18,642Let jobs
$76,971,155,782Total low bids
$79,237,330,402Total estimates
-2.9%Low bids vs estimates
All dates results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| May 20, 2025 | 6484-14-001MMC - A00215400 | San Patricio Corpus Christi |
6484-14-001 Hot Mix Sinton MaintUS0181 · Material Maintenance Project | $678,000 | $617,500 | COLORADO MATERIALS, LTD. | -8.9% | 3 |
| May 20, 2025 | 6482-88-001BPM - A00214877 | Nueces Corpus Christi |
6482-88-001 BPM Concrete Struct Rpr.SH0361 · Bridge Preventative Maintenance | $532,755 | $599,978 | TAYLOR BRIDGE LLC | +12.6% | 3 |
| May 20, 2025 | 6483-71-001RMC - A00215279 | Kleberg Corpus Christi |
6483-71-001 Kleberg MowingUS0077 · Routine Maintenance Project - Sealed | $721,023 | $598,631 | ICOS MANAGEMENT, LLC | -17.0% | 4 |
| May 20, 2025 | 6427-68-001BPM - A00192155 | Refugio Corpus Christi |
6427-68-001 Culvert ReplacementFM0774 · Bridge Preventative Maintenance - Sealed | $740,979 | $568,771 | CONSTAR CONSTRUCTION | -23.2% | 7 |
| May 20, 2025 | 6484-38-001MMC - A00215439 | Webb Laredo |
Limestone Rock Asphalt WebbIH0035 · Material Maintenance Project - Sealed | $558,400 | $566,650 | VULCAN CONSTRUCTION MATERIALS, LLC | +1.5% | 2 |
| May 20, 2025 | 6479-59-001MMC - A00213882 | Kleberg Corpus Christi |
6479-59-001 Hot Mix KingsvilleUS0077 · Material Maintenance Project | $484,000 | $415,000 | ANDERSON COLUMBIA CO., INC. | -14.3% | 2 |
| May 20, 2025 | 6478-44-001MMC - A00213350 | Bell Waco |
Hydraulic Cement Concret - Dist. WideUS0190 · Material Maintenance Project | $481,710 | $383,865 | TOUCHSTONE RESOURCES, LLC | -20.3% | 3 |
| May 20, 2025 | 6482-77-001MMC - A00214850 | San Patricio Corpus Christi |
6482-77-001 Aggregate Sinton AreaUS0181 · Material Maintenance Project | $268,000 | $256,000 | BRAUNTEX MATERIALS, INC. | -4.5% | 4 |
| May 20, 2025 | 6484-15-001MMC - A00215401 | Jim Wells Corpus Christi |
6484-15-001 Aggregate Alice AreaUS0281 · Material Maintenance Project | $248,000 | $253,000 | BRAUNTEX MATERIALS, INC. | +2.0% | 5 |
| May 20, 2025 | 6485-72-001SUP - A00216054 | Harrison Atlanta |
Litter Pickup & Disposal South FY 25US0059 · State Use Project | $185,235 | — | 0 | ||
| May 15, 2025 | 6482-58-001MMC - A00214782 | Hale Lubbock |
FY25 Plainview LRAIH0027 · Material Maintenance Project | $775,000 | $779,900 | VULCAN CONSTRUCTION MATERIALS, LLC | +0.6% | 2 |
| May 15, 2025 | 6482-56-001MMC - A00214780 | Terry Lubbock |
FY25 Brownfield LRAUS0062 · Material Maintenance Project | $697,500 | $648,300 | VULCAN CONSTRUCTION MATERIALS, LLC | -7.1% | 2 |
| May 15, 2025 | 6482-61-001MMC - A00214795 | Terry Lubbock |
FY25 Brownfield ASPPMUS0062 · Material Maintenance Project | $525,000 | $556,900 | L A FULLER & SONS CONSTRUCTION, LTD. | +6.1% | 3 |
| May 15, 2025 | 6481-73-001RMC - A00214549 | Hunt Paris |
