18,642Let jobs
$76,971,155,782Total low bids
$79,237,330,402Total estimates
-2.9%Low bids vs estimates
All dates results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Jul 26, 2022 | 6400-76-001MMC - 640076001 | Kaufman Dallas |
LIMESTONE ROCK ASPHALTFM 2728 · | $184,800 | $203,550 | VULCAN CONSTRUCTION MATERIALS, LLC | +10.1% | 1 |
| Jul 26, 2022 | 6411-23-001MMC - 641123001 | Collin Dallas |
FLEXIBLE BASESH 5 · | $168,200 | $190,000 | DIGG COMMERCIAL, LLC | +13.0% | 2 |
| Jul 26, 2022 | 6414-27-001RMC - 641427001 | Ellis Dallas |
METAL BEAM GUARD FENCE UPGRADEIH 35E · | $164,670 | $178,250 | TALBRAN ENTERPRISES LLC | +8.2% | 2 |
| Jul 26, 2022 | 6412-99-001MMC - 641299001 | Kaufman Dallas |
HYDRAULIC CEMENTFM 2728 · | $108,528 | $106,680 | AKA-MATERIALS | -1.7% | 2 |
| Jul 26, 2022 | 6412-67-001MMC - 641267001 | Kaufman Dallas |
ASPHALTIC PATCHING MATERIALFM 2728 · | $75,000 | $75,376 | WALLER COUNTY ASPHALT INC. | +0.5% | 3 |
| Jul 26, 2022 | 6406-71-001RMC - 640671001 | Runnels San Angelo |
SMALL SIGN REPLACEMENTUS 83 · | $92,681 | $71,848 | JASCO | -22.5% | 5 |
| Jul 26, 2022 | 6412-13-001MMC - 641213001 | Kaufman Dallas |
LIMEFM 2728 · | $22,400 | $14,400 | TEXAS LIME COMPANY | -35.7% | 2 |
| Jul 25, 2022 | 6402-29-001MMC - 640229001 | Calhoun Yoakum |
HOT-MIX COLD-LAIDSH 35 · | $297,000 | $353,100 | QUALITY HOT MIX, INC. | +18.9% | 3 |
| Jul 21, 2022 | 6406-40-001MMC - 640640001 | Comal San Antonio |
AGGREGATEIH 35 · | $250,500 | $365,000 | COLORADO MATERIALS, LTD. | +45.7% | 3 |
| Jul 21, 2022 | 6406-55-001MMC - 640655001 | Kerr San Antonio |
AGGREGATEIH 10 · | $274,800 | $356,801 | VULCAN CONSTRUCTION MATERIALS, LLC | +29.8% | 4 |
| Jul 21, 2022 | 6406-57-001MMC - 640657001 | Medina San Antonio |
AGGREGATEIH 35 · | $255,000 | $339,965 | VULCAN CONSTRUCTION MATERIALS, LLC | +33.3% | 4 |
| Jul 21, 2022 | 6406-75-001MMC - 640675001 | Medina San Antonio |
HOT MIXIH 35 · | $283,600 | $324,150 | TEXAS MATERIALS GROUP, INC. | +14.3% | 3 |
| Jul 21, 2022 | 6406-41-001RMC - 640641001 | Maverick Laredo |
CLEANING AND SWEEPING HIGHWAYSUS 277 · | $265,078 | $317,746 | VIZCAINO, L.P. | +19.9% | 2 |
| Jul 21, 2022 | 6406-38-001MMC - 640638001 | Bexar San Antonio |
HOT-MIX COLD-LAIDIH 35 · | $272,400 | $281,834 | VULCAN CONSTRUCTION MATERIALS, LLC | +3.5% | 6 |
| Jul 21, 2022 | 6413-29-001RMC - 641329001 | Webb Laredo |
ILLUMINATION MAINTENANCEUS 83 · | $209,600 | $230,560 | TRIPLE H FIELD SERVICES, LLC | +10.0% | 1 |
| Jul 21, 2022 | 6403-98-001RMC - 640398001 | Liberty Beaumont |
TREE TRIMMING AND BRUSH REMOVALUS 90 · | $216,900 | $227,640 | ROAD SOLUTIONS L.L.C. | +5.0% | 2 |
| Jul 21, 2022 | 6413-27-001RMC - 641327001 | Val Verde Laredo |
