Filtered by: County: Bureau Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 17, 2025 | 66P33 | BureauDistrict 3 | Deck patching, approach pavement resurfacing, parapet repairs, expansion joint replacement, substructure repairs, and slope wall repairs at SN 006-0056. | — | Executed | D. Construction, Inc. $439,369 · | ||
| Jan 17, 2025 | 66P34 | BureauDistrict 3 | bridge repairs including deck patching, expansion joint replacement, approach slab replacement, pavement and shoulder replacement at SN 006-0101 carrying IL 92 over the branch of Masters Creek 0.7 miles west of Van Orin. | — | Executed | D. Construction, Inc. $466,071 · | ||
| Jan 17, 2025 | 66P90 | BureauLivingstonDistrict 3 | Bridge deck sealing with the parapets/curbs on various routes at various locations throughout Bureau and Livingston Counties. | — | Executed | M & M Concrete, Inc. $159,932 · | ||
| Mar 7, 2025 | 66K70 | BureauDistrict 3 | 350 ft of Bridge Repairs (SN 006-0097) over Green River, 1.4 MI W OF IL 40. | — | Executed | Martin & Company Excavating $650,504 · | ||
| Mar 7, 2025 | 66R29 | BureauDistrict 3 | 2.3 miles HMA milling and resurfacing, patching, pavement marking, and reflective markers on SBI 7C (2775E RD), from US 6 to IL 29 in Bureau County. | — | Executed | Advanced Asphalt Company $1,461,525 · | ||
| Mar 7, 2025 | 66R30 | BureauDistrict 3 | HMA milling and resurfacing, patching, pavement marking and reflective markers on SBI 88 (NEW BEDFORD RD), from Main St in New Bedford to IL 40 in Bureau County. 1.74 mile gross length. | — | Executed | Advanced Asphalt Company $985,903 · | ||
| Mar 7, 2025 | 87738 | BureauDistrict 3 | Construct a single span PPC deck beam bridge to carrying 600 Avenue North over Silver Creek. | — | Executed | Curnyn Construction Co. $429,897 · | ||
| Apr 25, 2025 | 66M48 | BureauDistrict 3 | Replacing the deck and approaches, abutment conversion to semi-integral abutments, substructure repairs, slope wall replacement, roadway resurfacing, guardrail replacement as needed, a private driveway reconstruction, and pavement marking on FAP 646 (IL 40) on the south side of Buda at SN 006-0138 carrying FAP 646 over the Burlington Northern Santa Fe Railroad. | — | Executed | D. Construction, Inc. $1,939,442 · | ||
| Apr 25, 2025 | 66P89 | BureauDistrict 3 | Removing existing inlets, storm sewer, installing inlets, paved ditch, guardrail removal and replacement, pipe drains, pipe underdrains, grading and shaping ditches and other related construction items on IL 26 from the intersection with 1950 Ave North and ending at the City County Park Rd entrance north of Princeton. 1.1 mile gross lenth. | — | Executed | Gillan Construction LLC $601,985 · | ||
| Apr 25, 2025 | 66R19 | BureauDistrict 3 | Milling, resurfacing, aggregate shoulders, rumble strips, pavement marking, raised reflective pavement markers, and other related construction items on IL Route 89 beginning at the north approach pavement of SN 006-0178 and ending at Cleveland St in Ladd. It also includes the djacent I-80 Frontage Rd beginning at IL 89 intersection and ends at the Ladd Maintenance facility. | — | Executed | Advanced Asphalt Company $987,951 · | ||
| Apr 25, 2025 | 87880 | BureauDistrict 3 | Replace sidewalks and ADA ramp improvements along Cleveland street from Peru Avenue to Summit Avenue in Ladd. | — | Executed | Gillan Construction LLC $255,362 · | ||
| Jun 13, 2025 | 66K71 | BureauDistrict 3 | Bridge replacement of SN 006-0089 and interchange lighting at IL-40 (overhead), 3.4 miles north of Buda. | — | Executed | D. Construction, Inc. $9,911,953 · | ||
| Jun 13, 2025 | 66R32 | BureauDistrict 3 | Staged construction of 13.54 miles of 2" milling and stone matrix asphalt surface paving on the I-80 driving and passing lanes between Princeton and Ladd. | — | Executed | Advanced Asphalt Company $17,962,555 · | ||
| Jun 13, 2025 | 66R51 | BureauDistrict 3 | Pollinator project will include herbicide, seeding, landscaping, and maintenance at the Great Sauk Trail Rest Area EB and WB on I-80 near mm 51. | — | Rejected | Semper Fi Yard Service, Inc. d/b/a Semper Fi Land Service, Inc. $468,223 · | ||
| Jun 13, 2025 | 87855 | BureauDistrict 3 | HMA resurfacing with aggregate shoulders on CH 24 from US 34 to CH 9. | — | Executed | Advanced Asphalt Company $2,426,250 · | ||
| Sep 19, 2025 | 66R60 | BureauDistrict 3 | Shoulder removal and replacement, concrete removal, remove and replace expansion bearings, expansion joint replacement at SN 006-0116 carrying Backbone Rd. over I-80, 1.8 miles west of IL Route 26 near Princeton. | — | Executed | Martin & Company Excavating $373,944 · |
1–16 of 16
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.