Debris Removal - Hunt Co.IH0030 · Routine Maintenance Project - Sealed | $449,580 | $458,164 | MERCER TREE SERVICE | +1.9% | 6 |
| May 15, 2025 | 6482-62-001MMC - A00214796 | Lamb Lubbock |
FY25 Littlefield ASPPMUS0084 · Material Maintenance Project | $437,500 | $446,000 | L A FULLER & SONS CONSTRUCTION, LTD. | +1.9% | 3 |
| May 15, 2025 | 6482-63-001MMC - A00214797 | Hale Lubbock |
FY25 Plainview ASPPMIH0027 · Material Maintenance Project | $437,500 | $428,175 | L A FULLER & SONS CONSTRUCTION, LTD. | -2.1% | 3 |
| May 15, 2025 | 6482-59-001MMC - A00214783 | Lubbock Lubbock |
FY25 Lubbock LRAIH0027 · Material Maintenance Project | $310,000 | $295,400 | VULCAN CONSTRUCTION MATERIALS, LLC | -4.7% | 2 |
| May 15, 2025 | 6484-26-001MMC - A00215423 | McCulloch Brownwood |
HOT-MIX MCCULLOCH CO (MATERIALS ONLY)US0377 · Material Maintenance Project | $242,735 | $254,060 | VULCAN CONSTRUCTION MATERIALS, LLC | +4.7% | 2 |
| May 15, 2025 | 6484-24-001MMC - A00215420 | Comanche Brownwood |
LRA COMANCHE COUNTY (MATERIALS ONLY)SH0016 · Material Maintenance Project | $233,626 | $252,801 | MARTIN MARIETTA MATERIALS, INC. | +8.2% | 2 |
| May 15, 2025 | 6484-11-001MMC - A00215392 | Fannin Paris |
LRA - Fannin County FY2025US0069 · Material Maintenance Project - Sealed | $262,500 | $247,575 | MARTIN MARIETTA MATERIALS, INC. | -5.7% | 2 |
| May 15, 2025 | 6484-25-001MMC - A00215422 | Grayson Paris |
LRA - Grayson County FY2025US0075 · Material Maintenance Project - Sealed | $262,500 | $245,070 | MARTIN MARIETTA MATERIALS, INC. | -6.6% | 2 |
| May 15, 2025 | 6484-36-001MMC - A00215437 | Brown Brownwood |
RIPRAP (STONE PROTECTION) (MAT ONLY)US0183 · Material Maintenance Project | $152,668 | $128,000 | TOUCHSTONE RESOURCES, LLC | -16.2% | 5 |
| May 15, 2025 | 6485-69-001SUP - A00216047 | Milam Bryan |
FY 25 Milam County JanitorialSH0036 · State Use Project | $26,902 | — | 0 | ||
| May 15, 2025 | 6485-34-001SUP - A00215934 | Cherokee Tyler |
SUP-J'Ville/Rusk Picnic Area MaintenanceUS0069 · State Use Project | $102,599 | — | 0 | ||
| May 15, 2025 | 6485-36-001SUP - A00215937 | Cherokee Tyler |
SUP - Jacksonville Lawn MaintenanceUS0069 · State Use Project | $13,720 | — | 0 | ||
| May 15, 2025 | 6485-40-001SUP - A00215947 | Cherokee Tyler |
SUP - Rusk Lawn MaintenanceUS0069 · State Use Project | $17,695 | — | 0 | ||
| May 15, 2025 | 6485-42-001SUP - A00215949 | Cherokee Tyler |
SUP-J'Ville/Rusk ROW MaintenanceUS0069 · State Use Project | $18,164 | — | 0 | ||
| May 14, 2025 | 6483-99-001MMC - A00215340 | Childress Childress |
FY25-26 LRA material contractUS0287 · Material Maintenance Project | $993,750 | $962,018 | MARTIN MARIETTA MATERIALS, INC. | -3.2% | 2 |
| May 14, 2025 | 6484-23-001MMC - A00215419 | Childress Childress |