ILLUMINATION MAINTENANCEUS 277 · | $200,000 | $220,000 | TRIPLE H FIELD SERVICES, LLC | +10.0% | 1 |
| Jul 21, 2022 | 6412-47-001MMC - 641247001 | Sabine Lufkin |
ASPHALTIC PATCHING MATERIALFM 83 · | $210,209 | $172,088 | EAST TEXAS ASPHALT CO., LTD. | -18.1% | 2 |
| Jul 21, 2022 | 6403-18-001RMC - 640318001 | Grayson Paris |
LITTER REMOVALUS 82 · | $179,937 | $171,778 | CTX SPECIAL SERVICES CO LLC | -4.5% | 2 |
| Jul 21, 2022 | 6402-07-001RMC - 640207001 | Orange Beaumont |
CRACK SEALIH 10 · | $291,892 | $171,232 | D & M CONTRACTORS, LLC | -41.3% | 5 |
| Jul 21, 2022 | 6409-95-001MMC - 640995001 | Franklin Paris |
HYDRAULIC CEMENTIH 30 · | $192,024 | $170,730 | AKA-MATERIALS | -11.1% | 2 |
| Jul 21, 2022 | 6413-99-001RMC - 641399001 | Val Verde Laredo |
SWEEPING AND DEBRIS REMOVALUS 277 · | $79,007 | $112,124 | RK POWER DRIVE SERVICES, INC. | +41.9% | 1 |
| Jul 21, 2022 | 6409-23-001RMC - 640923001 | Fannin Paris |
PICNIC AREA MAINTENANCESH 78 · | $37,475 | $37,200 | FELLOWSHIP LANDSCAPING | -0.7% | 2 |
| Jul 19, 2022 | 6411-69-001MMC - 641169001 | Crockett San Angelo |
HOT MIXSH 163 · | $225,000 | $320,963 | CSA MATERIALS INC. | +42.7% | 1 |
| Jul 19, 2022 | 6411-67-001MMC - 641167001 | Concho San Angelo |
HOT MIXUS 83 · | $225,000 | $314,413 | CSA MATERIALS INC. | +39.7% | 1 |
| Jul 19, 2022 | 6411-63-001MMC - 641163001 | Coke San Angelo |
HOT MIXSH 158 · | $225,000 | $309,125 | CSA MATERIALS INC. | +37.4% | 1 |
| Jul 19, 2022 | 6411-65-001MMC - 641165001 | Tom Green San Angelo |
HOT MIXUS 87 · | $225,000 | $306,900 | CSA MATERIALS INC. | +36.4% | 1 |
| Jul 19, 2022 | 6412-15-001BPM - 641215001 | Runnels San Angelo |
DEBRIS REMOVALUS 83 · | $74,950 | $74,227 | BECK-REIT & SONS, LTD. | -1.0% | 2 |
| Jul 19, 2022 | 6411-95-001MMC - 641195001 | Sabine Lufkin |
HYDRAULIC CEMENT CONCRETEFM 83 · | $70,800 | $66,000 | AKA-MATERIALS | -6.8% | 1 |
| Jul 19, 2022 | 6412-89-001MMC - 641289001 | Polk Lufkin |
ROCK/RIPRAPUS 59 · | $22,452 | $21,150 | EAST TEXAS ASPHALT CO., LTD. | -5.8% | 1 |
| Jul 18, 2022 | 6413-67-001MMC - 641367001 | Wilbarger Wichita Falls |
HOT MIXUS 287 · | $265,100 | $377,430 | OVERLAND MATERIALS & MANUFACTURING, INC. | +42.4% | 1 |
| Jul 18, 2022 | 6413-63-001MMC - 641363001 | Wichita Wichita Falls |
HOT MIXUS 287 · | $266,950 | $283,650 | EUROVIA ATLANTIC COAST LLC | +6.3% | 2 |
| Jul 14, 2022 | 6403-36-001RMC - 640336001 | Ellis Dallas |
FLEXIBLE PAVEMENT STRUCTURE REPAIRUS 287 · | $238,970 | $353,318 | FOUTSCO PAVING COMPANY, LLC | +47.9% | 2 |
| Jul 14, 2022 | 6411-47-001RMC - 641147001 | Shelby Lufkin |
METAL BEAM GUARD FENCE REPAIRUS 96 · | $279,401 | $241,395 | ACE CONTRACTORS, INC. | -13.6% | 2 |
