18,642Let jobs
$76,971,155,782Total low bids
$79,237,330,402Total estimates
-2.9%Low bids vs estimates
All dates results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Aug 5, 2021 | 0902-38-129BR 2019(266) | Parker Fort Worth |
BRIDGE REPLACEMENTCS · | $804,134 | $919,705 | ED BELL CONSTRUCTION COMPANY | +14.4% | 4 |
| Aug 5, 2021 | 6378-75-001RMC - 637875001 | Wichita Wichita Falls |
FULL DEPTH CONCRETE REPAIRUS 82 · | $920,130 | $857,850 | O. TREVINO CONSTRUCTION, LLC | -6.8% | 4 |
| Aug 5, 2021 | 0593-01-130STP 2021(532)HES | Liberty Beaumont |
HAZARD ELIMINATION & SAFETYSH 105 · | $730,539 | $856,007 | TEXAS MATERIALS GROUP, INC. | +17.2% | 1 |
| Aug 5, 2021 | 0079-03-051F 2021(766) | Comanche Brownwood |
INTERSECTION IMPROVEMENTUS 67 · | $872,673 | $850,895 | JAY MILLS CONTRACTING, INCORPORATED | -2.5% | 2 |
| Aug 5, 2021 | 6385-98-001RMC - 638598001 | Scurry Abilene |
CRACK SEALUS 84 · | $935,961 | $778,357 | D & M CONTRACTORS, LLC | -16.8% | 4 |
| Aug 5, 2021 | 6380-94-001RMC - 638094001 | Dallas Dallas |
TRAFFIC CONTROL SERVICESIH 35E · | $653,250 | $751,000 | STATEWIDE SAFETY SYSTEMS | +15.0% | 4 |
| Aug 5, 2021 | 6383-12-001RMC - 638312001 | Dallas Dallas |
REPAIR/REPLACE CONCRETE BARRIERSL 12 · | $934,250 | $696,400 | GIBSON & ASSOCIATES, INC. | -25.5% | 6 |
| Aug 5, 2021 | 6378-59-001RMC - 637859001 | Montague Wichita Falls |
CULVERT REPLACEMENTFM 1749 · | $580,503 | $600,994 | TALBRAN ENTERPRISES LLC | +3.5% | 3 |
| Aug 5, 2021 | 0912-72-352BR 2019(251) | Harris Houston |
REPLACE BRIDGE AND APPROACHESCS · | $509,882 | $599,801 | ARANDA BROTHERS CONSTRUCTION CO., INC. | +17.6% | 2 |
| Aug 5, 2021 | 2574-01-049F 2021(716) | Tom Green San Angelo |
TRAFFIC SIGNAL IMPROVEMENTSCS · | $373,364 | $538,601 | TI-ZACK CONCRETE, INC. | +44.3% | 1 |
| Aug 5, 2021 | 0014-01-025STP 2021(636)HES | Tarrant Fort Worth |
INSTALL TRAFFIC SIGNALBU 287P · | $501,217 | $524,000 | DURABLE SPECIALTIES, INC. | +4.5% | 3 |
| Aug 5, 2021 | 6377-87-001RMC - 637787001 | Coryell Waco |
CULVERT REPAIRFM 185 · | $482,593 | $486,782 | CROSS PLUS CONSTRUCTION, LLC | +0.9% | 3 |
| Aug 5, 2021 | 6383-74-001RMC - 638374001 | Smith Tyler |
CRACK SEALUS 69 · | $480,588 | $452,694 | CRACKSEAL OF TEXAS, LLC | -5.8% | 4 |
| Aug 5, 2021 | 0916-00-241F 2021(922) | Nueces Corpus Christi |
LANDSCAPE DEVELOPMENTVA · | $313,266 | $384,164 | TIGHT LINE CONSTRUCTION, LLC | +22.6% | 1 |
| Aug 5, 2021 | 6383-30-001MMC - 638330001 | Hopkins Paris |
LIMESTONE ROCK AND ASPHALTSH 11 · | $366,000 | $380,715 | VULCAN CONSTRUCTION MATERIALS, LLC | +4.0% | 1 |
| Aug 5, 2021 | 6379-39-001RMC - 637939001 | Navarro Dallas |
CULVERT EXTENSION & CROSS DRAINAGEFM 1838 · | $301,889 | $371,146 | TALBRAN ENTERPRISES LLC | +22.9% | 4 |
| Aug 5, 2021 | 6384-28-001RMC - 638428001 | Hill Waco |
CRACK SEALFM 934 · | $494,865 | $366,958 | D & M CONTRACTORS, LLC | -25.8% | 4 |
| Aug 5, 2021 | 6381-46-001RMC - 638146001 | Brazoria Houston |
METAL BEAM GUARD FENCE REPAIRSH 288 · | $351,870 | $354,298 | ISI CONTRACTING, INC. | +0.7% | 3 |