FY25-26 Winter Weather MaterialUS0287 · Material Maintenance Project | $387,800 | $373,739 | UNITED SALT CORPORATION | -3.6% | 2 |
| May 14, 2025 | 6468-25-001RMC - A00210104 | Travis Austin |
FY25 Districtwide Small Sign Maint.US0183 · Routine Maintenance Project - Sealed | $163,270 | $146,974 | DIGG COMMERCIAL, LLC | -10.0% | 2 |
| May 14, 2025 | 6482-29-001RMC - A00214705 | Childress Childress |
CHS District Landscaping maintenanceUS0287 · Routine Maintenance Project | $104,490 | $102,060 | BK FIELD OPERATIONS LLC | -2.3% | 2 |
| May 13, 2025 | 6479-24-001BPM - A00213834 | Waller Houston |
BPM 6479-24 Bridge Deck RepairUS0290 · Bridge Preventative Maintenance - Sealed | $812,450 | $776,700 | ISI CONTRACTING, INC. | -4.4% | 6 |
| May 13, 2025 | 6481-96-001RMC - A00214608 | Smith Tyler |
FY25 - Smith County Tree RemovalUS0069 · Routine Maintenance Project | $647,200 | $596,875 | SPEARHEAD CONSTRUCTION SOLUTIONS LLC | -7.8% | 10 |
| May 13, 2025 | 6472-86-001RMC - A00212070 | Galveston Houston |
FY 2025 GUARDRAIL REPAIRSH0146 · Routine Maintenance Project - Sealed | $536,620 | $421,850 | ROY JORGENSEN ASSOCIATES, INC. | -21.4% | 5 |
| May 13, 2025 | 6485-68-001SUP - A00216042 | Brown Brownwood |
SU LANDSCAPE MAINT-BWD DIST OFC AND COMPUS0183 · State Use Project | $80,125 | — | 0 | ||
| May 12, 2025 | 6483-56-001SUP - A00215141 | Lamar Paris |
Grounds Maintenance - DO FY 25BU0271B · State Use Project | $41,040 | — | 0 | ||
| May 11, 2025 | 6482-21-001SUP - A00214687 | Harris Houston |
6482-21-001 JANITORIAL Southeast HarrisFM1959 · State Use Project | $101,533 | — | 0 | ||
| May 11, 2025 | 6482-06-001SUP - A00214637 | Harris Houston |
6482-06-00Landscape MaintenanceFM1959 · State Use Project | $59,825 | — | 0 | ||
| May 8, 2025 | 6478-34-001RMC - A00213305 | Brown Brownwood |
TRAFFIC SIGNAL MAINTENANCE (CALL-OUT) DWUS0377 · Routine Maintenance Project | $525,106 | $605,183 | WG ENGINEERING & CONSTRUCTION, LLC | +15.2% | 1 |
| May 7, 2025 | 6481-37-001RMC - A00214386 | Navarro Dallas |
Flexible Pavement Str Repair 01 0525SH0031 · Routine Maintenance Project - Sealed | $843,352 | $924,038 | TEXAS MATERIALS GROUP, INC. | +9.6% | 4 |
| May 7, 2025 | 6478-72-001RMC - A00213486 | Collin Dallas |
MBGF 07 0425US0075 · Routine Maintenance Project - Sealed | $986,583 | $596,312 | FIREMAN EXCAVATING, INC. | -39.6% | 4 |
| May 7, 2025 | 6471-16-001RMC - A00211523 | Ellis Dallas |
Cable Barrier Repair 09 0725IH0045 · Routine Maintenance Project - Sealed | $764,700 | $557,450 | FIREMAN EXCAVATING, INC. | -27.1% | 5 |
| May 7, 2025 | 6481-67-001RMC - A00214533 | Ellis Dallas |
Roadside Mowing 09 0525SH0034 · Routine Maintenance Project - Sealed | $525,272 | $336,673 | CEN-TEX IRRIGATION SYSTEMS, INC. | -35.9% | 6 |
| May 7, 2025 | 6471-35-001RMC - A00211542 | Ellis Dallas |
