Filtered by: County: St. Clair Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jun 11, 2021 | 76P47 | MadisonSt. ClairDistrict 8 | Railroad interconnect at 4 locations: 1) US 67 at Ridge, 2) US 67 at Henry, 3) US 40 at Douglas, 4) Lebanon Avenue at West Boulevard. | — | Executed | Wissehr Electric, Inc. $197,580 · | ||
| Jun 11, 2021 | 76P48 | St. ClairDistrict 8 | Bridge painting at the Poplar Street Complex on I-55/64 westbound CD over Trendly Avenue. (SN 082-0254) | — | Executed | Capital Industrial Services $1,293,300 · | ||
| Jun 11, 2021 | 76P49 | St. ClairDistrict 8 | 2.7 miles of patching on westbound I-55/64 from the Mississippi River to the I-64 Tri-Level. | — | Executed | Keeley & Sons, Inc. $443,202 · | ||
| Jun 11, 2021 | 97716 | St. ClairDistrict 8 | HMA pavement, sidewalk construction, curb and gutter and pavement markings along Washington Street from Monroe Street to Jefferson Street in Millstadt. | — | Executed | Hank's Excavating & Landscaping, Inc. $553,708 · | ||
| Jun 11, 2021 | 97742 | St. ClairDistrict 8 | Construction of a roundabout at the intersecton of Market Place and Commercial Lane in Fairview Heights. | — | Executed | DMS Contracting, Inc. $635,199 · | ||
| Jun 11, 2021 | 97756 | St. ClairDistrict 8 | Resurface Seibert Road from Main Street to Johnson Road in Shiloh. | — | Executed | The Kilian Corporation $466,115 · | ||
| Jun 11, 2021 | 97759 | St. ClairDistrict 8 | Resurfacing, sidewalk replacement, curb and gutter replacement and pavement markings on Collinsville Avenue from Summit Avenue to Martin Luther King Drive in East St. Louis. | — | Executed | Hank's Excavating & Landscaping, Inc. $541,732 · | ||
| Sep 17, 2021 | 76P31 | St. ClairDistrict 8 | Well treatment at various locations in East St. Louis and Venice. | — | Executed | Davinroy Mechanical Contractor, Inc. $714,100 · | ||
| Sep 17, 2021 | 76P69 | St. ClairDistrict 8 | Bridge painting on IL 13 (SN 082-0115 and 082-0116). | — | Executed | Civil Coatings and Construction Inc. $492,648 · | ||
| Sep 17, 2021 | 76P77 | RandolphSt. ClairDistrict 8 | Water blasting removal of existing pavement marking and replacement with thermoplastic or modified urethane pavement marking at various locations in St. Clair and Randolph Counties. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $1,234,568 · | ||
| Nov 5, 2021 | 76P05 | St. ClairDistrict 8 | Bridge joint repair on SN 082-0318 carrying the eastbound I-70 departure over the Mississippi River. | — | Executed | The Kilian Corporation $986,791 · | ||
| Nov 5, 2021 | 76P55 | St. ClairDistrict 8 | 2 miles of resurfacing along US 50 from Anne Avenue to IL 158. | — | Executed | Christ Bros. Asphalt, Inc. $1,682,926 · | ||
| Nov 5, 2021 | 76P64 | St. ClairDistrict 8 | Bridge painting at the Poplar Street Complex; I-55/64 Eastbound Collector - Distributor Lanes over TRRA Railroad and over and under IL 3 ramps (SN 082-0144). | — | Executed | Thomas Industrial Coatings, Inc. $1,121,957 · | ||
| Nov 5, 2021 | 76P89 | MonroeSt. ClairDistrict 8 | 9.2 miles of patching on I-255 from the Jefferson Barracks Bridge to IL 157. | — | Executed | Keeley & Sons, Inc. $444,060 · | ||
