IDOT Jobs

All dates · 52 jobs · — Sign up free
★ My Jobs

Filtered by: County: Knox Clear all

52 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 19, 2018 89664 KnoxDistrict 4 Roadway reconstruction on FAS 393(CH4) from CH 15 to IL 17. — Executed Nov 26 New Halverson Construction Co., Inc. $4,167,747 ·
Jan 19, 2018 89699 KnoxDistrict 4 Rehabilitate the bridge carrying Farnham Street over the BNSF Railroad, 0.3 mile north of East Main Street in Galesburg. — Executed Nov 26 New Sangamo Construction Company $2,191,737 ·
Mar 9, 2018 68339 KnoxWarrenDistrict 4 7.52 miles of resurfacing and bridge rehabilitation on US 34/IL 110 from west of Cameron Road to IL Route 164. — Executed Nov 26 New Gunther Construction, a div of UCM, Inc. $13,135,975 ·
Apr 27, 2018 89733 KnoxDistrict 4 Traffic Signal modernization at nine intersections in the City of Galesburg. — Executed Nov 26 New Oberlander Electric Co. $468,309 ·
Jun 15, 2018 68B59 KnoxPeoriaDistrict 4 Guardrail removal and culvert extensions at various locations on IL 8 and US 150, culvert replacement at Location 18 on US 150. — Executed Nov 26 New Illinois Civil Contractors, Inc. $1,589,198 ·
Aug 3, 2018 68E46 KnoxDistrict 4 Replace pedestrian walkway lighting and lighting fixtures at I-74 Spoon River Rest Areas in Knox County. — Executed Nov 26 New Laser Electric, Inc. $81,493 ·
Jan 18, 2019 68E74 KnoxDistrict 4 Structural steel repairs to beams on SN 048-0065 carrying Farnham Street over US 34. — Executed Nov 26 New Halverson Construction Co., Inc. $147,930 ·
Mar 8, 2019 68D10 KnoxDistrict 4 Replacement of a single box culvert with a double (SN-048-2008), HMA pavement, guardrail replacement, earthwork, and other collateral work necessary, located 0.6 mile west of IL-180 near Victoria. — Executed Nov 26 New Kinney Contractors, Inc. $979,988 ·
Apr 26, 2019 89474 KnoxDistrict 4 Replace the bridge carrying CH 4 over Walnut Creek, 0.5 mile west of Altona. — Executed Nov 26 New County Contractors, Inc. $699,269 ·
Jun 14, 2019 68F03 HenryKnoxDistrict 4 REMOVAL OF EXISTING HPS LUMINAIRES AND INSTALLATION OF LED LUMINAIRES ON EXISTING LIGHT POLES ALONG I-74 AT VARIOUS LOCATIONS. — Executed Nov 26 New Laser Electric, Inc. $69,997 ·
Sep 20, 2019 68758 KnoxDistrict 4 Replacement of structure carrying IL 78 over kickapoo creek and replacement of a box culvert. — Executed Nov 26 New Otto Baum Company, Inc. $2,245,718 ·
Sep 20, 2019 68C65 KnoxDistrict 4 CULVERT REPLACEMENTS ON IL 167 0.1 MI SE OF US 34/IL 167, AND 1.3 MI W OF TR 146. — Executed Nov 26 New Valley Construction Co. $1,513,546 ·
Mar 6, 2020 68656 KnoxDistrict 4 Resurfacing on I-74 from 0.3 miles N of US Rte 34 to 0.4 miles N of Main St in Galesburg. — Executed Nov 26 New Gunther Construction, a div of UCM, Inc. $8,250,984 ·
Apr 24, 2020 68D41 KnoxDistrict 4 Replacement of both structures carrying I-74 over French Creek, Class B patching, variable depth milling, placement of HMA, HMA shoulders, and placement of pavement markings in Knox County. — Executed Nov 26 New Stark Excavating, Inc. $4,105,900 ·
Jun 12, 2020 68F53 KnoxDistrict 4 Beam straightening and strengthening on SN 048-0022 carrying US 34/IL 110 over US 150. — Executed Nov 26 New Halverson Construction Co., Inc. $49,336 ·
Jun 12, 2020 89738 KnoxDistrict 4 Reconstruct South Seminary Street from East Berrien Street to Fifth Steet in Galesburg. — Executed Nov 26 New Brandt Construction Co. $3,385,000 ·
Jul 31, 2020 68E18 KnoxDistrict 4 Culvert repair to culvert east side of IL Rte 41, approximately 0.57 mi S of IL 116 in Knox County. — Executed Nov 26 New Brandt Construction Co. $199,999 ·
Jan 15, 2021 68F99 KnoxDistrict 4 Replace two steel girders on Bridge S.N. 048-0065 carrying Farnham Street over US Route 34, just west of the 1-74 interchange in Galesburg for a total length of 0.11 mile. — Executed Nov 26 New White Construction LLC $206,222 ·