Pavement Markings 09 1224US0077 · Routine Maintenance Project - Sealed | $279,546 | $186,910 | TRP INFRASTRUCTURE SERVICES, LLC | -33.1% | 8 |
| May 7, 2025 | 6481-31-001MMC - A00214367 | Collin Dallas |
LRA FY25/26SH0005 · Material Maintenance Project | $117,500 | $150,510 | MARTIN MARIETTA MATERIALS, INC. | +28.1% | 2 |
| May 7, 2025 | 6475-84-001RMC - A00212642 | Collin Dallas |
Tree Trimming and Brush Removal 07 0225US0075 · Routine Maintenance Project - Sealed | $97,446 | $79,789 | ICOS MANAGEMENT, LLC | -18.1% | 7 |
| May 7, 2025 | 6481-27-001MMC - A00214357 | Collin Dallas |
Cutback RC250 FY26SH0005 · Material Maintenance Project | $50,400 | $41,760 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | -17.1% | 2 |
| May 6, 2025 | 6482-99-001RMC - A00214912 | Washington Bryan |
FY26 - Brenham AO Spot MillSH0036 · Routine Maintenance Project - Sealed | $788,450 | $733,533 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | -7.0% | 4 |
| May 6, 2025 | 6479-82-001BPM - A00213949 | Freestone Bryan |
FY25 - Freestone IH 45 BPM - 05IH0045 · Bridge Preventative Maintenance - Sealed | $747,777 | $422,313 | BK FIELD OPERATIONS LLC | -43.5% | 12 |
| May 6, 2025 | 6464-83-001BPM - A00207878 | Gonzales Yoakum |
BPM Erosion Repairs FY 25SH0097 · Bridge Preventative Maintenance - Sealed | $577,410 | $388,629 | BK FIELD OPERATIONS LLC | -32.7% | 5 |
| May 6, 2025 | 6482-84-001MMC - A00214869 | Walker Bryan |
FY25 Huntsville AO RC-250 - 05IH0045 · Material Maintenance Project | $128,000 | $111,360 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | -13.0% | 2 |
| May 6, 2025 | 6482-83-001MMC - A00214868 | Brazos Bryan |
FY25 Bryan AO RC-250 - 05SH0006 · Material Maintenance Project | $96,000 | $83,520 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | -13.0% | 2 |
| May 6, 2025 | 6485-26-001SUP - A00215908 | Brown Brownwood |
SU PICNIC- BROWN COUNTY 2026US0183 · State Use Project | $127,449 | — | 0 | ||
| May 6, 2025 | 6485-32-001SUP - A00215930 | Comanche Brownwood |
SU PICNIC- COMANCHE CO-2026US0067 · State Use Project | $60,855 | — | 0 | ||
| May 6, 2025 | 6485-38-001SUP - A00215942 | Eastland Brownwood |
SU PICNIC- EASTLAND CO 2026IH0020 · State Use Project | $199,792 | — | 0 | ||
| May 6, 2025 | 6485-39-001SUP - A00215944 | Mills Brownwood |
SU PICNIC- MILLS COUNTY 2026US0183 · State Use Project | $47,570 | — | 0 | ||
| May 5, 2025 | 6478-68-001MMC - A00213448 | Culberson El Paso |
Flexible BaseIH0010 · Material Maintenance Project | $206,810 | $175,750 | SOUTHERN SOURCING SOLUTIONS, LLC | -15.0% | 3 |
| May 5, 2025 | 6478-67-001RMC - A00213442 | Brewster El Paso |
AAO Picnic Area MaintenanceUS0090 · Routine Maintenance Project | $81,400 | $77,278 | C&C SOSA COMPANY, LLC | -5.1% | 1 |
| May 2, 2025 | 0665-02-004F 2025(697) | El Paso El Paso |