| Jan 21, 2022 | 76P34 | St. ClairDistrict 8 | Traffic signal modernization, flashing yellow arrows, on IL 161 from IL 159 to the YMCA and SWIC entrances. | — | Executed | Electrico, Inc. $589,314 · | ||
| Jan 21, 2022 | 76P37 | St. ClairDistrict 8 | 1.8 miles of resurfacing on IL 161 from St. Clair Avenue to 0.1 miles east of Dutch Hollow Road. | — | Executed | The Kilian Corporation $1,615,679 · | ||
| Jan 21, 2022 | 76P83 | St. ClairDistrict 8 | 1.4 miles of patching on Old IL 13 from New Athens / Darmstadt Road to IL 13. | — | Executed | Kinney Contractors, Inc. $92,600 · | ||
| Jan 21, 2022 | 76P88 | St. ClairDistrict 8 | 10.7 miles of patching on I-64 from IL 159 to IL 4. | — | Executed | Christ Bros. Asphalt, Inc. $647,720 · | ||
| Mar 11, 2022 | 76P90 | St. ClairDistrict 8 | Installation of security system at the Missouri Avenue Pump Station along I-55/64. | — | Executed | Electrico, Inc. $44,950 · | ||
| Mar 11, 2022 | 97752 | St. ClairDistrict 8 | Pavement widening, HMA and PCC pavement, storm sewer, curb and gutter, replace the deck on the structure over the tributary to Richland Creek, pipe culverts, guardrail, pavement markings, and traffic signal improvements on Frank Scott Parkway from west of Old Collinsville Road to west of Green Mount Road. | — | Executed | Baxmeyer Construction, Inc. $7,292,408 · | ||
| Mar 11, 2022 | 97766 | St. ClairDistrict 8 | Reconstruction of Shiloh Station Road from 0.4 mile north of Johnson Road to 0.2 mile north of Johnson Road in Shiloh. | — | Executed | Hank's Excavating & Landscaping, Inc. $413,521 · | ||
| Apr 29, 2022 | 76P22 | St. ClairDistrict 8 | 5.7 miles of milling and resurfacing on IL 13 / IL 15 from 0.4 miles east of IL 159 to Rogers Drive in Freeburg. | — | Executed | The Kilian Corporation $4,893,775 · | ||
| Apr 29, 2022 | 97779 | St. ClairDistrict 8 | Add right-turn lanes on westbound Highway 50 and on southbound Old Collinsville Road with traffic signal modifications, sidewalks, curb and gutter, and pavement markings in O'Fallon. | — | Executed | The Kilian Corporation $588,145 · | ||
| Jun 17, 2022 | 76P56 | St. ClairDistrict 8 | Electrical repairs at the Bowman Pump Station on I-55 / 70 at Exchange Avenue. | — | Executed | Electrico, Inc. $39,650 · | ||
| Jun 17, 2022 | 76P94 | MadisonSt. ClairDistrict 8 | Traffic signal modernization on IL 157 at Lazercheff Drive in Cahokia, on IL 157 at Kenneth Street / Paris Avenue in Cahokia, on IL 3 at IL 143 in Wood River, on IL 3 / IL 111 at IL 140 in Alton, and on IL 3 / IL 111 at Bloomer Drive in Alton. | — | Executed | Electrico, Inc. $697,430 · | ||
| Jun 17, 2022 | 97747 | St. ClairDistrict 8 | Intersection reconstruction to add two right turn lanes at IL 3 in Sauget. | — | Rejected | Hank's Excavating & Landscaping, Inc. $2,028,715 · | ||
| Jun 17, 2022 | 97780 | St. ClairDistrict 8 | Pavement reconstruction, guardrail installation, and the installation of conduit on Sauget Business Boulevard from Curtiss-Steinberg Road to Mousette Lane in Sauget. | — | Executed | The Kilian Corporation $717,364 · | ||
| Jun 17, 2022 | 97783 | St. ClairDistrict 8 | Resurfacing Collinsville Avenue from St. Clair Avenue to Summit Avenue in East St. Louis. | — | Executed | Hank's Excavating & Landscaping, Inc. $797,699 · | ||
