Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Apr 7, 2026 | 0016-08-049F 2026(535) | Bexar San Antonio |
SL 368: 0016-08-049; OVSL 368 · Overlay | $4,814,214 | $3,947,711 | CLARK CONSTRUCTION OF TEXAS, INC. | -18.0% | 6 |
| Apr 7, 2026 | 6499-43-001MMC - A00220299 | Smith Tyler |
SMITH CO HOT MIX ASPHALTUS0069 · Material Maintenance Project | $3,173,000 | $3,196,200 | TEXAS MATERIALS GROUP, INC. | +0.7% | 2 |
| Apr 7, 2026 | 0908-23-045BR 1902(361) | Fisher Abilene |
CR 412 AT COTTONWOOD CRK TRIBCOUNTY ROAD 412 · Bridge Replacement | $4,574,023 | $3,158,064 | SKYLINE BRIDGE LLC | -31.0% | 6 |
| Apr 7, 2026 | 0079-05-067BR 2026(489) | Erath Fort Worth |
US 67/US 377 at Bosque RiverUS 67 · Bridge Maintenance | $4,188,151 | $2,983,533 | BLACKSMITH VENTURES LLC | -28.8% | 6 |
| Apr 7, 2026 | 0269-10-028STP 2026(495)HES | Lavaca Yoakum |
FM 531 SAFETY IMPROVEMENT 2606FM 531 · Safety Improvement Projects | $2,177,688 | $2,566,089 | HUNTER INDUSTRIES, LTD. | +17.8% | 3 |
| Apr 7, 2026 | 0091-06-062STP 2026(473)HES | Dallas Dallas |
SH 289 from SL 12 to McCallumSH 289 · Safety Improvement Projects | $2,836,917 | $2,525,603 | SELECT MAINTENANCE, L.L.C. | -11.0% | 9 |
| Apr 7, 2026 | 0337-02-054F 2026(519) | Williamson Austin |
SH 29 - FM 1660 to SH 95SH 29 · Overlay | $2,566,159 | $2,388,456 | LONE STAR PAVING COMPANY | -6.9% | 4 |
| Apr 7, 2026 | 1014-03-065F 2026(478) | Rockwall Dallas |
FM 550 at Rabbit Ridge in RockwallFM 550 · Traffic Control Devices | $2,169,620 | $2,341,217 | O. TREVINO CONSTRUCTION, LLC | +7.9% | 8 |
| Apr 7, 2026 | 0910-00-144F 2026(534) | Smith Tyler |
2026 BRIDGE PREVENTATIVE MAINTENANCEVarious · Bridge Maintenance | $3,297,937 | $1,987,427 | THK CONSTRUCTION LLC | -39.7% | 11 |
| Apr 7, 2026 | 1062-04-063F 2026(483) | Harris Houston |
FM 2100: San Jacinto Canal to BU 90UFM 2100 · Overlay | $1,578,950 | $1,798,696 | FORDE CONSTRUCTION COMPANY, INC. | +13.9% | 4 |
| Apr 7, 2026 | 0218-05-037F 2026(610) | Cass Atlanta |
SH 11 from US 59 to FM 130SH 11 · Safety Improvement Projects | $2,530,848 | $1,793,826 | SKYLINE BRIDGE LLC | -29.1% | 10 |
| Apr 7, 2026 | 0986-03-015F 2026(520) | Williamson Austin |
FM 619 from FM 1331 to US 79FM 619 · Seal Coat | $1,713,955 | $1,567,487 | LONE STAR PAVING COMPANY | -8.5% | 4 |
| Apr 7, 2026 | 0922-48-004BR 2B23(188) | Zavala Laredo |
LA PALOMA RD AT GALLINA SLOUGHLA PALOMA · Bridge Replacement | $1,631,537 | $1,523,016 | ACEE CONSTRUCTION LLC. | -6.7% | 5 |
| Apr 7, 2026 | 3538-01-070F 2026(486) | Montgomery Houston |
SH 242: IH 45 to IH 69, landscapeSH 242 · Landscape & Scenic Enhancement | $2,075,081 | $1,514,369 | TIGHT LINE CONSTRUCTION, LLC | -27.0% | 7 |
| Apr 7, 2026 | 6497-78-001RMC - A00219796 | Hidalgo Pharr |