Borderland Expressway PH II (FM3255|RR)SS 320 · Widen Non-Freeway | $139,660,521 | $112,560,911 | DAN WILLIAMS COMPANY | -19.4% | 4 |
| May 2, 2025 | 0648-01-036F 2025(362) | Robertson Bryan |
FM 50 F: US 79 T: Brazos CL - RER FY 25FM 50 · Rehabilitation of Existing Road | $29,250,178 | $20,558,088 | BIG CREEK CONSTRUCTION, LTD. | -29.7% | 6 |
| May 2, 2025 | 1014-01-013C 1014-1-13 | Collin Dallas |
FM 547 FROM US 380 TO FM 6FM 547 · Rehabilitation of Existing Road | $22,962,770 | $16,422,403 | A. K. GILLIS & SONS, LLC | -28.5% | 8 |
| May 2, 2025 | 0181-01-069C 181-1-69 | Taylor Abilene |
SH 36 SUPER 2 CR 123 TO CALLAHAN COUNTYSH 36 · Super-2 Highway | $13,524,800 | $10,612,471 | A. L. HELMCAMP, INC. | -21.5% | 8 |
| May 2, 2025 | 0542-06-050C 542-6-50 | Live Oak Corpus Christi |
US 59 LiveOak lagarto-FM 1359 OVUS 59 · Overlay | $11,218,554 | $8,329,533 | LONE STAR PAVING COMPANY | -25.8% | 5 |
| May 2, 2025 | 0918-47-234BR 2B24(326) | Dallas Dallas |
CS FROM BELT LINE ROAD AT GOFF BRANCH TOS BELTLINE RD · Bridge Replacement | $7,689,301 | $8,168,666 | HIGHWAY 19 CONSTRUCTION LLC | +6.2% | 6 |
| May 2, 2025 | 0718-02-076CM 2023(865) | Tarrant Fort Worth |
FM 156; at Industrial BlvdFM 156 · Intersection & Operational Imprv | $6,000,822 | $6,426,835 | GREY SKY CONSTRUCTION LLC | +7.1% | 7 |
| May 2, 2025 | 0187-02-073C 187-2-73 | Austin Yoakum |
REHABILITATE ROADWAY 2701-2SH 36 · Rehabilitation of Existing Road | $6,997,407 | $6,157,668 | TEXAS MATERIALS GROUP, INC. | -12.0% | 5 |
| May 2, 2025 | 0836-02-079STP 2025(770)HES | Bell Waco |
HSIP | SH 195 | .7S FM2670 -WilliamsonSH 195 · Safety Improvement Projects | $6,524,882 | $4,930,555 | BIG CREEK CONSTRUCTION, LTD. | -24.4% | 7 |
| May 2, 2025 | 0403-01-050BR 2025(725) | San Jacinto Lufkin |
SH 156 SB_STEPHENS CREEK - BSSPSH 156 · Bridge Replacement | $4,449,295 | $4,304,421 | SKYLINE BRIDGE LLC | -3.3% | 8 |
| May 2, 2025 | 0173-07-062STP 2025(724)HES | Hunt Paris |
SH 34 - 1SH 34 · Safety Improvement Projects | $4,309,128 | $4,125,934 | BAKER & COMPANY CONSTRUCTION, LLC | -4.3% | 6 |
| May 2, 2025 | 2325-01-017C 2325-1-17 | Montgomery Houston |
FM 2432, SH 75 to FM 1484FM 2432 · Overlay | $4,988,014 | $4,090,557 | VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC | -18.0% | 5 |
| May 2, 2025 | 0379-01-050F 2025(753) | Hutchinson Amarillo |
SH 136 Ped Improvement - FritchSH 136 · Pedestrian, Sidewalks & Curb Ramps | $3,654,451 | $3,406,939 | WESTFIELD INSURANCE COMPANY | -6.8% | 6 |
| May 2, 2025 | 0580-01-039STP 2025(727)HRR | Calhoun Yoakum |
SH 316 REHABILITATE ROADWAY HSIP 2505SH 316 · Safety Improvement Projects | $3,189,958 | $3,141,248 | LCR TOTAL TRANSPORT LLC | -1.5% | 4 |
| May 2, 2025 | 0581-01-182STP 2025(541)MM | Dallas Dallas |