| Aug 5, 2022 | 76M77 | St. ClairDistrict 8 | 4.6 miles of new shoulders on IL 163 from IL 157 to South Prairie DuPont Creek. | — | Executed | Christ Bros. Asphalt, Inc. $2,337,628 · | ||
| Jan 20, 2023 | 76P99 | MadisonSt. ClairDistrict 8 | Chemical treatment of deep wells at various locations in East St. Louis and Venice. | — | Rejected | Layne Christensen Company $792,818 · | ||
| Jan 20, 2023 | 76R66 | St. ClairDistrict 8 | Pavement patching on IL 157 at Lake Drive / Foley Drive. | — | Executed | Keeley & Sons, Inc. $592,843 · | ||
| Jan 20, 2023 | 97794 | St. ClairDistrict 8 | Resurfacing, curb and gutter replacement, sidewalks, and pavement markings on State Street/Old Vincennes Trail from Smiley Street to Scott Troy Road in O'Fallon. | — | Executed | The Kilian Corporation $987,743 · | ||
| Mar 10, 2023 | 76M53 | St. ClairDistrict 8 | 0.9 miles of resurfacing and ADA upgrades on IL 159 from Alexa Drive to 0.1 miles south of Douglas in Belleville. | — | Executed | The Kilian Corporation $2,891,486 · | ||
| Mar 10, 2023 | 76R48 | St. ClairDistrict 8 | 4.7 miles of patching along I-64 from 0.5 miles west of IL 159 in Fairview Heights to 0.5 miles east of Greenmount Road in O-Fallon. | — | Executed | Christ Bros. Asphalt, Inc. $1,321,723 · | ||
| Mar 10, 2023 | 76R51 | St. ClairDistrict 8 | Mixer replacement at the Bowman Pump Station on Exchange Avenue in East St. Louis. | — | Executed | Haier Plumbing and Heating, Inc. $180,000 · | ||
| Mar 10, 2023 | 76R87 | MadisonSt. ClairDistrict 8 | Dynamic message sign replacement at various locations in Madison and St. Clair Counties. | — | Rejected | Wissehr Electric, Inc. $587,933 · | ||
| Mar 10, 2023 | 97788 | St. ClairDistrict 8 | Reconstruction of Frank Scott Parkway West to establish left turn lanes. | — | Executed | Christ Bros. Asphalt, Inc. $299,566 · | ||
| Mar 10, 2023 | 97799 | St. ClairDistrict 8 | Replace existing structure carrying Simmons Road over Ogle Creek with a single span, PPC deck beam bridge with bituminous waterproofing system, HMA wearing surface and approach, and traffic barrier terminals in O'Fallon. | — | Executed | C-Hill Civil Contractors, Inc. and Sierra Bravo, LLC JV $1,106,940 · | ||
| Apr 28, 2023 | 76K86 | St. ClairDistrict 8 | Deck sealing on the Martin Luther King Bridge (SN 082-6001) carrying Illinois Avenue over the Mississippi River. | — | Executed | M & M Concrete, Inc. $78,829 · | ||
| Apr 28, 2023 | 97795 | St. ClairDistrict 8 | HMA resurfacing with ADA improvements on Lebanon Avenue from F Street to IL 161 in Belleville. | — | Executed | Christ Bros. Asphalt, Inc. $1,482,045 · | ||
| Jun 16, 2023 | 76L48 | St. ClairDistrict 8 | Pump replacement at the Keller Pump Station on I-255 south of Collinsville Road. | — | Executed | Davinroy Mechanical Contractor, Inc. $182,000 · | ||
| Jun 16, 2023 | 76M86 | St. ClairDistrict 8 | Lighting on I-55/70/64 from the Mississippi River to east of the I-64 (Tri-Level) Interchange. | — | Rejected | Gerstner Electric, Inc. $8,855,930 · | ||
| Jun 16, 2023 | 76P08 | St. ClairDistrict 8 | Storm water pump station rehab at the 25th Street Pump Station south of I-64. | — | Executed | Haier Plumbing and Heating, Inc. $2,785,320 · | ||
