18,642Let jobs
$76,971,155,782Total low bids
$79,237,330,402Total estimates
-2.9%Low bids vs estimates
All dates results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| May 8, 2019 | 0915-00-222STP 2019(904) | Bexar San Antonio |
DISTRICTWIDE PAVEMENT MARKINGS - FY 2019VA · | $1,499,137 | $1,519,049 | TRP CONSTRUCTION GROUP, LLC | +1.3% | 3 |
| May 8, 2019 | 0175-02-093C 175-2-93 | Shelby Lufkin |
RESURFACE WITH THIN OVERLAY MIXTUREUS 84 · | $1,388,381 | $1,365,032 | MOORE BROTHERS CONSTRUCTION COMPANY | -1.7% | 3 |
| May 8, 2019 | 6342-36-001RMC - 634236001 | McLennan Waco |
MBGF, CABLE BARRIER, BRIDGE RAIL REP/INSUS 84 · | $812,766 | $1,355,400 | VANN/ELLI, INC. | +66.8% | 1 |
| May 8, 2019 | 0320-03-100BR 2019(823) | Williamson Austin |
REHABILITATE BRIDGESH 95 · | $1,426,920 | $1,339,952 | FUQUA CONSTRUCTION CO., INC. | -6.1% | 3 |
| May 8, 2019 | 0002-06-055STP 2019(964)HES | Hudspeth El Paso |
INSTALL LED FLASHING CHEVRONIH 10 · | $1,474,894 | $1,232,441 | INTERNATIONAL EAGLE ENTERPRISES, INC. | -16.4% | 5 |
| May 8, 2019 | 0045-09-101STP 2019(939)HES | Lamar Paris |
SAFETY RELATED PROJECT - HSIPUS 82 · | $1,177,038 | $1,229,692 | 3LW CIVIL LLC | +4.5% | 3 |
| May 8, 2019 | 0065-04-079BR 2019(946) | Jasper Beaumont |
UPDATE BRIDGE AND APPROACH DETAILUS 96 · | $869,960 | $1,098,473 | SCR CIVIL CONSTRUCTION, LLC | +26.3% | 4 |
| May 8, 2019 | 0817-01-026STP 2019(976) | Denton Dallas |
MILL & INLAY, PAVEMENT REPAIR AND MARKINGSFM 428 · | $1,570,654 | $1,092,191 | JAGOE-PUBLIC COMPANY | -30.5% | 4 |
| May 8, 2019 | 0914-04-271BR 1502(647) | Travis Austin |
REPLACE BRIDGE & APPROACHESCR · | $935,814 | $1,078,645 | SB CONTRACTORS LLC | +15.3% | 6 |
| May 8, 2019 | 6341-39-001RMC - 634139001 | Harris Houston |
MNT OF VIVDSIH 610 · | $971,976 | $993,653 | THIRD COAST SERVICES LLC | +2.2% | 4 |
| May 8, 2019 | 6344-54-001RMC - 634454001 | Collin Dallas |
FLEXIBLE PAVEMENT MILL AND OVERLAYSH 5 · | $1,147,620 | $982,775 | PEACHTREE CONSTRUCTION, LTD. | -14.4% | 3 |
| May 8, 2019 | 0188-01-039NH 2019(911) | Fort Bend Houston |
SPALL REP, SEAL COAT, 3/4" TOM, SIGN, PAV MRKSH 36 · | $762,042 | $949,220 | JAMES CONSTRUCTION GROUP, L.L.C. | +24.6% | 3 |
| May 8, 2019 | 6342-18-001RMC - 634218001 | Collin Dallas |
POTHOLE AND EDGE REPAIRUS 75 · | $787,500 | $813,000 | DBI SERVICES, LLC | +3.2% | 2 |
| May 8, 2019 | 6344-68-001RMC - 634468001 | Pecos Odessa |
