Filtered by: County: Kane Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 17, 2025 | 61J91 | KaneDistrict 1 | Resurfacing and traffic signal modifications at various intersections on Indian Trail from Edgelawn Drive to Highland Avenue in Aurora | — | Executed | Geneva Construction Company $4,562,538 · | ||
| Jan 17, 2025 | 61K68 | KaneDistrict 1 | HMA resurfacing, curb and gutter, sidewalks, ADA ramps, traffic signals, lighting and pavement markings on Dundee Avenue between Enterprise Street and Page Street in Elgin. | — | Executed | Martam Construction Incorporated $9,964,717 · | ||
| Jan 17, 2025 | 61K98 | KaneDistrict 1 | Construciton of PPC Sidewalks, ADA Ramps, pavement markings and landscaping at various locations in Batavia. | — | Executed | Triggi Construction, Inc. $414,112 · | ||
| Jan 17, 2025 | 61L03 | KaneDistrict 1 | Installation of Recessed Reflective Pavement Markers and pavement marking at various locations in Kane County. | — | Executed | Precision Pavement Markings Inc. $545,288 · | ||
| Mar 7, 2025 | 61J84 | KaneDistrict 1 | Reconstruct IL 38 from Fox River Bridge to Kirk Road in Geneva. | — | Executed | R. W. Dunteman Company $30,162,688 · | ||
| Mar 7, 2025 | 61L26 | KaneDistrict 1 | Resurfacing on Prairie Street from Randall Road to South 13th Street in St. Charles. | — | Rejected | |||
| Apr 25, 2025 | 61K26 | KaneDistrict 1 | Replace the bridge carrying TR 2110 over the CN Railroad, 0.5 mile north of Bowes Road. | — | Executed | Rausch Infrastructure, LLC $3,894,087 · | ||
| Apr 25, 2025 | 62J72 | KaneDistrict 1 | (5,107-Ft) Designed Overlay and ADA Improvements: HMA surface removal and replacement, Class D patches, sidewalk and curb removal and replacement, drainage structures adjustments, minor traffic signal (APS) improvements, detector loops replacement, pavement markings. Located along ILL 31/ ILL 56 (State Street) from I-88 to North River Road within the Village of North Aurora | — | Executed | Geneva Construction Company LLC. $1,373,951 · | ||
| Apr 25, 2025 | 62V37 | KaneDistrict 1 | (2.08-Mile). Smart HMA surface removal and overlay, pavement widening, ADA curb ramp improvements, APS improvements, pavement widening, pavement markings, This project is located along IL 64 (Main Street) and begins just west of 13th Avenue and extends in an easterly direction to Kautz Road/Smith Road. This project is located within the City of St. Charles in Kane County. | — | Executed | Plote Construction, Inc. $3,811,382 · | ||
| Apr 25, 2025 | 62W69 | KaneDistrict 1 | Pavement patching, hot-mix asphalt pavement removal and replacement combination curb and gutter removal and re (3.37-Mile) This is a standard overlay and ADA improvement. This project consists of pavement patching, hot-mix asphalt pavement removal and replacement combination curb and gutter removal and replacement, ADA pedestrian ramp improvements, thermoplastic pavement marking, sidewalk removal and replacement. This improvement is on FAU 2503: IL-25, US 30 (Aurora Avenue) within the City of Aurora in Kane County. | — | Executed | Geneva Construction Company LLC. $4,184,234 · | ||
| Jun 13, 2025 | 61L40 | KaneDistrict 1 | Resurfacing and the construction of a multi-use path on Sleepy Hollow Road from Huntley Road to IL-72 in West Dendee. | — | Executed | Schroeder Asphalt Services, Inc. $1,348,856 · | ||
| Jun 13, 2025 | 61L59 | KaneDistrict 1 | HMA resurfacing on State Street from Hampshire Creek to Allen Road in Hampshire. Includes pavement patching, curb and gutter, and drainage structure adjustments. | — | Executed | Curran Contracting Company $308,598 · | ||
| Jun 13, 2025 | 61L60 | KaneDistrict 1 | HMA resurfacing on South Elgin Boulevard from East Main Street to the north village limits of South Elgin. Includes curb and gutter, drainage structures, and parkway restoration. | — | Executed | Plote Construction, Inc. $1,197,423 · | ||
| Jun 13, 2025 | 62X33 | KaneDistrict 1 | Hot-mix asphalt surface removal, pavement patching, resurfacing with asphalt binder course and asphalt surface (6.70-Mile) Design overlay consists of hot-mix asphalt surface removal, pavement patching, resurfacing with asphalt binder course and asphalt surface course, placement of thermoplastic pavement markings. Located on Illinois Rte. FAP 567, IL 38, from Dekalb County Line to IL 47 (Main Street) within the Village of Elburn in Kane County. | — | Rejected | Builders Paving, LLC $4,414,888 · | ||
| Jun 13, 2025 | 62X59 | KaneDistrict 1 | (1.12-Mile) Designed Overlay, Traffic Signal Modernization, ADA Improvement consists asphalt surface removal, pavement patching, (HMA) binder and surface course, concrete curb and gutter removal and replacement, pedestrian curb ramps (ADA) improvements, traffic signal modernization, accessible pedestrian signal improvements, detector loop replacement, raised reflective pavement markers, pavement marking. Located within the City of Elgin in Kane County. | — | Executed | Plote Construction, Inc. $2,838,180 · | ||
