Filtered by: County: Tazewell Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 21, 2022 | 68D73 | TazewellDistrict 4 | Resurfacing on IL-9 from East Chestnut St. in Tremont to just West of the Prairie Creek Bridge (S.N. 090-0061). | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $1,282,674 · | ||
| Jan 21, 2022 | 68F11 | TazewellDistrict 4 | This pavement patching and HMA overlay project is located on Interstate 74 from 0.8 miles East of Morton to the Woodford Co. line. Project length is 6.42 miles. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $11,367,686 · | ||
| Jan 21, 2022 | 68G75 | PeoriaTazewellDistrict 4 | Repair and replace traffic signals, overhead lighting, and ITS facilities at various locations in East Peoria, Peoria, Pekin and Peoria County. | — | Executed | Oberlander Electric Co. $301,890 · | ||
| Jan 21, 2022 | 89787 | TazewellDistrict 4 | Reconstruction and widening of Courtland Street to a 5-lane section from Walton Avenue to Main Street in Morton. | — | Executed | Gensini Excavating, Inc. $2,572,414 · | ||
| Mar 11, 2022 | 68F32 | TazewellDistrict 4 | Drainage improvenments along the East fore slope of US 24/IL 29 South of Ravine St This project will be .10 miles long and will consist of drainage improvenments along the East fore slope of US 24/IL 29 South of Ravine St. in the city of East Peoria. | — | Executed | Stark Excavating, Inc. $79,890 · | ||
| Mar 11, 2022 | 68F75 | TazewellDistrict 4 | Bridge joint replace/repair, bridge deck repairs, bridge repair on S.N. 090-0136 on Townline Road over 1-155, 3 miles South of IL Route 9. | — | Executed | Stark Excavating, Inc. $357,062 · | ||
| Mar 11, 2022 | 68G28 | PeoriaTazewellDistrict 4 | Crack and Joint Sealing on US 24/IL 9 from N of Pfeiffer Rd in Bartonville to 0.16 mi SW of IL 9 (E.) and on IL 29 from Margaret Drive in Creve Coeur to N of LaSalle BLVD in Marquette Heights. | — | Executed | Denler, Inc. $214,975 · | ||
| Mar 11, 2022 | 68G58 | MarshallMasonTazewellDistrict 4 | Bridge washing of nine (9) bridges over the Illinois River in Tazewell, Mason, and Marshall Counties. | — | Executed | Interstate Maintenance, Incorporated $219,300 · | ||
| Mar 11, 2022 | 68G68 | TazewellDistrict 4 | Bridge repairs to SN 090-0104 Springfield Rd; 090-0105 Cole St; 090-0119 EB Ramp to WB I-74 (replace rocker bearings, misc. structural steel and substructure repairs). | — | Executed | Stark Excavating, Inc. $294,240 · | ||
| Apr 29, 2022 | 68G50 | TazewellDistrict 4 | Bridge deck sealing at various locations in Tazewell County. | — | Executed | All States Painting, Inc. $293,000 · | ||
| Apr 29, 2022 | 68G73 | TazewellDistrict 4 | Lighting upgrades at IL 29/1-474 interchange in Creve Coeur, I-155/IL 98 and I-155/Queenwood Rd. interchanges in Morton. | — | Executed | Bodine Electric of Decatur $248,640 · | ||
| Jun 17, 2022 | 68H04 | TazewellWoodfordDistrict 4 | 2.9 miles of median removal and manhole/inlet repairs. | — | Executed | Phoenix Corporation of the Quad Cities $155,327 · | ||
| Jun 17, 2022 | 68H05 | TazewellDistrict 4 | HMA Patching on Business US 24 in Washington (2.65 miles); HMA Patching on IL 122 West of Minier (2.00 miles). | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $579,057 · | ||
| Aug 5, 2022 | 68H12 | TazewellDistrict 4 | The installation of new traffic signals, pavement markings, ADA ramp, curb and gutter, riprap, median reconstr This profect consists of the installation of new traffic signals, pavement markings, ADA ramp, curb and gutter, riprap, median reconstruction, and all related collateral work necessary to complete the improvements on this project. Located at the intersection of VFW Rd. and 14th St. in Pekin, Tazewell Co. | — | Executed | Otto Baum Company, Inc. $649,720 · | ||
| Nov 18, 2022 | 68F38 | PeoriaTazewellDistrict 4 | Bridge Rehabilitation with bridge deck overlay, beam repairs, beam additions, navigation and roadway lighting, traffic signal improvements, drainage improvements, full depth pavement removal and replacement, sidewalk removals, multi-use path construction and related collateral work. Bob Michel Bridge (SN 090-0122) in Peoria and Tazewell Counties on IL 40 (William Kumpf Blvd.) over the Illinois River and Washington Street. | — | Executed | ICC Group Inc. $24,657,000 · |
1–15 of 15
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.