| Aug 5, 2021 | 0157-09-005F 2021(847) | Haskell Abilene |
INSTALL FLASHING BEACONUS 277 · | $301,070 | $348,082 | WILLIS ELECTRIC CO., LP | +15.6% | 1 |
| Aug 5, 2021 | 6384-36-001RMC - 638436001 | Potter Amarillo |
CABLE MEDIAN BARRIER SYSTEM REPAIRIH 40 · | $351,750 | $335,300 | E.V.G. ENTERPRISE | -4.7% | 3 |
| Aug 5, 2021 | 6381-58-001MMC - 638158001 | Grayson Paris |
LIMESTONE ROCK AND ASPHALTUS 75 · | $312,500 | $317,075 | VULCAN CONSTRUCTION MATERIALS, LLC | +1.5% | 1 |
| Aug 5, 2021 | 0542-01-097F 2021(885) | Webb Laredo |
INSTALL TRAFFIC SIGNAL AND RAISED MEDIANBU 59-Z · | $368,773 | $306,767 | TRIPLE H FIELD SERVICES, LLC | -16.8% | 3 |
| Aug 5, 2021 | 6381-57-001MMC - 638157001 | Hunt Paris |
LIMESTONE ROCK AND ASPHALTIH 30 · | $305,000 | $305,100 | VULCAN CONSTRUCTION MATERIALS, LLC | +0.0% | 1 |
| Aug 5, 2021 | 6386-40-001RMC - 638640001 | Nueces Corpus Christi |
MOWING HIGHWAY RIGHT OF WAYIH 37 · | $262,163 | $304,025 | R&M INCORPORATED | +16.0% | 1 |
| Aug 5, 2021 | 0833-03-051STP 2021(785)HES | McLennan Waco |
INSTALL TRAFFIC SIGNAL AND CURB RAMPSFM 1637 · | $174,957 | $206,817 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | +18.2% | 2 |
| Aug 5, 2021 | 0917-00-051C 917-00-51 | Brazos Bryan |
ADVANCED TRAFFIC MANAGEMENT SYSTEM CONNECTIONVA · | $230,300 | $183,906 | TRAF-TEX, INC. | -20.1% | 5 |
| Aug 5, 2021 | 0039-07-258F 2021(932) | Cameron Pharr |
TRAFFIC SIGNAL IMPROVEMENTSIH 69E · | $157,044 | $150,583 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | -4.1% | 2 |
| Aug 5, 2021 | 0065-02-056F 2021(936) | Jasper Beaumont |
TRAFFIC SIGNAL IMPROVEMENTSUS 96 · | $107,583 | $104,464 | THIRD COAST SERVICES LLC | -2.9% | 3 |
| Aug 5, 2021 | 0910-34-033F 2021(924) | Henderson Tyler |
LANDSCAPE DEVELOPMENTVA · | $108,760 | $72,072 | TIGHT LINE CONSTRUCTION, LLC | -33.7% | 4 |
| Aug 4, 2021 | 0135-10-050F 2021(536) | Denton Dallas |
WDN 4 TO 6 LN DIV W/ GRADE SEP, ADD RT/LT TURN LNUS 380 · | $148,561,178 | $140,553,393 | ZACHRY CONSTRUCTION CORPORATION | -5.4% | 6 |
| Aug 4, 2021 | 0188-10-021F 2021(492) | Fort Bend Houston |
WIDEN ROADWAYFM 1463 · | $102,375,985 | $108,363,935 | ZACHRY CONSTRUCTION CORPORATION | +5.8% | 3 |
| Aug 4, 2021 | 0188-05-027NH 2021(728) | Brazoria Houston |
RECONSTRUCT & WIDEN ROAD FROM 2 TO 4 LANE DIVIDEDSH 36 · | $91,239,425 | $96,532,489 | ZACHRY CONSTRUCTION CORPORATION | +5.8% | 2 |
| Aug 4, 2021 | 0172-09-037F 2021(864) | Tarrant Fort Worth |
WIDEN ROAD - ADD SHOULDERSUS 287 · | $30,222,263 | $30,738,904 | ED BELL CONSTRUCTION COMPANY | +1.7% | 7 |
| Aug 4, 2021 | 0699-01-052F 2021(851) | Taylor Abilene |
WIDEN ROAD - ADD LANESFM 89 · | $24,229,630 | $28,944,555 | A. L. HELMCAMP, INC. | +19.5% | 2 |
| Aug 4, 2021 | 0050-03-096STP 2021(770)HES | Grimes Bryan |
HAZARD ELIMINATION & SAFETYSH 6 · | $18,724,906 | $18,052,622 | LARRY YOUNG PAVING, INC. | -3.6% | 6 |
| Aug 4, 2021 | 2121-04-114CBI 2021(797) | El Paso El Paso |
WIDEN ROAD - ADD LANESIH 10 · | $17,988,823 | $18,039,541 | INTERNATIONAL EAGLE ENTERPRISES, INC. | +0.3% | 5 |
