IDOT Jobs

Jun 2026 · 9 jobs · — Sign up free
★ My Jobs

Filtered by: County: Kane Clear all

9 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jun 12, 2026 61L30 KaneDistrict 1 Full-depth reclamation and HMA surfacing of Brown Road, Campton Hills Road, Denker Road and Town Hall Road in the village of Campton Hills. — Executed Nov 25 New Builders Paving, LLC $2,893,888 ·
Jun 12, 2026 61M10 KaneDistrict 1 Traffic signal modernization along Indian Trail Road between Ohio Street and Pennsbury Lane in the city of Aurora. — Rejected Nov 25 New K-Five Construction Corporation $5,028,975 ·
Jun 12, 2026 61M42 KaneDistrict 1 Resurfacing Wheeler Road from Esker Drive to IL 47 in the village of Sugar Grove. — Executed Nov 25 New D. Construction, Inc. $654,874 ·
Jun 12, 2026 61M43 KaneDistrict 1 Resurfacing Dugan Road from North Wheeler Road to south of Fays Lane in the village of Sugar Grove. — Executed Nov 25 New D. Construction, Inc. $692,262 ·
Jun 12, 2026 61M44 KaneDistrict 1 Resurfacing 1st Street from IL 72 to Dunning Avenue in the village of West Dundee. — Executed Nov 25 New Geske and Sons, Inc. $754,807 ·
Jun 12, 2026 62M71 KaneKendallDistrict 1 Earth excavation, embankment, structure removal, portland cement concrete (PCC) pavement, hot-mix asphalt pave (3.59-Mile) Roadway Reconstruction project on a new shifted alignment consists of earth excavation, embankment, structure removal, portland cement concrete (PCC) pavement, hot-mix asphalt pavement, hot-mix asphalt binder and surface courses, pavement removal, PCC shoulder, hot-mix asphalt shoulder, combination concrete curb and gutter, concrete median, PCC sidewalk, drainage improvements, sheet pile retaining wall, cast in place box culverts, traffic signal installation, water main relocation, l — Executed Nov 25 New D. Construction, Inc. $52,733,996 ·
Jun 12, 2026 62V08 CookDuPageKaneDistrict 1 Ditch regrading, culvert replacement, and various other drainage improvements The work on this project consists of ditch regrading, culvert replacement, and various other drainage improvements. This project is in DuPage County, This project is in DuPage County, Cook County and Kane County. — Executed Nov 25 New D. Construction, Inc. $1,863,322 ·
Jun 12, 2026 62V78 DuPageKaneDistrict 1 (1.31-Mile) This is a crack and joint sealant improvement consisting of routing cleaning, and sealing of longitudinal cracks and joints within concrete pavement, concrete patching, grading and shaping shoulders, some guardrail replacement, modified urethane pavement marking. This improvement is located within the City of Geneva and West Chicago in Kane and DuPage Counties. — Executed Nov 25 New Mosley Construction 1, LLC $850,529 ·
Jun 12, 2026 80B23 KaneDistrict 1 Pavement patching, milling of existing HMA surface, placing HMA surface course, placement of pavement markings (2.81-Mile) SMART Overlay and Shoulder Repair consist of pavement patching, milling of existing HMA surface, placing HMA surface course, placement of pavement markings, shoulder work, rumble strips. The improvement is in the Villages of Gilberts and Pingree Grove in Kane County. — Executed Nov 25 New Plote Construction, Inc. $3,171,166 ·
1–9 of 9

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.