CALLOUT TRAFFIC CONTROL SERVICESIH 10 · | $700,650 | $782,603 | BARRICADES UNLIMITED | +11.7% | 1 |
| May 8, 2019 | 0160-07-032BR 1802(207) | Val Verde Laredo |
BRIDGE MAINTENANCEUS 277 · | $481,875 | $720,100 | SJ&J CONSTRUCTION, LLC | +49.4% | 2 |
| May 8, 2019 | 0037-03-083STP 2019(820)HES | Zavala Laredo |
PROFILE EDGELINE AND CENTERLINE MARKINGSUS 83 · | $960,836 | $687,075 | D. I. J. CONSTRUCTION, INC. | -28.5% | 9 |
| May 8, 2019 | 0907-00-171NH 2019(832) | Tom Green San Angelo |
BRIDGE RAIL AND BRIDGE REPAIRSVA · | $665,148 | $682,830 | RELMCO, INC. | +2.7% | 4 |
| May 8, 2019 | 6344-40-001RMC - 634440001 | Ector Odessa |
CALLOUT TRAFFIC CONTROL SERVICESIH 20 · | $700,650 | $618,803 | BARRICADES UNLIMITED | -11.7% | 1 |
| May 8, 2019 | 6344-67-001RMC - 634467001 | Midland Odessa |
CALLOUT TRAFFIC CONTROL SERVICESIH 20 · | $700,650 | $618,803 | BARRICADES UNLIMITED | -11.7% | 1 |
| May 8, 2019 | 0198-07-015STP 2019(882)HESG | Cherokee Tyler |
CENTERLINE & PROFILE PAVEMENT MARKINGSSH 204 · | $656,699 | $562,314 | STRIPE-A-ZONE, INC. | -14.4% | 4 |
| May 8, 2019 | 0205-06-032STP 2019(892)HES | Freestone Bryan |
INSTALL INTERSECTION FLASHING BEACONUS 79 · | $400,415 | $486,288 | BAYER CONSTRUCTION ELECTRICAL CONTRACTORS, INC. | +21.4% | 2 |
| May 8, 2019 | 6343-25-001RMC - 634325001 | Galveston Houston |
FULL DEPTH CONCRETE REPAIRFM 518 · | $448,541 | $461,950 | ISI CONTRACTING, INC. | +3.0% | 2 |
| May 8, 2019 | 0913-22-046BR 1602(617) | Gonzales Yoakum |
REPLACE BRIDGE AND APPROACHESCR · | $404,782 | $399,752 | TMES LLC | -1.2% | 9 |
| May 8, 2019 | 1690-01-120STP 2019(943)HES | Lamar Paris |
SAFETY RELATED PROJECT - HSIPUS 271 · | $286,674 | $375,116 | EAST TEXAS BRIDGE, INC. | +30.9% | 3 |
| May 8, 2019 | 6344-27-001RMC - 634427001 | Lamar Paris |
ILLUMINATION MAINTENANCEUS 82 · | $297,210 | $307,223 | STRIPING TECHNOLOGY, L.P. | +3.4% | 1 |
| May 8, 2019 | 6326-49-001RMC - 632649001 | McLennan Waco |
DISTRICT WIDE MAINTENANCE OF ILLUMINATIONUS 84 · | $326,593 | $287,348 | HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC. | -12.0% | 4 |
| May 8, 2019 | 6326-50-001RMC - 632650001 | Bell Waco |
LARGE SIGN MAINTENANCEUS 190 · | $304,700 | $285,750 | CROSS PLUS CONSTRUCTION, LLC | -6.2% | 2 |
| May 8, 2019 | 0047-02-147STP 2019(940)HES | Grayson Paris |
SAFETY RELATED PROJECT - HSIPSH 91 · | $235,553 | $219,910 | NORTH TEXAS TRAFFIC SYSTEMS CONSTRUCTION | -6.6% | 2 |