Sweeping and Debris Removal (Expwy) FY26IH0002 · Routine Maintenance Project - Sealed | $1,303,042 | $1,294,158 | SWEEPING CORPORATION OF AMERICA, LLC | -0.7% | 1 |
| Apr 7, 2026 | 0921-02-551F 2026(408) | Hidalgo Pharr |
Various - Sign & StripingVarious · Rail Hwy Crossing Signals/Structures | $1,682,282 | $1,133,354 | CENTERLINE TECHNOLOGIES, LLC | -32.6% | 2 |
| Apr 7, 2026 | 6498-60-001RMC - A00220029 | Bastrop Austin |
FY 26 Striping Bastrop AEFM0535 · Routine Maintenance Project - Sealed | $1,575,809 | $1,057,585 | STRIPE-A-ZONE, LLC | -32.9% | 5 |
| Apr 7, 2026 | 0909-38-100BR 2023(431) | Falls Waco |
BR | CR 325 | FCR 461 @ Hog CreekCOUNTY ROAD 325 · Bridge Replacement | $1,388,814 | $1,047,281 | BLACKSMITH VENTURES LLC | -24.6% | 12 |
| Apr 7, 2026 | 0917-19-062BR 2023(331) | Washington Bryan |
CR 830 AT EAST FORK OF MILL CREEK - BRARTESIAN PARK RD · Bridge Replacement | $800,383 | $732,054 | GARRET SHIELDS INFRASTRUCTURE | -8.5% | 9 |
| Apr 7, 2026 | 0314-07-087F 2026(491) | Parker Fort Worth |
IH 20 from Ric Williams Hwy to SH171IH 20 · Traffic Control Devices | $537,434 | $434,829 | HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC | -19.1% | 5 |
| Apr 7, 2026 | 0916-35-264STP 2026(541)FRS | Nueces Corpus Christi |
RR Xing CC Area Office 2026Various · Rail Hwy Crossing Signals/Structures | $412,873 | $399,442 | CENTERLINE TECHNOLOGIES, LLC | -3.3% | 3 |
| Apr 7, 2026 | 1006-01-082F 2B25(342) | Harris Houston |
FM 529: At Horsepen CreekFM 529 · Transportation Non-Roadway | $468,119 | $383,467 | GARRET SHIELDS INFRASTRUCTURE | -18.1% | 6 |
| Apr 7, 2026 | 0009-11-278BR 2026(477) | Dallas Dallas |
IH 30 at Hunnicut Rd in Dallas CountyIH 30 · Bridge Maintenance | $509,990 | $319,026 | ROAD DOCTORS LLC | -37.4% | 12 |
| Apr 6, 2026 | 6497-92-001MMC - A00219843 | Bowie Atlanta |
Emulsion District Wide FY 26US0059 · Material Maintenance Project | $697,500 | $669,900 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | -4.0% | 2 |
| Apr 6, 2026 | 6498-26-001RMC - A00219974 | Calhoun Yoakum |
ACP VAOFM1090 · Routine Maintenance Project - Sealed | $599,961 | $648,273 | HUNTER INDUSTRIES, LTD. | +8.1% | 1 |
| Apr 6, 2026 | 6500-16-001BPM - A00220686 | Victoria Yoakum |
Bridge Joint Repair - FY 27US0059 · Bridge Preventative Maintenance - Sealed | $567,500 | $547,152 | ISI CONTRACTING, INC. | -3.6% | 5 |
| Apr 6, 2026 | 6500-47-001SUP - A00220792 | Bowie Atlanta |
Texarkana Janitorial Services FY 26IH0369 · State Use Project | $22,392 | — | 0 | ||
| Apr 1, 2026 | 6500-49-001SUP - A00220794 | Bowie Atlanta |
Texarkana Grounds Maintenance FY 26IH0369 · State Use Project | $17,009 | — | 0 | ||
| Mar 31, 2026 | 6495-86-001BPM - A00218966 | Hidalgo Pharr |