SL 12 From S of John West to TillmanSL 12 · Traffic Control Devices | $3,518,014 | $3,099,433 | SELECT MAINTENANCE, L.L.C. | -11.9% | 5 |
| May 2, 2025 | 0910-00-147BR 2025(709) | Smith Tyler |
FY 27 RR Bridges @ Various LocationsVarious · Bridge Widening or Rehabilitation | $3,032,844 | $2,796,332 | BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC | -7.8% | 5 |
| May 2, 2025 | 2552-01-064F 2025(768) | El Paso El Paso |
SL375 SAFETY (IH10 | E OF US54)SL 375 · Safety Improvement Projects | $2,097,644 | $2,780,754 | INTERNATIONAL EAGLE ENTERPRISES, INC. | +32.6% | 2 |
| May 2, 2025 | 0167-02-083STP 2025(711)VRU | El Paso El Paso |
ELP_BU0054A_2-TARBU 54A · Safety Improvement Projects | $2,631,304 | $2,664,962 | TRI STATE ELECTRIC, LTD. | +1.3% | 2 |
| May 2, 2025 | 0921-02-549F 2025(784) | Hidalgo Pharr |
Hidalgo Ctny-Various-Striping ProjectsVarious · Traffic Control Devices | $2,983,525 | $2,409,725 | HIGHWAY BARRICADES AND SERVICES, LLC | -19.2% | 3 |
| May 2, 2025 | 0909-00-098C 909-00-98 | McLennan Waco |
PE | Districtwide Striping ProjectVarious · Traffic Control Devices | $2,495,773 | $2,298,505 | CENTERLINE TECHNOLOGIES, LLC | -7.9% | 11 |
| May 2, 2025 | 0914-00-514F 2025(754) | Travis Austin |
FY 2025 Site Specific SignalsVarious · Traffic Control Devices | $2,764,605 | $2,265,741 | E-Z BEL CONSTRUCTION, LLC | -18.0% | 5 |
| May 2, 2025 | 0909-38-095BR 2023(430) | Falls Waco |
BR | CR 162 | FCR 245 @Hogpen CreekCOUNTY ROAD 162 · Bridge Replacement | $2,828,069 | $2,238,703 | A. L. HELMCAMP, INC. | -20.8% | 8 |
| May 2, 2025 | 0920-00-171F 2025(792) | Jefferson Beaumont |
TRUCK PARKING (FY 25)Various · Transportation Non-Roadway | $2,634,302 | $1,999,855 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | -24.1% | 3 |
| May 2, 2025 | 6478-87-001RMC - A00213666 | Hunt Paris |
On Call TY I & Specialty Striping-SouthIH0030 · Routine Maintenance Project - Sealed | $2,024,044 | $1,794,779 | STRIPING TECHNOLOGY, L.P. | -11.3% | 5 |
| May 2, 2025 | 0480-02-029STP 2025(706)HES | Brown Brownwood |
SH 279_2of2 PR15 to Shamrock Dr.SH 279 · Safety Improvement Projects | $3,138,628 | $1,732,353 | SCOUT 5 CONSTRUCTION LLC | -44.8% | 8 |
| May 2, 2025 | 1837-01-016F 2025(764) | Archer Wichita Falls |
FM 1954; FM 2650 to SH 79FM 1954 · Overlay | $1,935,196 | $1,712,102 | ZACK BURKETT CO. | -11.5% | 6 |
| May 2, 2025 | 6478-38-001MMC - A00213309 | Lamar Paris |
Flex Base & Asph Trtmt - Paris DistrictUS0082 · Material Maintenance Project - Sealed | $1,589,750 | $1,628,050 | RK HALL, LLC | +2.4% | 2 |
| May 2, 2025 | 6478-80-001RMC - A00213622 | El Paso El Paso |
Metal Beam Guardrail Fence Repair -WestIH0010 · Routine Maintenance Project - Sealed | $1,290,562 | $1,603,475 | APACHE BARRICADE & SIGN | +24.2% | 1 |
| May 2, 2025 | 0739-02-181STP 2025(728)HES | Jefferson Beaumont |