| Jun 16, 2023 | 76P65 | St. ClairDistrict 8 | 1.5 miles of resurfacing and ADA improvements on US 50 from 0.1 miles west of Schantz Road to Anne Avenue in O-Fallon. | — | Executed | Christ Bros. Asphalt, Inc. $2,744,682 · | ||
| Jun 16, 2023 | 76R00 | St. ClairDistrict 8 | New wiring and LED luminaires on I-255 at I-64. | — | Executed | Electrico, Inc. $932,109 · | ||
| Jun 16, 2023 | 76R01 | St. ClairDistrict 8 | New wiring and LED luminaires on I-255 at IL 15. | — | Executed | Electrico, Inc. $862,601 · | ||
| Jun 16, 2023 | 76R73 | St. ClairDistrict 8 | 2.4 miles of patching on 6th Street from IL 161 to IL 177 in Mascoutah. | — | Executed | Kinney Contractors, Inc. $997,922 · | ||
| Jun 16, 2023 | 76R80 | St. ClairDistrict 8 | Painting on SN 082-0144 at the Poplar Street Bridge Complex on I-55 / I-64. | — | Executed | Eagle Painting & Maintenance Company, Inc. $432,000 · | ||
| Jun 16, 2023 | 76R93 | St. ClairDistrict 8 | Bridge joint replacement / repair on SN 082-0017 carrying I-55 / 70 over BandO, Conrail and TRRA Railroad in East St. Louis. | — | Executed | Keeley & Sons, Inc. $1,292,571 · | ||
| Jun 16, 2023 | 76T08 | St. ClairDistrict 8 | 0.5 miles of pavement patching on 26th Street (CH 52) from IL 15 to Bond Avenue in East St. Louis. | — | Executed | Keeley & Sons, Inc. $154,903 · | ||
| Jun 16, 2023 | 76T12 | St. ClairDistrict 8 | Pump replacement at the Bowman Pump Station in East St. Louis, on the north side of I-70, at 728 Exchange Avenue. | — | Executed | Haier Plumbing and Heating, Inc. $346,610 · | ||
| Jun 16, 2023 | 97803 | St. ClairDistrict 8 | Resurfacing Market Place from east of Commerce Drive to west of Lanaghan Drive in Fairview. | — | Rejected | Stutz Excavating, Inc. $533,207 · | ||
| Jun 16, 2023 | 97812 | St. ClairDistrict 8 | Replace existing structure with a three-span PPC deck beam bridge with concrete wearing surface, approach slabs, HMA approach pavement, and traffic barrier terminals, on IMBS Station Road over Prairie DuPont Creek, 2.0 miles west of IL 163. | — | Executed | C-Hill Civil Contractors, Inc. $1,717,889 · | ||
| Jun 16, 2023 | 97813 | St. ClairDistrict 8 | Resurfacing Sullivan Drive from south of Frank Scott Parkway to Huntwood Drive. | — | Executed | The Kilian Corporation $1,263,097 · | ||
| Aug 4, 2023 | 76P67 | MadisonSt. ClairDistrict 8 | Installation of 2 dynamic message signs on butterfly trusses and fiber optic on northbound I-255 at mile marker 7.6 and southbound I-255 at mile marker 27.1. | — | Executed | Keeley & Sons, Inc. and Wissehr Electric, Inc. JV $3,386,988 · | ||
| Sep 22, 2023 | 76R57 | MadisonSt. ClairDistrict 8 | Well treatment at various locations in East St. Louis and Venice. | — | Executed | Layne Christensen Company $856,535 · | ||
| Nov 17, 2023 | 46629 | MadisonSt. ClairDistrict 8 | Installation of new ground-mounted signs on various routes in Madison and St. Clair Counties. | — | Executed | Kujo, Inc. $358,351 · | ||
| Nov 17, 2023 | 76T39 | St. ClairDistrict 8 | 1.96 miles of patching and a standard overlay on I-55/64/US 40 from 0.9 miles east of the Mississippi River to I-64 (Tri-Level) Interchange in East St. Louis | — | Executed | The Kilian Corporation $5,220,980 · | ||