| Jul 14, 2022 | 6411-49-001RMC - 641149001 | Sabine Lufkin |
METAL BEAM GUARD FENCE REPAIRUS 96 · | $221,023 | $173,638 | ACE CONTRACTORS, INC. | -21.4% | 2 |
| Jul 13, 2022 | 6386-77-001RMC - 638677001 | Burnet Austin |
TREE TRIMMING AND BRUSH REMOVALUS 281 · | $256,853 | $451,759 | BOEN LANDSCAPING & IRRIGATION, LLC | +75.9% | 3 |
| Jul 13, 2022 | 6386-79-001RMC - 638679001 | Hays Austin |
TREE TRIMMING AND BRUSH REMOVALRM 12 · | $217,065 | $432,000 | BOEN LANDSCAPING & IRRIGATION, LLC | +99.0% | 3 |
| Jul 13, 2022 | 6410-52-001MMC - 641052001 | Burleson Bryan |
HOT MIXSH 36 · | $228,000 | $238,000 | KNIFE RIVER CORPORATION - SOUTH | +4.4% | 1 |
| Jul 13, 2022 | 6411-45-001RMC - 641145001 | San Jacinto Lufkin |
TREE TRIMMING AND BRUSH REMOVALUS 59 · | $267,475 | $227,300 | K & R CONTRACTORS | -15.0% | 5 |
| Jul 13, 2022 | 6393-28-001RMC - 639328001 | Erath Fort Worth |
CRACK SEALUS 377 · | $261,369 | $216,370 | D & M CONTRACTORS, LLC | -17.2% | 5 |
| Jul 13, 2022 | 6411-21-001RMC - 641121001 | Houston Lufkin |
TREE TRIMMING AND BRUSH REMOVALUS 287 · | $224,325 | $200,526 | CEHAND ROOFING AND CONSTRUCTION, LLC | -10.6% | 5 |
| Jul 13, 2022 | 6409-63-001RMC - 640963001 | Brazos Bryan |
CRACK SEALFM 60 · | $212,757 | $198,344 | D & M CONTRACTORS, LLC | -6.8% | 3 |
| Jul 13, 2022 | 6411-13-001MMC - 641113001 | Brazos Bryan |
EMULSIONSH 6 · | $165,000 | $178,950 | CLEVELAND ASPHALT PRODUCTS, INC. | +8.5% | 4 |
| Jul 13, 2022 | 6386-76-001RMC - 638676001 | Bastrop Austin |
TREE TRIMMING AND BRUSH REMOVALSH 21 · | $191,604 | $167,566 | BA NEWTON'S ENTERPRISES LLC | -12.5% | 4 |
| Jul 13, 2022 | 6391-41-001RMC - 639141001 | Johnson Fort Worth |
CRACK SEALIH 35W · | $133,794 | $145,407 | NATIONAL INDUSTRIAL MAINTENANCE, INC. | +8.7% | 4 |
| Jul 13, 2022 | 6399-13-001RMC - 639913001 | Wise Fort Worth |
CLEANING AND SEALING CRACKSUS 81 · | $257,090 | $136,110 | D & M CONTRACTORS, LLC | -47.1% | 5 |
| Jul 13, 2022 | 6411-15-001MMC - 641115001 | Washington Bryan |
AGGREGATESH 36 · | $84,900 | $126,000 | TOUCHSTONE RESOURCES, LLC | +48.4% | 2 |
| Jul 13, 2022 | 6398-83-001MMC - 639883001 | Gregg Tyler |
WINTER WEATHER MATERIALUS 80 · | $249,480 | $115,316 | THE BARGAIN SOURCE | -53.8% | 2 |
| Jul 13, 2022 | 6410-23-001MMC - 641023001 | Brazos Bryan |
HYDRAULIC CEMENTSH 6 · | $82,848 | $87,540 | AKA-MATERIALS | +5.7% | 1 |
| Jul 13, 2022 | 6386-78-001RMC - 638678001 | Travis Austin |
TREE TRIMMING AND BRUSH REMOVALFM 969 · | $72,872 | $64,043 | BA NEWTON'S ENTERPRISES LLC | -12.1% | 5 |
| Jul 13, 2022 | 6411-19-001MMC - 641119001 | Washington Bryan |
ASPHALTIC PATCHING MATERIALSH 36 · | $9,375 | $9,065 | WALLER COUNTY ASPHALT INC. | -3.3% | 1 |