FY26 BPM (Structural/Erosion)IH0002 · Bridge Preventative Maintenance - Sealed | $582,161 | $1,026,749 | TAYLOR BRIDGE LLC | +76.4% | 1 |
| Mar 31, 2026 | 6496-01-001RMC - A00219077 | Austin Yoakum |
Janitorial Austin CountyFM2187 · Routine Maintenance Project | $11,700 | $10,780 | TEXAS CUTTERS | -7.9% | 4 |
| Mar 31, 2026 | 6496-88-001SUP - A00219481 | Dallas Dallas |
Dallas District Grounds Maintenance FY26US0080 · State Use Project | $131,346 | — | 0 | ||
| Mar 26, 2026 | 6497-93-001RMC - A00219846 | Taylor Abilene |
2026 Debris RemovalIH0020 · Routine Maintenance Project - Sealed | $718,320 | $624,648 | VIZCAINO, L.P. | -13.0% | 4 |
| Mar 26, 2026 | 6481-65-001RMC - A00214505 | Kimble San Angelo |
PAVEMENT MARKINGS SOUTH FY 26US0377 · Routine Maintenance Project - Sealed | $326,465 | $199,196 | L&L COMPANY | -39.0% | 5 |
| Mar 24, 2026 | 6494-74-001MMC - A00218644 | Fayette Yoakum |
Hot Mix - Fayette (Materials Only)US0077 · Material Maintenance Project | $975,000 | $1,036,750 | TEXAS MATERIALS GROUP, INC. | +6.3% | 5 |
| Mar 24, 2026 | 6482-57-001MMC - A00214781 | Lubbock Lubbock |
FY26 Districtwide Hot MixIH0027 · Material Maintenance Project | $903,500 | $994,500 | DUININCK, INC. | +10.1% | 1 |
| Mar 24, 2026 | 6494-69-001MMC - A00218638 | Lavaca Yoakum |
Hot Mix - Lavaca (Materials Only)US0077 · Material Maintenance Project | $977,500 | $943,000 | BRAUNTEX MATERIALS, INC. | -3.5% | 5 |
| Mar 24, 2026 | 6494-68-001MMC - A00218636 | De Witt Yoakum |
Hot Mix - DeWitt (Materials Only)US0183 · Material Maintenance Project | $984,000 | $936,000 | BRAUNTEX MATERIALS, INC. | -4.9% | 4 |
| Mar 24, 2026 | 6494-72-001MMC - A00218642 | Gonzales Yoakum |
Hot Mix - Gonzales (Materials Only)US0183 · Material Maintenance Project | $977,500 | $862,500 | BRAUNTEX MATERIALS, INC. | -11.8% | 4 |
| Mar 24, 2026 | 6498-44-001MMC - A00220010 | Runnels San Angelo |
LRA CS-DS FY26US0067 · Material Maintenance Project | $602,323 | $558,123 | VULCAN CONSTRUCTION MATERIALS, LLC | -7.3% | 2 |
| Mar 24, 2026 | 6494-67-001MMC - A00218634 | Fayette Yoakum |
Aggregate - YAO (Materials Only)US0077 · Material Maintenance Project | $579,800 | $552,000 | BRAUNTEX MATERIALS, INC. | -4.8% | 5 |
| Mar 24, 2026 | 6498-45-001MMC - A00220011 | Reagan San Angelo |
Emulsion-Cationic FY26US0067 · Material Maintenance Project | $560,481 | $514,140 | ERGON ASPHALT & EMULSIONS, INC. | -8.3% | 2 |
| Mar 24, 2026 | 6494-54-001MMC - A00218616 | Fayette Yoakum |
Asphalts/Oils/Emul-YAO (Materials Only)US0077 · Material Maintenance Project | $435,000 | $498,447 | MARTIN RESOURCE MANAGEMENT CORPORATION | +14.6% | 3 |
| Mar 24, 2026 | 6494-75-001MMC - A00218645 | Fayette Yoakum |