| Nov 17, 2023 | 97815 | St. ClairDistrict 8 | Resurfacing Jerome Lane from Nash Street to Range Lane in Cahokia. | — | Executed | Christ Bros. Asphalt, Inc. $897,940 · | ||
| Nov 17, 2023 | 97817 | St. ClairDistrict 8 | Construction of a PCC sidewalk from the Boul Avenue Trailhead entrance to the intersection of Boul Avenue and IL 159 in Swansea. | — | Rejected | |||
| Jan 19, 2024 | 46638 | St. ClairDistrict 8 | Pavement marking replacement at various locations in St. Clair County. | — | Active | ROADSAFE TRAFFIC SYSTEMS, INC. $894,895 · | ||
| Jan 19, 2024 | 97808 | St. ClairDistrict 8 | Resurfacing on Longacre Drive from Union Hill Road to IL 159 in Fairview Heights. | — | Rejected | The Kilian Corporation $1,289,612 · | ||
| Mar 8, 2024 | 76H41 | St. ClairDistrict 8 | 2 miles of new construction on IL 158 from IL 161 to IL 177, including new SN 082-0276. | — | Executed | Plocher Construction Company, Inc. $19,990,000 · | ||
| Mar 8, 2024 | 76R84 | MadisonSt. ClairDistrict 8 | Traffic signal modernization at various intersections in District 8. (IL 3 / IL 111 at Godfrey Road; IL 203 at Madison Avenue / High Street; IL 203 at Ohio Avenue) | — | Executed | Electrico, Inc. $546,454 · | ||
| Mar 8, 2024 | 76T36 | St. ClairDistrict 8 | 0.8 miles of chip seal and fog seal on California Drive from 79th Street to IL 157. | — | Executed | DMS Contracting, Inc. $60,997 · | ||
| Apr 26, 2024 | 76R37 | St. ClairDistrict 8 | 4.8 miles of fog seal on IL 156 from IL 159 to IL 13. | — | Executed | DeLaurent Construction Co., Inc. $393,454 · | ||
| Apr 26, 2024 | 76R94 | St. ClairDistrict 8 | Replacing high mast, roadway and underpass luminaires along I-55/70/64 near East St. Louis. | — | Executed | Gerstner Electric, Inc. $351,983 · | ||
| Apr 26, 2024 | 76T20 | St. ClairDistrict 8 | 0.5 miles of resurfacing on Boul Avenue from IL 161 to IL 159 in Swansea. | — | Executed | The Kilian Corporation $272,718 · | ||
| Apr 26, 2024 | 76T29 | St. ClairDistrict 8 | 1 mile of patching and resurfacing on IL 111 from the CSX Railroad bridge to Collinsville Road. | — | Executed | Christ Bros. Asphalt, Inc. $694,979 · | ||
| Apr 26, 2024 | 76T34 | St. ClairDistrict 8 | Patching and resurfacing on Collinsville Road/9th Street/Fairmont Avenue from 0.1 miles west of Rose Lake Road in East St. Louis to east of Exchange Avenue. | — | Executed | Christ Bros. Asphalt, Inc. $1,504,972 · | ||
| Apr 26, 2024 | 76T41 | St. ClairWashingtonDistrict 8 | Bridge painting on the structure carrying I-64 westbound over NS Railroad, 0.3 miles east of IL 161 and on the structure carrying IL 127 over Locust Creek, 5.5 miles south of Nashville. (SN 082-0195 and SN 095-0065) | — | Executed | ERA-Valdivia Contractors, Inc. $379,102 · | ||
| Apr 26, 2024 | 76T51 | St. ClairDistrict 8 | Demolition of buildings along Old IL 3 (South Main Street) near Imbs Station Road in Dupo. | — | Executed | Stutz Excavating, Inc. $250,615 · | ||
| Apr 26, 2024 | 76T53 | MadisonSt. ClairDistrict 8 | Traffic signal modernization at various locations: St. Clair Ave. and 37th/38th Street; Foley Drive/70th Street and W. Main Street; 74th Street and Foley Drive; IL 159 and IL 13/158; IL 15 and 74th Street; IL 161 and Frank Scott Parkway in Belleville; IL 3 and Pontoon Road in Granite City. | — | Executed | Electrico, Inc. $263,300 · | ||