Mar 5, 2021 89475 KnoxDistrict 4 Replace the bridge carrying CH 8 over Brush Creek, 5 miles east of Abingdon. — Executed Nov 26 New Curnyn Construction Co. $1,168,725 ·
Jun 11, 2021 68G55 KnoxDistrict 4 1.2 miles of patching on US 150 (Henderson Street) from Home Boulevard to West North Street in Galesburg in Knox County. — Executed Nov 26 New G. M. Sipes Construction, Inc. $72,146 ·
Jul 30, 2021 89791 KnoxDistrict 4 Resurfacing, patching and ADA ramps on Henderson Road from the County Fairground entrance to Poplar Street in Knoxville. — Executed Nov 26 New Gunther Construction, a div of UCM, Inc. $275,374 ·
Jan 21, 2022 68755 KnoxDistrict 4 Replace bridge 048-0017 carrying IL 8 over Hickory Creek, 0.7 mile east of IL 97. — Executed Nov 26 New Stark Excavating, Inc. $1,526,949 ·
Mar 11, 2022 68F73 KnoxDistrict 4 Bridge deck overlay, bridge joint replace//repair, bridge repair to SN 048-0009 and -0010 carrying over East Main Street in Galesburg. — Executed Nov 26 New Brandt Construction Co. $1,167,000 ·
Apr 29, 2022 68G77 KnoxWoodfordDistrict 4 Installation of truck parking information management systems (TPIMS) at the Spoon River and Mackinaw Dells (EB and WB) rest areas. — Executed Nov 26 New Laser Electric, Inc. $179,815 ·
Apr 29, 2022 89819 KnoxDistrict 4 Rehabilitate the structure carrying CH 10 over the BNSF Rail Yard located east of Henderson Street in Galesburg. — Executed Nov 26 New Brandt Construction Co. $5,031,097 ·
Jun 17, 2022 68G92 KnoxDistrict 4 1.90 miles of HMA patching at the I-74 interchange from CR 1925 N. — Executed Nov 26 New Gunther Construction, a div of UCM, Inc. $208,605 ·
Jun 17, 2022 68G94 KnoxDistrict 4 1.15 miles of Class B Patching from Swing Blvd to Main Street in Galesburg, IL. — Executed Nov 26 New G. M. Sipes Construction, Inc. $169,342 ·
Jun 17, 2022 68G95 KnoxDistrict 4 9.62 miles of PCC Patching from US 150/IL 97 Interchange to the Spoon River Rest Area. — Executed Nov 26 New G. M. Sipes Construction, Inc. $289,794 ·
Jun 17, 2022 68G96 KnoxDistrict 4 0.87 miles of HMA Patching from US 150/IL 97 Interchange with I-74 to CH 17/CR 1290N. — Executed Nov 26 New Gunther Construction, a div of UCM, Inc. $165,743 ·
Jun 17, 2022 68G97 KnoxDistrict 4 1.34 miles of HMA Patching from Allens Ave to Michigan Ave in Galesburg, IL. — Executed Nov 26 New Brandt Construction Co. $496,110 ·
Jun 17, 2022 68G98 KnoxDistrict 4 2.45 miles of PCC Patching from I-74/US 34 Interchange to US 150/US 34 Interchange. — Executed Nov 26 New G. M. Sipes Construction, Inc. $193,563 ·
Sep 23, 2022 68H08 KnoxDistrict 4 Mill and resurface parking lot at the Knoxville Storage Yard, South of I-74 (exit 51) on CH 9 (1393 Knox Hwy). — Executed Nov 26 New Illinois Civil Contractors, Inc. $436,864 ·
Jan 20, 2023 68G91 KnoxDistrict 4 Bridge Preservation on S.N. 048-0080 over Spoon River, S .N. 048-0085 and S.N. 048-0086 over Cadwell Creek (2 locations) and S .N. 048-0089 over Branch of Brandywine creek. — Executed Nov 26 New Path Construction Company, Inc. $1,898,891 ·
Jun 16, 2023 68F89 HenryKnoxDistrict 4 Resurfacing on I-74/IL 110 from North of Woodhull to North of US 34. — Executed Nov 26 New Gunther Construction & Advanced Asphalt Company JV $28,792,543 ·
Jun 16, 2023 68H62 KnoxDistrict 4 HMA patching on IL 167 from Knox Road 2000 East to IL 180 in Knox County. — Executed Nov 26 New Gunther Construction, a div of UCM, Inc. $118,583 ·
Jun 16, 2023 68H65 KnoxDistrict 4 HMA patching on Main Street in East Galesburg from 1-74 to CH 9 in Knox County. — Executed Nov 26 New Gunther Construction, a div of UCM, Inc. $152,618 ·
Jun 16, 2023 68H69 KnoxDistrict 4 12.6 miles, HMA edgeline repairs. — Executed Nov 26 New Gunther Construction, a div of UCM, Inc. $252,522 ·