Hot Mix CL - Fayette (Materials Only)US0077 · Material Maintenance Project | $450,000 | $436,250 | TEXAS MATERIALS GROUP, INC. | -3.1% | 5 |
| Mar 24, 2026 | 6494-71-001MMC - A00218641 | Lavaca Yoakum |
Hot Mix CL - Lavaca (Materials Only)US0077 · Material Maintenance Project | $450,000 | $430,000 | TEXAS MATERIALS GROUP, INC. | -4.4% | 5 |
| Mar 24, 2026 | 6494-73-001MMC - A00218643 | Gonzales Yoakum |
Hot Mix CL - Gonzales (Materials Only)US0183 · Material Maintenance Project | $400,000 | $405,000 | BRAUNTEX MATERIALS, INC. | +1.3% | 4 |
| Mar 24, 2026 | 6499-17-001MMC - A00220176 | Terry Lubbock |
FY26 Brownfield EmulsionUS0062 · Material Maintenance Project | $300,900 | $337,200 | ERGON ASPHALT & EMULSIONS, INC. | +12.1% | 2 |
| Mar 24, 2026 | 6499-20-001MMC - A00220179 | Hale Lubbock |
FY26 Plainview EmulsionIH0027 · Material Maintenance Project | $252,000 | $281,000 | ERGON ASPHALT & EMULSIONS, INC. | +11.5% | 2 |
| Mar 24, 2026 | 6494-63-001MMC - A00218630 | Fayette Yoakum |
Flexbase - YAO (Materials Only)US0077 · Material Maintenance Project | $307,500 | $278,750 | QUALITY HOT MIX, INC. | -9.3% | 4 |
| Mar 24, 2026 | 6494-66-001MMC - A00218633 | Fayette Yoakum |
LRA - Fayette County (Materials Only)US0077 · Material Maintenance Project | $244,000 | $245,040 | VULCAN CONSTRUCTION MATERIALS, LLC | +0.4% | 2 |
| Mar 24, 2026 | 6499-23-001MMC - A00220182 | Lamb Lubbock |
FY26 Districtwide CutbackUS0084 · Material Maintenance Project | $189,000 | $224,100 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | +18.6% | 2 |
| Mar 24, 2026 | 6499-19-001MMC - A00220178 | Lamb Lubbock |
FY26 Littlefield EmulsionUS0084 · Material Maintenance Project | $202,250 | $221,250 | ERGON ASPHALT & EMULSIONS, INC. | +9.4% | 2 |
| Mar 24, 2026 | 6498-46-001MMC - A00220013 | Lampasas Brownwood |
HOT-MIX (MAT ONLY) LAMP COUNTYUS0281 · Material Maintenance Project | $388,000 | $193,750 | BIG CREEK CONSTRUCTION, LTD. | -50.1% | 3 |
| Mar 24, 2026 | 6499-21-001MMC - A00220180 | Lubbock Lubbock |
FY26 Lubbock EmulsionIH0027 · Material Maintenance Project | $114,950 | $128,200 | ERGON ASPHALT & EMULSIONS, INC. | +11.5% | 2 |
| Mar 24, 2026 | 6494-62-001MMC - A00218629 | Fayette Yoakum |
Rock/Riprap - YAO (Materials Only)US0077 · Material Maintenance Project | $119,000 | $101,850 | TOUCHSTONE RESOURCES, LLC | -14.4% | 3 |
| Mar 24, 2026 | 6480-65-001RMC - A00214227 | Tom Green San Angelo |
PAVEMENT MARKINGS NORTH FY 26SH0208 · Routine Maintenance Project - Sealed | $128,450 | $77,856 | FLAT LINE, INC. | -39.4% | 6 |
| Mar 24, 2026 | 6495-29-001MMC - A00218719 | Fayette Yoakum |
Hydraulic Cement - YAO (Materials Only)US0077 · Material Maintenance Project | $54,922 | $51,030 | TOUCHSTONE RESOURCES, LLC | -7.1% | 2 |