| Apr 26, 2024 | 76T64 | St. ClairDistrict 8 | Pump replacement at the Bowman Pump Station in East St. Louis. | — | Executed | Haier Plumbing and Heating, Inc. $590,000 · | ||
| Jun 14, 2024 | 76K05 | St. ClairDistrict 8 | 4.5 miles of patching and resurfacing of mainline I-255, ramps and shoulders, structure rehabilitation, concrete barrier wall replacement, lighting replacement, guardrail replacement, pipe underdrain replacement and other drainage repairs, and sign truss replacement and repairs on I-255 from IL 15 to IL 157. | — | Executed | The Kilian Corporation & Keeley & Sons, Inc. $65,422,089 · | ||
| Jun 14, 2024 | 76R78 | St. ClairDistrict 8 | Modernization of 16 traffic signals along IL 159 from the intersection of Ludwig/Salem Avenue to the intersection of IL 161/N. Belt West Road. Limits of this project also includes I-64 from IL 159 westward to milepost 10.8. | — | Active | Gerstner Electric, Inc. $3,960,000 · | ||
| Jun 14, 2024 | 76T26 | St. ClairDistrict 8 | Bridge deck repairs and bridge joint replacement on SN 082-0289 carrying IL 177 over Loop Creek, 0.3 miles east of IL 158. | — | Executed | The Kilian Corporation $777,410 · | ||
| Jun 14, 2024 | 76T38 | St. ClairDistrict 8 | Deep well and pump repairs at various locations in District 8. | — | Executed | Haier Plumbing and Heating, Inc. $135,590 · | ||
| Jun 14, 2024 | 76T47 | St. ClairDistrict 8 | Adding a new precast concrete vault that will contain two new flow meters installed on 12-inch piping that is the discharge from the 25th Street Pump Station-s deep groundwater wells in East St. Louis. | — | Executed | Hank's Excavating & Landscaping, Inc. $124,250 · | ||
| Jun 14, 2024 | 76T50 | St. ClairDistrict 8 | Intersection improvements and resurfacing at IL 3 and IL 157 in Cahokia Heights. | — | Executed | Christ Bros. Asphalt, Inc. $989,704 · | ||
| Jun 14, 2024 | 97831 | St. ClairDistrict 8 | HMA resurfacing and installation of waterproofing system on three separate PPC deck beam structures. Includes removal of existng HMA surface and waterproofing membrane system, repairs to the beam keyways and dowel bar grout. | — | Executed | The Kilian Corporation $353,072 · | ||
| Aug 2, 2024 | 76R85 | RandolphSt. ClairDistrict 8 | Navigation lighting repairs at various locations along the Kaskaskia River. | — | Executed | Wissehr Electric, Inc. $840,453 · | ||
| Aug 2, 2024 | 76U11 | MadisonSt. ClairDistrict 8 | Dynamic message sign replacement at various locations in District 8. | — | Executed | CSD Environmental Services, Inc. $734,322 · | ||
| Aug 2, 2024 | 97819 | St. ClairDistrict 8 | Intersection Improvements of Queeny Avenue and Falling Springs Road in Sauget. Includes Construction of dedicated left turn lane, shoulder modifications, drainage improvements, pavement markings and signage. | — | Executed | The Kilian Corporation $614,919 · | ||
| Aug 2, 2024 | 97837 | St. ClairDistrict 8 | Construction of new HMA Pavement with Aggregate Base, curb and gutter, drainage facilities, sidewalks and ADA Ramps on McAlister Road from IL 4 to Herman Street in Lebanon. | — | Executed | DMS Contracting, Inc. $872,043 · | ||
