G68 TazewellDistrict 4 Bridge repairs to SN 090-0104 Springfield Rd; 090-0105 Cole St; 090-0119 EB Ramp to WB I-74 (replace rocker bearings, misc. structural steel and substructure repairs). — Executed Nov 26 New Stark Excavating, Inc. $294,240 ·
Apr 29, 2022 68G50 TazewellDistrict 4 Bridge deck sealing at various locations in Tazewell County. — Executed Nov 26 New All States Painting, Inc. $293,000 ·
Apr 29, 2022 68G73 TazewellDistrict 4 Lighting upgrades at IL 29/1-474 interchange in Creve Coeur, I-155/IL 98 and I-155/Queenwood Rd. interchanges in Morton. — Executed Nov 26 New Bodine Electric of Decatur $248,640 ·
Jun 17, 2022 68H04 TazewellWoodfordDistrict 4 2.9 miles of median removal and manhole/inlet repairs. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $155,327 ·
Jun 17, 2022 68H05 TazewellDistrict 4 HMA Patching on Business US 24 in Washington (2.65 miles); HMA Patching on IL 122 West of Minier (2.00 miles). — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $579,057 ·
Aug 5, 2022 68H12 TazewellDistrict 4 The installation of new traffic signals, pavement markings, ADA ramp, curb and gutter, riprap, median reconstr This profect consists of the installation of new traffic signals, pavement markings, ADA ramp, curb and gutter, riprap, median reconstruction, and all related collateral work necessary to complete the improvements on this project. Located at the intersection of VFW Rd. and 14th St. in Pekin, Tazewell Co. — Executed Nov 26 New Otto Baum Company, Inc. $649,720 ·
Nov 18, 2022 68F38 PeoriaTazewellDistrict 4 Bridge Rehabilitation with bridge deck overlay, beam repairs, beam additions, navigation and roadway lighting, traffic signal improvements, drainage improvements, full depth pavement removal and replacement, sidewalk removals, multi-use path construction and related collateral work. Bob Michel Bridge (SN 090-0122) in Peoria and Tazewell Counties on IL 40 (William Kumpf Blvd.) over the Illinois River and Washington Street. — Executed Nov 26 New ICC Group Inc. $24,657,000 ·
1–15 of 15

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.