| May 8, 2019 | 3510-05-042STP 2019(951) | Harris Houston |
PAVEMENT WIDENING, STORM SEWER, AND PAV MARKINGSSH 99 · | $204,059 | $183,439 | TREVWAY, INC. | -10.1% | 2 |
| May 7, 2019 | 0048-09-029NH 2019(834) | Hill Waco |
WDN, GR, STRS, SURFIH 35E · | $121,792,371 | $133,117,086 | SACYR CONSTRUCTION USA LLC | +9.3% | 12 |
| May 7, 2019 | 0051-09-024NH 2019(988) | Galveston Houston |
INST CROSS CULV & OVERLAYFM 3005 · | $43,905,821 | $35,347,635 | ANGEL BROTHERS HOLDINGS CORP. | -19.5% | 3 |
| May 7, 2019 | 0095-14-029NH 2019(928) | Kaufman Dallas |
BRDG DECK REPL,RUBBLIZE,OVERLAY,PAV RPR, PAV MRKIH 20 · | $16,456,439 | $22,030,033 | TEXAS MATERIALS GROUP, INC. | +33.9% | 1 |
| May 7, 2019 | 1158-06-006C 1158-6-6 | Culberson El Paso |
ROADWAY REHABILITATIONFM 3541 · | $9,408,525 | $11,896,485 | INTERNATIONAL EAGLE ENTERPRISES, INC. | +26.4% | 2 |
| May 7, 2019 | 0006-07-080NH 2019(920) | Callahan Abilene |
MILL & SMA OVRLAYIH 20 · | $9,844,142 | $10,684,705 | A. L. HELMCAMP, INC. | +8.5% | 6 |
| May 7, 2019 | 0027-01-044BR 2019(850) | Colorado Yoakum |
CONSTRUCT ONE WAY BRIDGE AND APPRUS 90 · | $8,536,799 | $8,244,675 | HARPER BROTHERS CONSTRUCTION LLC | -3.4% | 4 |
| May 7, 2019 | 0179-04-099STP 2019(759) | Matagorda Yoakum |
ACP OVERLAY AND ADD SHOULDERSSH 35 · | $7,750,820 | $7,279,319 | DURWOOD GREENE CONSTRUCTION CO. | -6.1% | 4 |
| May 7, 2019 | 0838-03-024STP 2019(918) | Fort Bend Houston |
SHOULDERS, BASE REP, O/L, BRIDGE & PV MRKSFM 361 · | $7,095,365 | $7,225,989 | DURWOOD GREENE CONSTRUCTION CO. | +1.8% | 3 |
| May 7, 2019 | 0912-73-183C 912-73-183 | Galveston Houston |
CONSTRUCT NEW ROADSCR · | $5,816,585 | $6,676,661 | ANGEL BROTHERS HOLDINGS CORP. | +14.8% | 4 |
| May 7, 2019 | 0256-02-031STP 2019(921) | Stephens Brownwood |
PAVMT/STRUCTURE/DITCH REPAIR-SAFETY TRT-SEAL_COATSH 67 · | $5,348,242 | $5,063,902 | PEACHTREE CONSTRUCTION, LTD. | -5.3% | 3 |
| May 7, 2019 | 0247-03-032STP 2019(657)HES | Panola Atlanta |
ACP SURFACE & PAV MARKINGSUS 79 · | $4,684,581 | $4,609,876 | MADDEN CONTRACTING COMPANY, LLC. | -1.6% | 4 |
| May 7, 2019 | 1558-01-019C 1558-1-19 | Nueces Corpus Christi |
RESTORATION OF EXISTING ROADWAYFM 70 · | $4,218,585 | $4,592,255 | TIERRA LEASE SERVICE, LLC | +8.9% | 6 |
| May 7, 2019 | 0053-15-024STP 2018(628)HES | Nolan Abilene |
SAFETY TREAT ENDS & WIDEN PAVEMENTFM 608 · | $2,676,116 | $4,261,779 | SALINAS CONSTRUCTION TECHNOLOGIES, LTD. | +59.3% | 2 |