| Aug 2, 2024 | 97844 | St. ClairDistrict 8 | Resurfacing and sidewalk construction on Spostsylvania Street from South Van Buren Street to New Baldwin Road in New Athens. | — | Executed | The Kilian Corporation $1,276,509 · | ||
| Sep 20, 2024 | 76N04 | St. ClairDistrict 8 | 3.5 miles of resurfacing on IL 4 from Center Street in Lebanon to the Madison County line. | — | Executed | Christ Bros. Asphalt, Inc. $3,774,113 · | ||
| Sep 20, 2024 | 76T71 | St. ClairDistrict 8 | Well treatment at 5 locations in East St. Louis. | — | Executed | Davinroy Mechanical Contractor, Inc. $818,160 · | ||
| Nov 8, 2024 | 76M49 | St. ClairDistrict 8 | Culvert replacement on Old US 50 at West Tributary East Branch of Silver Creek, east of Summerfield Road in Summerfiled (SN 082-2516). | — | Executed | Stutz Excavating, Inc. $296,885 · | ||
| Nov 8, 2024 | 76T56 | St. ClairDistrict 8 | Sign maintenance on I-55/I-64/US 40 from the Mississippi River to east of the I-64 (Tri-Level) Interchange. | — | Executed | COLLINS & HERMANN, INC. $513,145 · | ||
| Nov 8, 2024 | 76U21 | St. ClairDistrict 8 | 4.8 miles of pavement patching on Bond Avenue from 8th Street in East St. Louis to IL 163 in Cahokia Heights. | — | Executed | |||
| Nov 8, 2024 | 76U22 | MonroeSt. ClairDistrict 8 | 7.5 miles of pavement patching on I-255/IL 3/US 50 from the Mississippi River to IL 157 in Cahokia Heights. | — | Executed | Keeley & Sons, Inc. $959,922 · | ||
| Nov 8, 2024 | 97372 | St. ClairDistrict 8 | Roadway extension of Frank Scott Parkway East from Cross Street to IL 158. | — | Executed | DMS Contracting, Inc. $13,628,661 · | ||
| Jan 17, 2025 | 76M34 | St. ClairDistrict 8 | 1.5 miles of patching on North Belt West from West Main Street in Belleville to IL 161 in Swansea. | — | Executed | Kinney Contractors, Inc. $273,361 · | ||
| Jan 17, 2025 | 76R67 | St. ClairDistrict 8 | Bridge painting at the Poplar Street Complex (SN 082-0005 and SN 082-0144). | — | Executed | Eagle Painting & Maintenance Company, Inc. $1,328,000 · | ||
| Mar 7, 2025 | 76K02 | St. ClairDistrict 8 | Bridge repair, approach roadway and painting on SN 082-0017 carrying I-55/70 over the CSX, KCS, NS, and TRRA Railroads and two private access roads, just east of the I-55/64/70 Tri-Level Interchange near the City of East St. Louis. | — | Executed | Keeley & Sons, Inc. $35,988,571 · | ||
| Mar 7, 2025 | 76L49 | St. ClairDistrict 8 | 0.6 miles of chip seal / fog seal on Summerfield Road / Main Street from Old US 50 to Casad Street in Summerfield. | — | Rejected | DMS Contracting, Inc. $104,126 · | ||
| Mar 7, 2025 | 76R99 | St. ClairDistrict 8 | 7 miles of resurfacing with bridge and ramp repairs on I-64 from 0.2 miles west of IL 157 to 0.3 miles west of Greenmount Road. | — | Executed | The Kilian Corporation and Christ Brothers Asphalt $76,871,166 · | ||
| Mar 7, 2025 | 76T06 | St. ClairDistrict 8 | Bridge painting on SN 082-0192 and 082-0193 carrying I-64 over IL 161 in New Baden. | — | Executed | Eagle Painting & Maintenance Company, Inc. $258,280 · | ||
| Mar 7, 2025 | 76T85 | St. ClairDistrict 8 | 5 miles of longitudinal partial depth patching on I-64 from 0.1 miles west of 15th Street to 0.2 miles west of IL 157. | — | Executed | Christ Bros. Asphalt, Inc. $3,895,613 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.