| Jul 12, 2022 | 6401-44-001RMC - 640144001 | Harris Houston |
STORM SEWER SYSTEM CLEANINGSH 249 · | $286,869 | $302,883 | SHALOM SERVICES CORPORATION | +5.6% | 1 |
| Jul 12, 2022 | 6409-93-001MMC - 640993001 | Milam Bryan |
HOT MIXSH 36 · | $223,800 | $243,970 | TEXAS MATERIALS GROUP, INC. | +9.0% | 1 |
| Jul 12, 2022 | 6409-21-001MMC - 640921001 | Walker Bryan |
AGGREGATEIH 45 · | $156,000 | $239,250 | COLORADO MATERIALS, LTD. | +53.4% | 1 |
| Jul 12, 2022 | 6410-55-001MMC - 641055001 | Midland Odessa |
LIMESTONE ROCK ASPHALTIH 20 · | $180,250 | $231,750 | VULCAN CONSTRUCTION MATERIALS, LLC | +28.6% | 1 |
| Jul 12, 2022 | 6398-84-001MMC - 639884001 | Smith Tyler |
SNOW AND ICE CONTROLUS 69 · | $272,920 | $208,320 | SOUTHWEST ENVIROTX PARTNERS, LLC | -23.7% | 3 |
| Jul 12, 2022 | 6410-57-001MMC - 641057001 | Ector Odessa |
LIMESTONE ROCK ASPHALTSL 338 · | $152,500 | $194,163 | VULCAN CONSTRUCTION MATERIALS, LLC | +27.3% | 1 |
| Jul 12, 2022 | 6408-49-001RMC - 640849001 | Midland Odessa |
CLEANING AND SEALING CRACKSSH 349 · | $215,499 | $174,516 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -19.0% | 6 |
| Jul 12, 2022 | 6406-92-001RMC - 640692001 | Ward Odessa |
CLEANING AND SEALING CRACKSIH 20 · | $177,100 | $137,640 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -22.3% | 5 |
| Jul 12, 2022 | 6410-54-001MMC - 641054001 | Pecos Odessa |
LIMESTONE ROCK ASPHALTBI 10G · | $99,500 | $128,482 | VULCAN CONSTRUCTION MATERIALS, LLC | +29.1% | 1 |
| Jul 12, 2022 | 6410-51-001RMC - 641051001 | Robertson Bryan |
BRIDGE SCOUR REPAIRFM 1373 · | $103,614 | $102,948 | SHALOM SERVICES CORPORATION | -0.6% | 4 |
| Jul 12, 2022 | 6409-91-001MMC - 640991001 | Washington Bryan |
HYDRAULIC CEMENTSH 36 · | $82,848 | $87,440 | AKA-MATERIALS | +5.5% | 1 |
| Jul 12, 2022 | 6409-61-001RMC - 640961001 | Washington Bryan |
CRACK SEALSH 36 · | $88,071 | $55,479 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -37.0% | 5 |
| Jul 12, 2022 | 6409-33-001MMC - 640933001 | Collin Dallas |
EMULSIONSH 5 · | $21,600 | $25,856 | MARTIN RESOURCE MANAGEMENT CORPORATION | +19.7% | 3 |
| Jul 6, 2022 | 6409-07-001RMC - 640907001 | Angelina Lufkin |
RAISED PAVEMENT MARKERSUS 59 · | $281,000 | $285,344 | BRYDL CONTRACTING, LLC | +1.5% | 2 |
| Jul 6, 2022 | 6407-98-001RMC - 640798001 | Angelina Lufkin |
TRAFFIC SIGNAL MAINTENANCEUS 59 · | $262,350 | $242,777 | BAY CITY TRAFFIC | -7.5% | 1 |
| Jun 30, 2022 | 0195-02-076C 195-2-76 | Denton Dallas |
WIDEN ROAD - ADD LANESIH 35 · | $103,131,751 | $119,332,000 | WEBBER, LLC | +15.7% | 5 |
| Jun 30, 2022 | 0215-01-044F 2022(901) | Comal San Antonio |
WIDEN ROAD - ADD LANESSH 46 · | $60,014,958 | $59,488,630 | WEBBER, LLC | -0.9% | 3 |
