Filtered by: County: Tazewell Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 19, 2018 | 72K18 | LoganTazewellDistrict 4 | Bituminous surface treatment A-2 and leveling binder on Armington Road from Monroe Street in Armington to US 136 and on Old IL 121 (CR 2500 E) from US 136 to the Tazewell County line. | — | Executed | Beniach Construction Co., Inc. $353,547 · | ||
| Mar 9, 2018 | 68D16 | PeoriaTazewellDistrict 4 | Resurfacing on I-74 from Washington St. to Muller Road, from Morton Ave. to Mainstreet, from Sterling Ave. to the Union Pacific Railroad structure. Also, resurfacing on I-474 Roadway A and B in Peoria. | — | Executed | Advanced Asphalt Company $6,988,434 · | ||
| Mar 9, 2018 | 68E04 | PeoriaPutnamTazewellDistrict 4 | 31 miles of crack and joint sealing on US 150, IL 26 and I-155. | — | Executed | Complete Asphalt Service Co. $164,160 · | ||
| Apr 27, 2018 | 68A79 | McLeanTazewellWoodfordDistrict 4 | 10.97 miles of pavement rubblization, overlay and new pavement construction with drainage and bridge work from west of the Tazell county line near Deer Creek to east of the Carlock interchange. | — | Executed | Rowe Construction, a Division of UCM, Inc. and Advanced Asphalt Company Joint Venture $57,888,042 · | ||
| Apr 27, 2018 | 68D69 | TazewellDistrict 4 | 0.97 mile of patching, milling and resurfacing on US 24/IL 29 from Margaret Drive to north of Lasalle Boulevard in Creve Coeur. | — | Rejected | Advanced Asphalt Company $1,885,690 · | ||
| Apr 27, 2018 | 68E01 | MarshallMasonTazewellDistrict 4 | Wash 9 bridges over the Illinois River. | — | Executed | All States Painting, Inc. $833,300 · | ||
| Apr 27, 2018 | 68E05 | StarkTazewellDistrict 4 | Pollinator habitat restoration and preservation in Stark and Tazewell Counties. | — | Executed | CSD Environmental Services, Inc. $41,978 · | ||
| Jun 15, 2018 | 68088 | TazewellDistrict 4 | Scour mitigation to SN 090-0112 carrying Illinois Route 29 over Lost Creek, 1.5 miles south of Pekin. | — | Rejected | Lee Hood d/b/a Hood Demolition & Excavation $262,717 · | ||
| Jun 15, 2018 | 68D09 | TazewellDistrict 4 | Intersection reconstruction at US 24 and Spring Creek Road. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $1,212,722 · | ||
| Jun 15, 2018 | 68D61 | TazewellDistrict 4 | 550 feet of riprap slope repair and culvert lining along IL 116 from Mariner's Way to 0.5 mile south, in East Peoria. | — | Executed | Illinois Civil Contractors, Inc. $246,702 · | ||
| Jun 15, 2018 | 68E00 | TazewellDistrict 4 | Building demolition at 500 West Pearl Street in Tremont. | — | Executed | Stark Excavating, Inc. $37,009 · | ||
| Jun 15, 2018 | 68E02 | TazewellDistrict 4 | Paint 5 bridges in Tazewell County; SN 090-0104, 0105, 0106, 0107 and 090-0141. | — | Executed | Three Star Painting, Inc. $871,891 · | ||
| Jun 15, 2018 | 68E10 | TazewellWoodfordDistrict 4 | Patching on US 24 from the McClugage Bridge to Cummings Lane, and on IL 116 from the Upper Spring Bay to Lourdes (CH 19). | — | Rejected | |||
| Jun 15, 2018 | 68E39 | PeoriaTazewellDistrict 4 | Installation of turn signals, luminaires, light poles, lighting controller and relocation of existing railroad interconnected traffic signal controller cabinet at various locations. | — | Executed | Laser Electric, Inc. $183,757 · | ||
| Aug 3, 2018 | 89746 | TazewellDistrict 4 | Construction of a shared-use path along West Cruger Road from Nofsinger Road to Main Street in the City of Washington. | — | Executed | Stark Excavating, Inc. $359,285 · | ||
| Sep 21, 2018 | 68E65 | TazewellDistrict 4 | Patching and joint repair on the on-ramps and off-ramps at the westbound I-74 Morton interchange. | — | Executed | G. M. Sipes Construction, Inc. $261,656 · | ||
| Nov 9, 2018 | 68D85 | TazewellDistrict 4 | Bridge repair project, approximately 500' in length, located in the US 24/IL 116 Interchange just east of the McClugage Bridge. | — | Executed | Halverson Construction Co., Inc. $1,885,363 · |
1–17 of 17
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.