| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Mar 10, 2023 | 66M37 | LivingstonDistrict 3 | 5.52 miles of shoulder widening and rumble strip installation on IL 17 from IL 170 (N 1500E Rd) to N 2100E Rd in Livingston County. | — | Executed | D. Construction, Inc. $1,244,052 · | ||
| Mar 10, 2023 | 66M64 | LivingstonDistrict 3 | 1.55 mi. Ditch grading and shaping, CMP culvert removal, concrete slope wall removal, installing Precast Concrete Box Culverts, Precast Box Culvert End Sections, earthwork, seeding. Beginning at the Intersection of IL 116 and Deerfield Rd and ending at approximately 192 feet east of SN 053-0066. | — | Executed | Tobey's Construction & Cartage, Inc. $384,412 · | ||
| Mar 10, 2023 | 66N08 | LivingstonDistrict 3 | The work includes turf restoration, aerating, applying herbicide and soil amendments to all existing lawn areas, mulch placement in playgrounds and around existing landscape trees, tree trimming of existing landscape trees, and setup and removal of traffic control at the Limestone Rest Area grounds on Northbound and Southbound I-55 in Livingston County at approximately mile marker 193/194. | — | Rejected | |||
| Mar 10, 2023 | 66N13 | LivingstonDistrict 3 | Milling, resurfacing and drainage work at the Pontiac Traffic Facility at 401 S. Ladd St. in Pontiac. | — | Executed | H. J. Eppel & Co. $203,759 · | ||
| Mar 10, 2023 | 87796 | LivingstonDistrict 3 | Replace the bridge carrying TR 268 over Gosseberry Creek, 0.9 mile south of E 2700 Road North. | — | Executed | Tobey's Construction & Cartage, Inc. $336,879 · | ||
| Mar 10, 2023 | 87803 | LivingstonDistrict 3 | Resurfacing CH 6 from CH 8 to Cherry Street and CH 8 from CH 10 to CH 6. | — | Executed | H. J. Eppel & Co. $2,004,192 · | ||
| Mar 10, 2023 | 87808 | LivingstonDistrict 3 | Replace the bridge carrying TR 129 over Broughton Creet, 0.3 mile west of North 3300. | — | Executed | Tobey's Construction & Cartage, Inc. $472,941 · | ||
| Apr 28, 2023 | 66F93 | LivingstonDistrict 3 | This project is located at the I-55 and IL 17 interchange, beginning at Sta. 32+90 and ending at Sta. 66+40, for a total of 0.63 miles, and includes the removal of SN 053-0014 and replacement with SN 053-0193. Other work includes HMA milling and resurfacing, pavement marking and raised reflective pavement markers. | — | Executed | D. Construction, Inc. $9,100,026 · | ||
| Apr 28, 2023 | 66M75 | LivingstonDistrict 3 | Bridge Repairs at SN 053-0027, 2.5 mi. east of IL 23 and SN 053-0167, 2.8 mi. east of IL 23. | — | Executed | P. T. Ferro Construction Co. $959,278 · | ||
| Jun 16, 2023 | 66B05 | LaSalleLivingstonDistrict 3 | Milling and resurfacing with a designed overlay of IL 18 including storm_sewer construction, drainage and ADA ramp improvements. From the intersection of IL 17 and IL 18 in south eastern Streator and ends at the intersection of Otter Creek Road and IL 18 in Streator. | — | Executed | Advanced Asphalt Company $4,236,173 · | ||
| Aug 4, 2023 | 66N49 | LivingstonDistrict 3 | Class B pavement patching This project is located on US 24 Beginning at the Intersection of N. 2000 E. Rd and ending at the curb and gutter just east of Tenth Street in Fairbury. This work consists of Class B pavement patching. | — | Executed | G. M. Sipes Construction, Inc. $459,272 · | ||
| Aug 4, 2023 | 66N51 | GrundyLivingstonDistrict 3 | Class A pavement Patching, striping and other related work This project is located on Interstate Route 55 beginning at M.M. 2.15 (Beginning of concrete section) to M.M. 218.81(Livingston/Grundy County Line) to M.M. 222 end of concrete section in Grundy County. This work consists of Class A pavement Patching, striping and other related work. | — | Executed | G. M. Sipes Construction, Inc. $378,840 · |
1–12 of 12
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.