| May 7, 2019 | 0915-00-223STP 2019(905) | Bexar San Antonio |
INTERSECTION OPERATIONAL IMPROVEMENTS-SOUTHVA · | $3,591,227 | $3,461,235 | CAPITAL EXCAVATION COMPANY | -3.6% | 6 |
| May 7, 2019 | 0720-03-134NH 2019(947) | Harris Houston |
INSTALL ITS EQUIPMENT & INFRASTRUCTURESH 249 · | $3,587,753 | $3,339,516 | SICE, INC. | -6.9% | 4 |
| May 7, 2019 | 0816-05-022STP 2019(931)HES | Collin Dallas |
FM 2862 · | $3,172,422 | $3,291,225 | A. K. GILLIS & SONS, INC. | +3.7% | 6 |
| May 7, 2019 | 6343-66-001RMC - 634366001 | Lamar Paris |
ON CALL MILL & INLAYUS 82 · | $3,007,861 | $3,130,824 | RICHARD DRAKE CONSTRUCTION COMPANY, L.P. | +4.1% | 3 |
| May 7, 2019 | 0035-01-035STP 2019(830)HES | Runnels San Angelo |
SAFETY TREAT FIXED OBJECTSUS 83 · | $2,387,845 | $3,077,659 | RELMCO, INC. | +28.9% | 2 |
| May 7, 2019 | 0001-03-058STP 2019(963)HES | El Paso El Paso |
IMPROVE TRAFFIC SIGNALSSH 20 · | $3,615,797 | $3,024,947 | TRI STATE ELECTRIC, LTD. | -16.3% | 1 |
| May 7, 2019 | 0918-00-295NH 2019(966) | Dallas Dallas |
CONSTRUCTION OF RUMBLE STRIPS AND PAVEMENT MARKINGVA · | $3,202,096 | $2,989,898 | STRIPE-A-ZONE, INC. | -6.6% | 5 |
| May 7, 2019 | 0495-08-116NH 2019(847) | Harrison Atlanta |
CEMENT TREAT BASE, ACP AND PAV MRKSIH 20 · | $2,526,187 | $2,388,394 | EAST TEXAS BRIDGE, INC. | -5.5% | 4 |
| May 7, 2019 | 0133-03-047STP 2019(772) | Knox Childress |
RECONSTRUCTION OF SAFETY REST AREAUS 82 · | $2,463,399 | $2,268,300 | ANTHONY INMAN CONSTRUCTION, INC. | -7.9% | 3 |
| May 7, 2019 | 0720-03-137STP 2019(948)HES | Harris Houston |
TRAFFIC SIGNAL IMPROVEMENTSSH 249 · | $2,219,969 | $2,179,892 | STATEWIDE TRAFFIC SIGNAL COMPANY | -1.8% | 3 |
| May 7, 2019 | 0041-05-052BR 2019(914) | Potter Amarillo |
REPLACE BRIDGE RAILUS 87 · | $1,652,756 | $1,849,686 | STATELINE CONSTRUCTION, LLC | +11.9% | 3 |
| May 7, 2019 | 6341-38-001RMC - 634138001 | Harris Houston |
LOOP DET REP AND/OR REPLMNTIH 610 · | $1,205,163 | $1,654,294 | SOUTHWEST SIGNAL SUPPLY, INC. | +37.3% | 2 |
| May 7, 2019 | 0915-17-067BR 2019(908) | Comal San Antonio |
REPLACE BRIDGE AND APPROACHESCS · | $1,790,990 | $1,589,567 | SB CONTRACTORS LLC | -11.2% | 11 |
| May 7, 2019 | 6342-37-001RMC - 634237001 | Atascosa San Antonio |
GUARDRAIL REPAIRSH 16 · | $1,618,901 | $1,471,268 | K-BAR SERVICES, INC. | -9.1% | 5 |
| May 7, 2019 | 0174-04-033STP 2019(941)HES | Fannin Paris |
HAZARD ELIMINATION & SAFETYFM 100 · | $1,455,374 | $1,423,585 | STRIPE-A-ZONE, INC. | -2.2% | 4 |