| Mar 24, 2026 | 6494-65-001MMC - A00218632 | Fayette Yoakum |
Lime - YAO (Materials Only)US0077 · Material Maintenance Project | $26,250 | $25,725 | TEXAS LIME COMPANY | -2.0% | 2 |
| Mar 24, 2026 | 6499-58-001SUP - A00220400 | Red River Paris |
JANITORIAL MAINTENANCE RR - FY26US0082 · State Use Project | $9,993 | — | 0 | ||
| Mar 24, 2026 | 6499-59-001SUP - A00220402 | Delta Paris |
Grounds Maintenance - FY26SH0019 · State Use Project | $7,740 | — | 0 | ||
| Mar 24, 2026 | 6500-44-001SUP - A00220786 | Cass Atlanta |
Linden Janitorial Services FY 26SH0008 · State Use Project | $9,276 | — | 0 | ||
| Mar 24, 2026 | 6500-65-001SUP - A00220867 | Nueces Corpus Christi |
6500-65-001 E. Nueces JanitorialSH0358 · State Use Project | $24,574 | — | 0 | ||
| Mar 19, 2026 | 6498-53-001MMC - A00220020 | Grayson Paris |
Asphalt Oil & Emulsion - Grayson FY26US0075 · Material Maintenance Project - Sealed | $728,223 | $844,950 | ERGON ASPHALT & EMULSIONS, INC. | +16.0% | 1 |
| Mar 19, 2026 | 6498-67-001MMC - A00220037 | Red River Paris |
Asphalt Oil & Emulsion - Red River FY26SH0037 · Material Maintenance Project - Sealed | $545,600 | $632,350 | ERGON ASPHALT & EMULSIONS, INC. | +15.9% | 1 |
| Mar 19, 2026 | 6498-65-001MMC - A00220035 | Delta Paris |
Asphalt Oil & Emulsion - Delta FY26SH0154 · Material Maintenance Project - Sealed | $549,800 | $601,690 | ERGON ASPHALT & EMULSIONS, INC. | +9.4% | 1 |
| Mar 19, 2026 | 6498-54-001MMC - A00220021 | Lamar Paris |
Asphalt Oil & Emulsion - Lamar FY26US0271 · Material Maintenance Project - Sealed | $348,250 | $429,300 | ERGON ASPHALT & EMULSIONS, INC. | +23.3% | 1 |
| Mar 19, 2026 | 6493-79-001BPM - A00218400 | Hunt Paris |
BPM Hunt #2 FY26IH0030 · Bridge Preventative Maintenance - Sealed | $321,375 | $394,150 | BLACKSMITH VENTURES LLC | +22.6% | 4 |
| Mar 19, 2026 | 6498-69-001MMC - A00220042 | Hopkins Paris |
Asphalt Oil & Emulsion - Hopkins FY26IH0030 · Material Maintenance Project - Sealed | $273,500 | $319,550 | ERGON ASPHALT & EMULSIONS, INC. | +16.8% | 1 |
| Mar 19, 2026 | 6498-70-001MMC - A00220043 | Hunt Paris |
Asphalt Oil & Emulsion - Hunt FY26IH0030 · Material Maintenance Project - Sealed | $292,500 | $319,550 | ERGON ASPHALT & EMULSIONS, INC. | +9.2% | 1 |
| Mar 19, 2026 | 6498-71-001MMC - A00220044 | Rains Paris |
Asphalt Oil & Emulsion - Rains FY26US0069 · Material Maintenance Project - Sealed | $281,300 | $306,350 | ERGON ASPHALT & EMULSIONS, INC. | +8.9% | 1 |
| Mar 19, 2026 | 6495-21-001RMC - A00218709 | Cooke Wichita Falls |
COOKE MOWING FY26-27IH0035 · Routine Maintenance Project | $313,675 | $289,370 | ANTHONY SERVICES | -7.7% | 3 |
| Mar 19, 2026 | 6495-20-001RMC - A00218708 | Clay Wichita Falls |