BMT_IH0010_2(2021 HSIP)SAFETY LIGHTINGIH 10 · Safety Improvement Projects | $1,387,771 | $1,596,374 | SICE, INC. | +15.0% | 7 |
| May 2, 2025 | 0915-00-272F 2025(733) | Bexar San Antonio |
VA: 0915-00-272; TCDVarious · Traffic Control Devices | $1,499,305 | $1,477,083 | E-Z BEL CONSTRUCTION, LLC | -1.5% | 4 |
| May 2, 2025 | 6473-51-001RMC - A00212223 | McLennan Waco |
Pavement Markings (SS) - DistrictwideSH0317 · Routine Maintenance Project - Sealed | $2,181,075 | $1,416,896 | THE CONFIDENCE GROUP, INC | -35.0% | 6 |
| May 2, 2025 | 6483-01-001RMC - A00214914 | Walker Bryan |
FY26 - Huntsville AO Spot MillIH0045 · Routine Maintenance Project - Sealed | $1,311,700 | $1,349,975 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | +2.9% | 5 |
| May 2, 2025 | 0906-32-064STP 2024(995)VRU | Midland Odessa |
SAFETY_MIDLAND_TEXAS_AVE_A_ST_C_STTEXAS AVE · Safety Improvement Projects | $1,487,853 | $1,295,425 | O. TREVINO CONSTRUCTION, LLC | -12.9% | 6 |
| May 2, 2025 | 6482-71-001MMC - A00214840 | Randall Amarillo |
FY 26 Amarillo District Paint & BeadsIH0027 · Material Maintenance Project | $1,396,625 | $1,259,250 | ENNIS-FLINT, INC. | -9.8% | 4 |
| May 2, 2025 | 6471-33-001RMC - A00211540 | Ellis Dallas |
Flexible Pvmt. Structure Repair 09 1024BI0045J · Routine Maintenance Project - Sealed | $1,152,692 | $1,004,908 | PEACHTREE CONSTRUCTION, LTD. | -12.8% | 5 |
| May 2, 2025 | 0114-09-099F 2025(699) | Washington Bryan |
US 290 R-Cuts West Washington - FY 25US 290 · Intersection & Operational Imprv | $1,325,224 | $965,907 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | -27.1% | 7 |
| May 2, 2025 | 0914-00-557C 914-00-557 | Travis Austin |
FY 2025 BTAO BR FUA RepairsVarious · Bridge Maintenance | $1,641,284 | $865,709 | STRUCTURAL INTEGRITY GROUP LLC | -47.3% | 6 |
| May 2, 2025 | 0917-00-069C 917-00-69 | Brazos Bryan |
FY 25 - DW Bridge RepairVarious · Bridge Maintenance | $550,286 | $590,567 | PREMIER CONTRACTORS LLC | +7.3% | 6 |
| May 2, 2025 | 0102-01-126STP 2025(775)HES | Nueces Corpus Christi |
CRP_SH0044_1_Nueces_HSIPSH 44 · Safety Improvement Projects | $533,198 | $419,930 | THIRD COAST SERVICES LLC | -21.2% | 6 |
| May 1, 2025 | 0052-01-043C 52-1-43 | Parmer Lubbock |
OV-US 70 Farwell to Bailey CCSJUS 70 · Overlay | $28,903,376 | $29,652,485 | A. L. HELMCAMP, INC. | +2.6% | 8 |
| May 1, 2025 | 2060-01-039STP 2025(769)HES | McLennan Waco |
RER | 2601 | FM 2113 | FM 2416 - FM 1695FM 2113 · Rehabilitation of Existing Road | $15,103,012 | $10,809,104 | BIG CREEK CONSTRUCTION, LTD. | -28.4% | 3 |
| May 1, 2025 | 0521-05-151C 521-5-151 | Bexar San Antonio |
IH 410: 0521-05-151; OVIH 410 · Overlay | $12,327,581 | $9,693,874 | TEXAS MATERIALS GROUP, INC. | -21.4% | 6 |
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.