| May 7, 2019 | 0109-03-037STP 2019(864)HES | Houston Lufkin |
INSTALL SIGNS AND PAVEMENT MARKINGSUS 287 · | $1,124,506 | $1,390,005 | STRIPING TECHNOLOGY, L.P. | +23.6% | 1 |
| May 7, 2019 | 0915-00-209STP 2019(902) | Bexar San Antonio |
INTERSECTION OPERATIONAL IMPROVEMENTS-NORTHVA · | $1,628,273 | $1,371,713 | Curran Contracting Company | -15.8% | 5 |
| May 7, 2019 | 0914-00-400STP 2019(825) | Travis Austin |
FY 2019 SITE SPECIFIC SIGNALSVA · | $1,339,325 | $1,358,621 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | +1.4% | 2 |
| May 7, 2019 | 0039-01-094STP 2019(953)HES | Starr Pharr |
CONSTRUCT MEDIAN CROSSOVERUS 83 · | $759,390 | $1,161,965 | REIM CONSTRUCTION, INC. | +53.0% | 3 |
| May 7, 2019 | 0166-07-062STP 2019(878)HES | Madison Bryan |
INSTALL CONTINUOUS LEFT TURN LANESH 75 · | $946,250 | $1,084,259 | ANGEL BROTHERS HOLDINGS CORP. | +14.6% | 1 |
| May 7, 2019 | 0391-03-031STP 2019(957) | Clay Wichita Falls |
REHABILITATE EXISTING SHOULDERS AND OVERLAYSH 148 · | $914,851 | $1,041,711 | ZACK BURKETT CO. | +13.9% | 4 |
| May 7, 2019 | 0435-01-079BR 2019(942) | Lamar Paris |
BRIDGE REPLACEMENTFM 137 · | $1,027,742 | $1,008,565 | HIGHWAY 19 CONSTRUCTION LLC | -1.9% | 7 |
| May 7, 2019 | 0092-02-129NH 2019(926) | Dallas Dallas |
INSTALL GUIDE SIGNSIH 45 · | $1,058,879 | $1,008,155 | CREATIVE DESIGN CONCEPTS, LLC | -4.8% | 6 |
| May 7, 2019 | 6330-76-001RMC - 633076001 | Denton Dallas |
FLEXIBLE PAVEMENT REPAIRFM 424 · | $838,327 | $994,626 | EUROVIA ATLANTIC COAST LLC | +18.6% | 3 |
| May 7, 2019 | 0909-38-080BR 2018(294) | Limestone Waco |
REPL BR & APPRSCR · | $1,056,773 | $933,888 | JAMES CONSTRUCTION GROUP, L.L.C. | -11.6% | 8 |
| May 7, 2019 | 0022-07-030STP 2019(819)HES | Val Verde Laredo |
PROFILE EDGELINE AND CENTERLINE MARKINGSUS 90 · | $1,269,030 | $911,561 | DOUBLE A CONTRACTING, L.P. | -28.2% | 8 |
| May 7, 2019 | 0667-02-111STP 2019(742)HES | Jefferson Beaumont |
IMPROVE TRAFFIC SIGNALSFM 366 · | $665,782 | $880,769 | TRAF-TEX, INC. | +32.3% | 1 |
| May 7, 2019 | 6337-11-001RMC - 633711001 | Montgomery Houston |
ROADSIDE MOWINGIH 45 · | $837,350 | $780,155 | WAYNE YANCEY, INC. | -6.8% | 2 |
| May 7, 2019 | 6340-63-001RMC - 634063001 | Dallas Dallas |
SIGN REPLACEMENT AND REFURBISHINGIH 30 · | $612,907 | $683,185 | SYNERGY SIGNS & SERVICES LLC | +11.5% | 2 |
| May 7, 2019 | 6327-13-001RMC - 632713001 | Travis Austin |