| Jun 30, 2022 | 0198-03-026C 198-3-26 | Anderson Tyler |
WIDEN ROAD - ADD LANESUS 175 · | $48,036,549 | $55,487,305 | BIG CREEK CONSTRUCTION, LTD. | +15.5% | 4 |
| Jun 30, 2022 | 2679-03-015C 2679-3-15 | Collin Dallas |
RECONSTRUCT 2 LANE RURAL TO 4 LANE DIVIDEDFM 2514 · | $43,170,226 | $50,385,911 | WEBBER, LLC | +16.7% | 3 |
| Jun 30, 2022 | 0292-01-034F 2022(583) | Winkler Odessa |
HIGHWAY IMPROVEMENTSH 18 · | $30,502,877 | $37,268,536 | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | +22.2% | 3 |
| Jun 30, 2022 | 0912-73-220F 2021(384) | Galveston Houston |
FERRY OPERATION PROJECTSVA · | $15,249,270 | $22,468,330 | SOUTHWEST SHIPYARD, L.P. | +47.3% | 1 |
| Jun 30, 2022 | 0639-02-034F 2022(716) | Madison Bryan |
REHABILITATE RD AND WIDEN SHOULDERSFM 39 · | $11,983,467 | $14,087,278 | BIG CREEK CONSTRUCTION, LTD. | +17.6% | 2 |
| Jun 30, 2022 | 0905-06-118STP 2021(423)MM | Lubbock Lubbock |
CONSTRUCT NEW ROADWAY LANESCS · | $10,587,826 | $12,797,068 | ALLEN BUTLER CONSTRUCTION, INC. | +20.9% | 3 |
| Jun 30, 2022 | 0308-01-013BR 2022(681) | Hansford Amarillo |
BRIDGE REPLACEMENTSH 207 · | $5,536,580 | $7,907,130 | J. LEE MILLIGAN, INC. | +42.8% | 3 |
| Jun 30, 2022 | 0017-13-012F 2022(688) | Atascosa San Antonio |
WIDEN ROAD - ADD LANESSH 132 · | $5,479,624 | $6,628,642 | HUNTER INDUSTRIES, LTD. | +21.0% | 7 |
| Jun 30, 2022 | 1392-01-050C 1392-1-50 | Collin Dallas |
REHABILITATE EXISTING ROADWAYFM 1378 · | $5,236,362 | $6,227,271 | FOUTSCO PAVING COMPANY, LLC | +18.9% | 4 |
| Jun 30, 2022 | 0162-04-057BR 2022(763) | Navarro Dallas |
BRIDGE REPLACEMENTSH 31 · | $5,721,272 | $5,998,923 | MP HEAVY CONSTRUCTION INC | +4.9% | 6 |
| Jun 30, 2022 | 0034-06-014STP 2022(701)HES | Runnels San Angelo |
HAZARD ELIMINATION & SAFETYFM 2887 · | $3,624,249 | $4,777,670 | RELMCO, INC. | +31.8% | 3 |
| Jun 30, 2022 | 1986-01-067F 2022(725) | Montgomery Houston |
SURFACING/ROADWAY RESTORATIONFM 1314 · | $5,001,869 | $4,740,081 | TEXAS MATERIALS GROUP, INC. | -5.2% | 4 |
| Jun 30, 2022 | 0346-06-052BR 2022(719) | Lavaca Yoakum |
BRIDGE REPLACEMENTSH 111 · | $4,336,406 | $4,643,081 | SB CONTRACTORS LLC | +7.1% | 6 |
| Jun 30, 2022 | 6401-93-001RMC - 640193001 | Lamar Paris |
MILL AND INLAYBU 271B · | $3,743,683 | $3,805,754 | RICHARD DRAKE CONSTRUCTION COMPANY, L.P. | +1.7% | 2 |
| Jun 30, 2022 | 0912-31-307BR 2019(421) | Brazoria Houston |
BRIDGE REPLACEMENTCR · | $2,751,922 | $3,440,533 | R CONSTRUCTION CIVIL, LLC | +25.0% | 3 |
| Jun 30, 2022 | 2570-01-011STP 2022(708)HES | Brown Brownwood |
HAZARD ELIMINATION & SAFETYFM 2632 · | $2,849,472 | $3,196,924 | JAY MILLS CONTRACTING, INCORPORATED | +12.2% | 2 |