Sep 22, 2023 68G66 KnoxDistrict 4 Repairs 2 box culverts (headwalls, wingwalls, guardrail) 0.49 mi. E of Warren Co. Line and 0.15 mi. E of 325th St. — Executed Nov 26 New Otto Baum Company, Inc. $964,700 ·
Jan 19, 2024 68D48 KnoxPeoriaDistrict 4 New bridge deck on SN 072-0032 carrying IL 78 over I-74, 4.5 miles west of Brimfield, deck replacement and miscellaneous repairs to SN 048-0035 carrying CH 18 over I-74, 3 miles east of Spoon River. — Executed Nov 26 New Stark Excavating, Inc. $4,407,159 ·
Jan 19, 2024 68D83 KnoxDistrict 4 Bridge Preservation to Structure Nos. 048-0007 and 048-0008 carrying 1-74 over the BNSF RR in Galesburg. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $2,637,099 ·
Mar 8, 2024 68J00 KnoxStarkDistrict 4 11 miles of cape seal on Il 41 from Monmouth Blvd. in Galesburg to Hunter St. in Abingdon in Knox County and on Il 78 from the Henry County Line to IL 17 (WB) in Stark County. — Executed Nov 26 New Beniach Construction Co., Inc. $1,746,017 ·
Apr 26, 2024 68H86 KnoxPeoriaDistrict 4 Pavement and drainage under RR viaducts on IL 90 and IL 78 in Peoria and Knox Counties. — Executed Nov 26 New Stark Excavating, Inc. $834,893 ·
Apr 26, 2024 89827 KnoxDistrict 4 HMA resurfacing with ADA improvements, drainage improvements and pavement markings on West Carl Sandburg Drive from Henderson Street to Broad Street in Galesburg. — Executed Nov 26 New Gunther Construction, a div of UCM, Inc. $1,097,188 ·
Jun 14, 2024 68E35 KnoxDistrict 4 Superstructure replacement of SN 048-0051 and 048-0052 carrying I-74 over the Spoon River and TR 238A 0.2 mile west of the Spoon River rest area. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $14,446,748 ·
Jun 14, 2024 89845 KnoxDistrict 4 PCC sidewalk with ADA Ramps and drainage improvements at various locations in Galesburg. — Executed Nov 26 New Centennial Contractors of the Quad Cities, Inc. $407,609 ·
Mar 7, 2025 68E50 KnoxDistrict 4 Widening and resurfacing, culvert replacements, culvert repairs, drainage improvements, and guardrail upgrades on IL 180 from IL 167 to US 150 in Knox County. Approximately 10.48 miles. — Executed Nov 25 New Gunther Construction, a div of UCM, Inc. $29,190,217 ·
Jun 13, 2025 89806 KnoxDistrict 4 Cold-in-place recycling and HMA surfacing on CH 25 and CH 26 from the south corporate limits of Galesburg to CH 26. — Executed Nov 25 New Gunther Construction, a div of UCM, Inc. $1,710,475 ·
Jun 13, 2025 89866 KnoxDistrict 4 Construction of PCC Sidewalk with ADA Ramps along East Fifer Street from Willard Street to Morton Avenue in Galesburg. — Executed Nov 25 New Illinois Civil Contractors, Inc. $302,246 ·
Jan 16, 2026 89834 KnoxDistrict 4 Construct an 8' wide HMA shared-use path along the north side of South Lake Stoney Road to Woodblock Road in Galesburg. Includes; box culvert extensions, pipe culverts, aggregate shoulders, and sidewalk. — Executed Nov 25 New Phoenix Corporation of the Quad Cities $1,916,536 ·
Apr 24, 2026 68K23 KnoxDistrict 4 5.84 miles of 3P resurfacing on US 34 in Knox County from 0.4 mile west of Interstate 74 to Knox Road 900E. — Executed Nov 25 New Gunther Construction, a div of UCM, Inc. $11,296,811 ·
Jun 12, 2026 68J61 KnoxDistrict 4 6.17 miles patching and resurfacing of I-74 from 0.3 miles west of E Main Street in Galesburg to east of the IL 97 interchange; 0.40 miles of patching and resurfacing of E Main Street from 0.2 miles east of Michigan Avenue to_0.1 mile east of Soangetaha Road; and 1.19 miles of patching and resurfacing of US 150/IL 97 from 0.2 miles_east of I-74 westbound ramps to 0.1 miles west of Junction IL 97 south on IL 97. — Rejected Nov 25 New
Jul 31, 2026 68L03 FultonKnoxDistrict 4 HMA patching on IL 97 from Littlers Creek to IL 116. Approximately 2.92 miles gross length. — Executed Nov 25 New Brandt Construction Co. $630,038 ·
1–52 of 52

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.