CLAY MOWING FY26-27US0287 · Routine Maintenance Project | $319,344 | $287,415 | BIG STATE MAINTENANCE, INC. | -10.0% | 3 |
| Mar 19, 2026 | 6495-25-001RMC - A00218713 | Wilbarger Wichita Falls |
WILBARGER COUNTY Mowing FY26-27US0287 · Routine Maintenance Project | $282,958 | $267,941 | ABESCAPE GROUP LLC | -5.3% | 2 |
| Mar 19, 2026 | 6494-31-001RMC - A00218582 | Red River Paris |
On Call Tree Removal Red River Co.US0082 · Routine Maintenance Project - Sealed | $235,650 | $250,350 | MERCER TREE SERVICE | +6.2% | 4 |
| Mar 19, 2026 | 6496-41-001RMC - A00219346 | Grayson Paris |
On Call Ditch and Culvert-SAOUS0075 · Routine Maintenance Project - Sealed | $303,900 | $224,885 | TEXAS DRAINAGE INC. | -26.0% | 3 |
| Mar 19, 2026 | 6495-19-001RMC - A00218707 | Baylor Wichita Falls |
BAYLOR MOWING FY26-27US0082 · Routine Maintenance Project | $216,698 | $186,188 | ABESCAPE GROUP LLC | -14.1% | 4 |
| Mar 19, 2026 | 6495-23-001RMC - A00218711 | Throckmorton Wichita Falls |
THROCKMORTON Mowing FY26-27US0183 · Routine Maintenance Project | $126,547 | $102,930 | ABESCAPE GROUP LLC | -18.7% | 3 |
| Mar 19, 2026 | 6499-66-001SUP - A00220447 | Taylor Abilene |
FY 26 Taylor Co JanitorialFM3438 · State Use Project | $19,402 | — | 0 | ||
| Mar 19, 2026 | 6499-67-001SUP - A00220449 | Shackelford Abilene |
FY 26 Shackelford Co. JanitorialUS0283 · State Use Project | $12,273 | — | 0 | ||
| Mar 19, 2026 | 6499-68-001SUP - A00220450 | Jones Abilene |
FY 26 Jones Co. JanitorialUS0180 · State Use Project | $16,028 | — | 0 | ||
| Mar 19, 2026 | 6499-69-001SUP - A00220453 | Callahan Abilene |
FY 26 Callahan Co. JanitorialUS0283 · State Use Project | $13,733 | — | 0 | ||
| Mar 19, 2026 | 6499-70-001SUP - A00220454 | Howard Abilene |
FY 26 Howard Co. JanitorialSH0350 · State Use Project | $12,247 | — | 0 | ||
| Mar 19, 2026 | 6499-71-001SUP - A00220456 | Haskell Abilene |
FY 26 Haskell Co. JanitorialUS0380 · State Use Project | $14,159 | — | 0 | ||
| Mar 19, 2026 | 6499-72-001SUP - A00220457 | Fisher Abilene |
FY 26 Fisher Co. JanitorialUS0180 · State Use Project | $12,465 | — | 0 | ||
| Mar 18, 2026 | 6495-74-001RMC - A00218944 | Potter Amarillo |
RPM FY 2026IH0040 · Routine Maintenance Project - Sealed | $614,855 | $640,394 | L&L COMPANY | +4.2% | 3 |
| Mar 18, 2026 | 6496-94-001RMC - A00219505 | Bowie Atlanta |
Callout Cable Barrier Repair (N) FY '26IH0030 · Routine Maintenance Project | $607,300 | $634,438 | H. V. CAVER, INC. | +4.5% | 2 |
| Mar 18, 2026 | 6496-95-001RMC - A00219506 | Harrison Atlanta |
Callout Cable Barrier Repair (S) FY '26IH0020 · Routine Maintenance Project | $574,800 | $597,215 | BK FIELD OPERATIONS LLC | +3.9% | 3 |
| Mar 18, 2026 | 6497-31-001RMC - A00219575 | Angelina Lufkin |