SIGNAL REPAIR WITH EMERGENCY CALL OUTSFM 685 · | $764,655 | $663,818 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | -13.2% | 1 |
| May 7, 2019 | 0915-13-029BR 2019(907) | Atascosa San Antonio |
REPLACE BRIDGE AND APPROACHESCR · | $484,586 | $619,854 | SB CONTRACTORS LLC | +27.9% | 8 |
| May 7, 2019 | 0914-00-419NH 2019(829) | Travis Austin |
CONSTRUCT ADA RAMPS & SIDEWALKSVA · | $572,049 | $609,304 | TREVWAY, INC. | +6.5% | 4 |
| May 7, 2019 | 3538-01-052STP 1902(124) | Montgomery Houston |
CONSTRUCT NEW SIGNAL & MEDIAN CLSRSH 242 · | $381,763 | $574,644 | MAIN LANE INDUSTRIES LTD. | +50.5% | 2 |
| May 7, 2019 | 0009-13-171STP 2019(938)HES | Hunt Paris |
SAFETY IMPROVEMENT PROJECTSIH 30 · | $528,961 | $542,728 | EAST TEXAS BRIDGE, INC. | +2.6% | 4 |
| May 7, 2019 | 0015-05-050STP 2019(837)HES | Bell Waco |
IMPROVE TRAFFIC SIGNALSSH 317 · | $424,477 | $521,881 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | +22.9% | 2 |
| May 7, 2019 | 0018-03-058STP 2019(607)HES | Webb Laredo |
SAFETY LIGHTINGIH 35 · | $531,357 | $503,367 | F & W ELECTRICAL CONTRACTORS, INC. | -5.3% | 4 |
| May 7, 2019 | 0095-06-071STP 2019(853)HESG | Van Zandt Tyler |
CENTERLINE & EDGELINE PROFILE PAVMENT MARKINGSUS 80 · | $557,547 | $499,197 | TOTAL HIGHWAY MAINTENANCE, LLC | -10.5% | 5 |
| May 7, 2019 | 6342-38-001RMC - 634238001 | Jasper Beaumont |
METAL BEAM GUARD FENCE REPAIRSUS 69 · | $423,655 | $415,500 | ELITE CASTLE RESOURCES LLC | -1.9% | 3 |
| May 7, 2019 | 6332-26-001RMC - 633226001 | Bexar San Antonio |
RETAINING WALL REPAIRFM 2696 · | $400,931 | $389,024 | HAYWARD BAKER, INC. | -3.0% | 5 |
| May 7, 2019 | 1751-01-030STP 2019(936)HES | Wise Fort Worth |
HAZARD ELIMINATION & SAFETYFM 1655 · | $238,193 | $333,066 | JAY MILLS CONTRACTING, INCORPORATED | +39.8% | 3 |
| May 7, 2019 | 6338-38-001RMC - 633838001 | Montgomery Houston |
CONCRETE STRUCTURE REPAIRIH 45 · | $294,800 | $292,925 | ISI CONTRACTING, INC. | -0.6% | 2 |
| May 7, 2019 | 0064-06-055BR 2019(851) | Sabine Lufkin |
SCOUR REPAIRSUS 96 · | $193,570 | $260,935 | FNH CONSTRUCTION, LLC | +34.8% | 2 |
| May 7, 2019 | 2102-01-074NH 2019(826) | Travis Austin |
LANDSCAPING AND IRRIGATIONRM 2244 · | $251,382 | $229,999 | HAM-BAR, L.L.C. | -8.5% | 6 |
| Apr 17, 2019 | 6344-28-001RMC - 634428001 | Montague Wichita Falls |
TREE TRIMMING & BRUSH REMOVALUS 82 · | $266,623 | $329,795 | CATOCON, INC. | +23.7% | 2 |
