Filtered by: County: Tazewell Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 18, 2019 | 68D59 | TazewellDistrict 4 | Bridge repair on Washington Street (IL 40) and the Industrial Spur (IL 40). | — | Executed | Halverson Construction Co., Inc. $3,848,556 · | ||
| Jan 18, 2019 | 68E76 | TazewellDistrict 4 | Installation and removal of guardrail, inlet adjustments and miscellaneous concrete work to separate US 150 (West Jackson Street) from the adjacent multi-use trial from Beverly Avenue to Cedar Avenue, on the northwest side of Morton | — | Executed | Illinois Civil Contractors, Inc. $149,100 · | ||
| Jan 18, 2019 | 68E78 | TazewellDistrict 4 | Install communications duct, communications vaults, fiber optic cable, CCTV cameras along US 24 and Business Route 24 in and around Washington. | — | Executed | Bodine Electric of Decatur $427,439 · | ||
| Mar 8, 2019 | 68C63 | TazewellDistrict 4 | Culvert replacement on IL 98, 0.1 mile east of Cole Hollow Rd (SN 090-1002) | — | Executed | Kinney Contractors, Inc. $734,500 · | ||
| Mar 8, 2019 | 68E14 | TazewellDistrict 4 | Substructure repairs to SN 090-0037 carrying US RTE 150 over Farm Creek, TWP Railroad, and Norfolk Southern Railroad. | — | Executed | Otto Baum Company, Inc. $138,518 · | ||
| Mar 8, 2019 | 68E68 | MarshallMasonTazewellDistrict 4 | Bridge washing of eleven bridges over the Illinois River | — | Executed | All States Painting, Inc. $881,690 · | ||
| Mar 8, 2019 | 68E75 | TazewellDistrict 4 | Crack and joint sealing on I-155 from I-74 to the Tazewell/Logan county line. | — | Executed | Complete Asphalt Service Co. $197,480 · | ||
| Mar 8, 2019 | 68E81 | TazewellDistrict 4 | Longitudinal joint repair, raised pavement markers, pavement striping on US 24 from east of College Drive to east of Cummings Lane. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $431,734 · | ||
| Mar 8, 2019 | 89713 | TazewellDistrict 4 | Resurfacing, sidewalks, street and pedestrian lighting, storm sewer, curb and g gutter, and pavement markings on IL 29 (Main Street) from Poplar Street to Margaret Drive in Creve Coeur. | — | Executed | Illinois Civil Contractors, Inc. $3,914,270 · | ||
| Apr 26, 2019 | 68D77 | TazewellDistrict 4 | Rehabilitation of SN 090-0047 carrying IL 29/IL 116/IL 8/US 24 over Farm Creek west of Camp Street in East Peoria. | — | Executed | Phoenix Corporation of the Quad Cities $571,771 · | ||
| Apr 26, 2019 | 68E37 | TazewellDistrict 4 | Bridge painting at various locations in Taxewell County. (SN 090-0117, 0116, 0102, 0118, and 090-0119). | — | Executed | Civil Coatings and Construction Inc. $2,237,590 · | ||
| Jun 14, 2019 | 68D99 | PeoriaTazewellDistrict 4 | TEMPORARY SIGNUNG FOR I-74 CLOSURE AND DETOUR ROUTES FOR THE MURRAY BAKER BRIDGE REHABILITATION PROJECT. | — | Executed | T.M.F. Construction Company $824,481 · | ||
| Jun 14, 2019 | 68E71 | PeoriaTazewellDistrict 4 | DETOUR ROUTE PREPARATION, INCLUDING TEMPORARY PAVEMENT AND MISCELLANEOUS ELECTRICAL WORK, ALONG IL RTE 40 IN PEORIA AND EAST PEORIA FOR MURRAY BAKER REHABILITATION PROJECT. | — | Executed | Otto Baum Company, Inc. $1,476,305 · | ||
| Jun 14, 2019 | 68E73 | TazewellDistrict 4 | Resurfacing ramp from Washington St to IL Rte 40 in East Peoria. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $140,362 · | ||
| Jun 14, 2019 | 68E89 | TazewellDistrict 4 | PARTIAL DEPTH PATCHING ON IL 8/BUS 24 FROM LEGION RD. TO EAST CITY LIMITS IN WASHINGTON. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $359,429 · | ||
| Jul 12, 2019 | 68C97 | TazewellWoodfordDistrict 4 | Resurfacing on BUS 24 from E of Lynn St. in Washington to US 24, W of Eureka. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $3,974,381 · | ||
| Aug 2, 2019 | 68E92 | TazewellDistrict 4 | Patching on IL 29/IL IL/8 116/US 24 from Wesley Rd. in Creve Coeur to camp street in East Peoria. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $316,579 · | ||
| Sep 20, 2019 | 68E16 | PeoriaTazewellDistrict 4 | CULVERT LINING ON VARIOUS ROUTES WITHIN PEORIA AND TAZEWELL COUNTIES. | — | Executed | Hoerr Construction, Inc. $769,350 · | ||
| Sep 20, 2019 | 68E27 | TazewellDistrict 4 | BRIDGE JOINT REPAIR, BRIDGE REPAIR TO SN 090-0127 CARRYING I-155 RAMP (NB) OVER BNSF AT IL 98 AND SN 090-0131 CARRYING MAIN ST (SB) OVER I-155 1.6 MI W OF IL 98 NEAR MORTON. | — | Executed | Halverson Construction Co., Inc. $853,648 · | ||
| Sep 20, 2019 | 68E53 | PeoriaTazewellDistrict 4 | CONSTRUCTION, REPLACEMENT OR CROSSWALKS ALONG IL 29 (ADAMS and JEFFERSON ST) FROM HANCOCK ST TO WAYNE STREET IN PEORIA, IL 8 FROM CHERRY LANE TO MEADOWVIEW LN IN SUNNYLAND, IL 8 AT LEGION RD AND BUS 24 AT BONDURANT ST IN WASHINGTON. | — | Executed | Otto Baum Company, Inc. $537,618 · | ||
| Sep 20, 2019 | 89749 | TazewellDistrict 4 | Roadway reconstruction on Distillery Road from Front Street to IL 29, on Front Street from Distillery Road to Fayette Street and on Fayette Street from Front Street to IL 29 in the city of Pekin. | — | Executed | Otto Baum Company, Inc. $6,378,025 · | ||
| Nov 8, 2019 | 68C89 | TazewellDistrict 4 | Deck replacement, structural steel repairs, roadway lighting, navigation lightning, decorative lighting, and scour countermeasures to SN 090-0001 (Murray Baker Bridge), carrying I-74 over the Illinois River. | — | Executed | ICC Group Inc. $42,221,000 · |
1–22 of 22
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.