| Jun 30, 2022 | 6399-86-001RMC - 639986001 | Dallas Dallas |
SWEEPING AND DEBRIS REMOVALUS 175 · | $2,660,611 | $3,040,803 | SWEEPING CORPORATION OF AMERICA, LLC | +14.3% | 1 |
| Jun 30, 2022 | 0902-00-288C 902-00-288 | Tarrant Fort Worth |
TRAFFIC SIGNAL IMPROVEMENTSVA · | $1,995,181 | $2,520,015 | DURABLE SPECIALTIES, INC. | +26.3% | 1 |
| Jun 30, 2022 | 6400-10-001RMC - 640010001 | Dallas Dallas |
SWEEPING AND DEBRIS REMOVALSL 12 · | $1,975,364 | $2,364,578 | SWEEPING CORPORATION OF AMERICA, LLC | +19.7% | 1 |
| Jun 30, 2022 | 6400-67-001RMC - 640067001 | Harris Houston |
ILLUMINATION MAINTENANCEIH 610 · | $2,914,622 | $2,230,105 | LINDSEY ELECTRIC, L.P. | -23.5% | 4 |
| Jun 30, 2022 | 0382-01-047STP 2022(695)HES | Falls Waco |
HAZARD ELIMINATION & SAFETYSH 7 · | $1,840,743 | $2,042,766 | TALBRAN ENTERPRISES LLC | +11.0% | 3 |
| Jun 30, 2022 | 0915-17-072STP 2022(692)HES | Comal San Antonio |
HAZARD ELIMINATION & SAFETYCS · | $1,730,027 | $1,934,817 | E-Z BEL CONSTRUCTION, LLC | +11.8% | 6 |
| Jun 30, 2022 | 2121-06-054C 2121-6-54 | Hudspeth El Paso |
PREVENTIVE MAINTENANCEIH 10 · | $1,519,273 | $1,895,555 | PENHALL COMPANY | +24.8% | 3 |
| Jun 30, 2022 | 0016-08-043STP 2022(685)HES | Bexar San Antonio |
HAZARD ELIMINATION & SAFETYSL 368 · | $1,606,167 | $1,884,493 | E-Z BEL CONSTRUCTION, LLC | +17.3% | 1 |
| Jun 30, 2022 | 2446-01-030STP 2022(717)HES | Brazos Bryan |
HAZARD ELIMINATION & SAFETYSH 30 · | $1,149,545 | $1,790,661 | KNIFE RIVER CORPORATION - SOUTH | +55.8% | 2 |
| Jun 30, 2022 | 0915-12-693STP 2022(691)HESG | Bexar San Antonio |
HAZARD ELIMINATION & SAFETYCR · | $2,005,549 | $1,705,803 | E-Z BEL CONSTRUCTION, LLC | -14.9% | 3 |
| Jun 30, 2022 | 0918-47-398F 2022(766) | Dallas Dallas |
PREVENTIVE MAINTENANCEVA · | $2,472,754 | $1,681,430 | STRIPE-A-ZONE, LLC | -32.0% | 3 |
| Jun 30, 2022 | 6393-42-001RMC - 639342001 | Hopkins Paris |
TRAFFIC CONTROL SERVICESSH 19 · | $915,000 | $1,360,000 | AREA WIDE PROTECTIVE, INC. | +48.6% | 3 |
| Jun 30, 2022 | 0016-01-133STP 2022(640)HES | Travis Austin |
INSTALL TRAFFIC SIGNALSL 275 · | $969,753 | $1,318,917 | LONE STAR SITEWORK, LLC | +36.0% | 3 |
| Jun 30, 2022 | 0508-02-131STP 2022(778)HES | Chambers Beaumont |
HAZARD ELIMINATION & SAFETYIH 10 · | $1,374,196 | $1,285,257 | THIRD COAST SERVICES LLC | -6.5% | 6 |
| Jun 30, 2022 | 6401-97-001BPM - 640197001 | Clay Wichita Falls |
BRIDGE PREVENTATIVE MAINTENANCEUS 82 · | $1,368,967 | $1,243,840 | TALBRAN ENTERPRISES LLC | -9.1% | 6 |
| Jun 30, 2022 | 6393-40-001RMC - 639340001 | Lamar Paris |
TRAFFIC CONTROL SERVICESUS 82 · | $1,095,500 | $1,236,500 | AREA WIDE PROTECTIVE, INC. | +12.9% | 3 |
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.