| Jun 13, 2025 | 62X61 | KaneDistrict 1 | Hot-mix asphalt pavement removal and replacement, combination curb and gutter removal and replacement, thermop (2,955-Ft) Design Overlay and ADA improvements consist of hot-mix asphalt pavement removal and replacement, combination curb and gutter removal and replacement, thermoplastic pavement marking, sidewalk removal and replacement. Project is located in the Cities of Highwood and Highland Park, Lake County. | — | Executed | Peter Baker & Son Co. $922,469 · | ||
| Jun 13, 2025 | 62X67 | KaneDistrict 1 | Asphalt surface removal, placement of (HMA) surface course, pavement patching, pavement markings SMART Overlay and Standard Overlay improvement project consists of asphalt surface removal, placement of (HMA) surface course, pavement patching, pavement markings. The project is located in the villages of Hampshire and Pingree Grove within Kane County. | — | Executed | Curran Contracting Company $2,654,662 · | ||
| Jun 13, 2025 | 62X69 | KaneDistrict 1 | (1.79-Mile) SMART and Designed Overlay, ADA Improvements, New Shoulders Improvements include curb and gutter spot repairs (remove and replace), sidewalk removal and replacement for curb ramps for sidewalks (ADA), (HMA) surface removal and replacement, (cold milling and inlay), full-depth patches (Class D), drainage structures adjustment and cleaning, pavement marking, pedestrian signals (APS) improvements and detector loops. Location: IL 56 (Butterfield Road), from East of IL 25 River Road to We | — | Executed | Geneva Construction Company LLC. $2,713,457 · | ||
| Jun 13, 2025 | 62Y02 | CookKaneDistrict 1 | Cleaning and painting steel surfaces as designated on the plans and any incidental and collateral work (0.01-Mile) This is a bridge painting project consists of cleaning and painting steel surfaces as designated on the plans and any incidental and collateral work. This project has two locations: (SN 045-0037 and SN 047-0029) 1) Galena Blvd over IL-56 in the Village of Sugar Grove. 2) US 30 over Blackberry Creek in the Village of Montgomery. | — | Executed | Capital Industrial Services, LLC $499,333 · | ||
| Aug 1, 2025 | 61L58 | KaneDistrict 1 | Reconstruction and resurfacing of L.W. Besinger Drive from Lake Marian Road to IL 25 in Carpentersville. | — | Executed | Plote Construction, Inc. $5,096,305 · | ||
| Aug 1, 2025 | 61L61 | KaneDistrict 1 | Resurfacing on Merrill Road from the Village limits to Bliss Road in Sugar Grove. | — | Executed | Builders Paving, LLC $448,788 · | ||
| Aug 1, 2025 | 61L67 | KaneDistrict 1 | Reconstruction of Wheeler Road from Dugan Road to Esker Drive in Sugar Grove. | — | Executed | D. Construction, Inc. $472,933 · | ||
| Aug 1, 2025 | 62X45 | CookKaneKendallDistrict 1 | Bridge deck concrete sealer entire top surface of bridge deck, sidewalks, top of inside vertical faces of the This improvement consists of bridge deck concrete sealer entire top surface of bridge deck, sidewalks, top of inside vertical faces of the parapets, face of curbs, and inside and outside of dividing walls along walkways of the structure placement of modified urethane pavement markings. Located throughout Cook, Kane and Kendall Counties. | — | Executed | Mosley Construction 1, LLC $1,455,444 · | ||
| Sep 19, 2025 | 61L28 | KaneDistrict 1 | Construction of additonal through lanes on each side of Randall Road at the intersection of IL 72, widening to 3 NB and SB lanes. Includes HMA multi- use patch, curb and gutter, drainage improvements, traffic signal modifications, and lighting. | — | Executed | Martam Construction Incorporated $11,987,774 · | ||
| Sep 19, 2025 | 61L74 | KaneDistrict 1 | Construction of PCC Sidewalk along various routes in Hampshire. Includes; HMA an PCC Driveways and pavement markings. | — | Executed | Triggi Construction, Inc. $354,811 · | ||
| Sep 19, 2025 | 62K78 | KaneDistrict 1 | Cold milling existing (HMA) surface, full-depth patches (Class D), resurfacing (inlay) with HMA binder and sur (2.54-Mile) Designed Overlay, New Shoulders, and ADA Improvements: The proposed consists of cold milling existing (HMA) surface, full-depth patches (Class D), resurfacing (inlay) with HMA binder and surface course, longitudinal joint sealing, replacement of curb and gutter, sidewalk removal and replacement for for sidewalks (ADA), replacement of existing aggregate shoulders with HMA, drainage structures adjustments and cleaning, pavement markings and raised reflective Location: IL 25 (Saint Char | — | Executed | Plote Construction, Inc. $4,318,000 · | ||
| Nov 7, 2025 | 61L97 | KaneDistrict 1 | HMA resurfacing on Spruce and E. Main Street from Gilbert Street to Kenyon Road in South Elgin. Includes; curb and gutter, drainage, parkway restoration, patching, replacment of pedestrian push buttons and detector loops. | — | Executed | Everlast Blacktop Inc. $763,936 · |
1–27 of 27
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.