| Apr 17, 2019 | 6342-94-001RMC - 634294001 | Wichita Wichita Falls |
PAVEMENT TEXTURINGUS 287 · | $253,866 | $297,800 | TOTAL HIGHWAY MAINTENANCE, LLC | +17.3% | 1 |
| Apr 4, 2019 | 6332-23-001BPM - 633223001 | Wood Tyler |
BRIDGE PROVENTATIVE MAINTENANCEFM 17 · | $299,630 | $268,797 | RED BARON BUILDING COMPANY, L.L.C. | -10.3% | 5 |
| Apr 4, 2019 | 6341-24-001RMC - 634124001 | Smith Tyler |
BRIDGE REPAIRIH 20 · | $71,139 | $74,575 | GIBSON & ASSOCIATES, INC. | +4.8% | 3 |
| Apr 3, 2019 | 0076-01-029NH 1802(325) | Pecos Odessa |
ROADWAY WIDENING TO A MODIFIED SUPER 2US 67 · | $46,872,979 | $48,936,556 | JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY | +4.4% | 4 |
| Apr 3, 2019 | 0172-05-115NH 2019(978) | Ellis Dallas |
GR, RV, DR, BR, RET WALL, CUL, SIGN, PV MKUS 287 · | $36,969,721 | $37,276,577 | OHL USA, INC. | +0.8% | 9 |
| Apr 3, 2019 | 3532-02-011C 3532-2-11 | Webb Laredo |
BASE,ACP,GRAD,STR,PAV MRKFM 3338 · | $22,551,599 | $23,429,429 | ANDERSON COLUMBIA CO., INC. | +3.9% | 2 |
| Apr 3, 2019 | 0145-05-032STP 2019(750) | Hale Lubbock |
PAVEMENT REPAIR, LEVEL-UP, OVERLAYUS 70 · | $14,105,189 | $18,510,115 | DUININCK, INC. | +31.2% | 2 |
| Apr 3, 2019 | 0072-06-074NH 2019(776) | Kendall San Antonio |
RECONFG RAMPS & WIDEN FR TO CONVERT TO ONE WAY OPIH 10 · | $18,670,375 | $18,335,085 | AUSTIN BRIDGE & ROAD SERVICES, LP | -1.8% | 6 |
| Apr 3, 2019 | 0912-72-363STP 2017(407)MM | Harris Houston |
RECON ROADWAY INCLUDING CURB, GUTTER SIDEWALKS,CS · | $16,135,786 | $17,999,505 | HARPER BROTHERS CONSTRUCTION LLC | +11.6% | 4 |
| Apr 3, 2019 | 0051-02-101STP 2019(765)TAP | Harris Houston |
ADD BIKE LANESSH 3 · | $12,575,141 | $13,951,960 | ANGEL BROTHERS HOLDINGS CORP. | +10.9% | 2 |
| Apr 3, 2019 | 0348-03-030C 348-3-30 | Karnes Corpus Christi |
REHAB ROADWAY AND ADD PASSING LANESSH 80 · | $14,368,033 | $13,738,005 | HUNTER INDUSTRIES, LTD. | -4.4% | 7 |
| Apr 3, 2019 | 0353-04-106NH 2019(718) | Dallas Dallas |
MILL, CONC FULL DEPTH REPAIR, OVERLAY & PVMNT MRKSS 348 · | $9,273,287 | $12,971,191 | AUSTIN BRIDGE & ROAD SERVICES, LP | +39.9% | 2 |
| Apr 3, 2019 | 0133-02-025NH 2019(590) | Knox Childress |
SUPER 2US 82 · | $10,556,028 | $11,182,988 | A. L. HELMCAMP, INC. | +5.9% | 3 |
| Apr 3, 2019 | 0247-01-057NH 2019(679) | Panola Atlanta |
PLANE ACP, ACP SURF, & PAV MARKUS 79 · | $9,847,685 | $8,993,197 | MADDEN CONTRACTING COMPANY, LLC. | -8.7% | 4 |
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.