Thermoplastic Pavement Markings-2026US0059 · Routine Maintenance Project - Sealed | $585,700 | $558,500 | STRIPING TECHNOLOGY, L.P. | -4.6% | 6 |
| Mar 18, 2026 | 6492-32-001RMC - A00218067 | Wise Fort Worth |
FY26 Reflectorized Pvmnt Markings WiseUS0380 · Routine Maintenance Project - Sealed | $406,745 | $369,260 | THE CONFIDENCE GROUP, INC | -9.2% | 3 |
| Mar 18, 2026 | 6493-68-001RMC - A00218375 | Potter Amarillo |
Raising/Underseal Concrete PavementUS0287 · Routine Maintenance Project - Sealed | $294,482 | $272,385 | NORTEX CONCRETE LIFT & STABILIZATION, INC. | -7.5% | 2 |
| Mar 18, 2026 | 6496-29-001RMC - A00219212 | Shelby Lufkin |
2026-03US0059 · Routine Maintenance Project | $256,174 | $269,099 | ACE CONTRACTORS, INC. | +5.0% | 3 |
| Mar 18, 2026 | 6495-71-001RMC - A00218938 | Harrison Atlanta |
Callout MBGF Repair (S) FY '26US0059 · Routine Maintenance Project | $201,210 | $232,465 | AUSTIN BARRICADE COMPANY, L.L.C. | +15.5% | 2 |
| Mar 18, 2026 | 6496-12-001RMC - A00219097 | Sabine Lufkin |
2026-03 Sabine MowingUS0096 · Routine Maintenance Project | $219,606 | $223,706 | ACE CONTRACTORS, INC. | +1.9% | 3 |
| Mar 18, 2026 | 6495-70-001RMC - A00218937 | Bowie Atlanta |
Callout MBGF Repair (N) FY '26US0059 · Routine Maintenance Project | $182,810 | $180,035 | CATOCON, INC. | -1.5% | 3 |
| Mar 18, 2026 | 6495-72-001RMC - A00218939 | Titus Atlanta |
Callout MBGF Repair (W) FY '26US0271 · Routine Maintenance Project | $182,810 | $173,785 | CATOCON, INC. | -4.9% | 2 |
| Mar 18, 2026 | 6481-15-001BPM - A00214342 | Atascosa San Antonio |
FY2026 FM 3175 AT W PRONG ATASCOSA RIVERFM3175 · Bridge Preventative Maintenance - Sealed | $103,320 | $72,204 | DIAMOND R CONTRACTING, LLC | -30.1% | 7 |
| Mar 18, 2026 | 6490-77-001RMC - A00217696 | Upshur Atlanta |
Landscape Maintenance - Gilmer FY 2026US0271 · Routine Maintenance Project | $79,600 | $52,820 | KJRM GENERAL CONTRACTORS, LLC | -33.6% | 2 |
| Mar 18, 2026 | 6493-96-001BPM - A00218464 | Guadalupe San Antonio |
FM 2438 AT MILL CREEK FY2026FM2438 · Bridge Preventative Maintenance - Sealed | $48,908 | $48,346 | BK FIELD OPERATIONS LLC | -1.1% | 7 |
| Mar 18, 2026 | 6498-74-001EMC - A00220047 | Randall Amarillo |
Emergency Bridge Repair FM 3331FM3331 · Emergency Maintenance Project | $99,340 | — | 0 | ||
| Mar 18, 2026 | 6500-45-001SUP - A00220790 | Titus Atlanta |
Mt. Pleasant Janitorial Services FY 26US0271 · State Use Project | $14,000 | — | 0 | ||
| Mar 17, 2026 | 6496-23-001RMC - A00219146 | Nueces Corpus Christi |
6496-23-001 Flashing Beacon AssembliesSH0044 · Routine Maintenance Project - Sealed | $501,200 | $416,751 | HIGHWAY BARRICADES AND SERVICES, LLC | -16.8% | 6 |
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.