| Aug 4, 2021 | 0180-06-067F 2021(879) | San Patricio Corpus Christi |
INTERCHANGE IMPROVEMENT (NEW OR UPDATE)SH 35 · | $17,562,493 | $17,952,983 | BAY LTD. | +2.2% | 3 |
| Aug 4, 2021 | 0169-07-053C 169-7-53 | Gray Amarillo |
HIGHWAY IMPROVEMENTUS 60 · | $18,919,048 | $16,536,379 | RK HALL, LLC | -12.6% | 5 |
| Aug 4, 2021 | 1259-01-044F 2021(653) | Montgomery Houston |
RECONSTRUCT & WIDEN FROM 2 TO 4 LANESFM 1097 · | $14,647,689 | $16,095,271 | JAMES CONSTRUCTION GROUP, LLC | +9.9% | 7 |
| Aug 4, 2021 | 1236-01-015F 2021(843) | Willacy Pharr |
RECONSTRUCT EXISTING ROADWAYFM 1018 · | $14,854,432 | $12,441,759 | FOREMOST PAVING, INC. | -16.2% | 4 |
| Aug 4, 2021 | 1113-01-028BR 2021(774) | De Witt Yoakum |
BRIDGE REPLACEMENTFM 766 · | $12,049,383 | $12,073,106 | TEXAS MATERIALS GROUP, INC. | +0.2% | 4 |
| Aug 4, 2021 | 0495-09-056C 495-9-56 | Harrison Atlanta |
REPLACE BRIDGE & APPROACHESIH 20 · | $10,475,734 | $11,887,791 | EAST TEXAS BRIDGE, INC. | +13.5% | 4 |
| Aug 4, 2021 | 0902-39-040C 902-39-40 | Palo Pinto Fort Worth |
STATE PARK IMPROVEMENTSVA · | $10,178,415 | $11,699,665 | A. L. HELMCAMP, INC. | +14.9% | 2 |
| Aug 4, 2021 | 0162-01-097C 162-1-97 | McLennan Waco |
CONSTRUCT NEW OVERPASS AND APPROACHESSH 31 · | $11,439,533 | $11,321,680 | WEBBER, LLC | -1.0% | 5 |
| Aug 4, 2021 | 0015-09-194F 2021(948) | Williamson Austin |
HIGHWAY IMPROVEMENTIH 35 · | $8,402,902 | $9,323,423 | J.D. ABRAMS, L.P. | +11.0% | 5 |
| Aug 4, 2021 | 0111-08-100C 111-8-100 | Brazoria Houston |
WIDEN TO 4-LANE DIVIDED RURALSH 36 · | $7,638,229 | $8,923,165 | COPASA INC | +16.8% | 4 |
| Aug 4, 2021 | 0617-02-001BR 2021(752) | Nueces Corpus Christi |
BRIDGE MAINTENANCEPR 22 · | $9,230,111 | $8,685,850 | GIBSON & ASSOCIATES, INC. | -5.9% | 3 |
| Aug 4, 2021 | 0189-01-012F 2021(792) | Red River Paris |
PREVENTIVE MAINTENANCESH 37 · | $9,286,772 | $7,781,705 | RK HALL, LLC | -16.2% | 3 |
| Aug 4, 2021 | 0150-04-046C 150-4-46 | Llano Austin |
HIGHWAY IMPROVEMENTSH 29 · | $7,172,733 | $7,398,989 | HUNTER INDUSTRIES, LTD. | +3.2% | 4 |
| Aug 4, 2021 | 2523-01-026C 2523-1-26 | Galveston Houston |
WIDEN SLDRS, ADD PASSING LN, LEVEL UP & SUPER PAVEFM 2004 · | $7,104,633 | $7,147,857 | TEXAS MATERIALS GROUP, INC. | +0.6% | 2 |
| Aug 4, 2021 | 0316-03-010F 2021(793) | Grayson Paris |
REHABILITATE EXISTING ROADWAYFM 1753 · | $5,627,905 | $6,464,805 | RK HALL, LLC | +14.9% | 4 |
| Aug 4, 2021 | 0650-01-034F 2021(848) | Nolan Abilene |
WIDEN ROAD - ADD SHOULDERSSH 153 · | $6,268,122 | $5,924,739 | NOBLES ROAD CONSTRUCTION, INC. | -5.5% | 8 |
| Aug 4, 2021 | 0273-04-048F 2021(949) | Williamson Austin |
REHABILITATION OF EXISTING ROADUS 183 · | $5,039,983 | $5,760,579 | TEXAS MATERIALS GROUP, INC. | +14.3% | 8 |
| Aug 4, 2021 | 1480-02-036F 2021(875) | Randall Amarillo |
INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT TFM 1541 · | $4,485,905 | $5,305,311 | J. LEE MILLIGAN, INC. | +18.3% | 3 |
| Aug 4, 2021 | 0190-03-087F 2021(820) | Wood Tyler |
ROADWAY REHABILITATION/RECONSTRUCTION WITH NO ADDESH 37 · | $4,596,702 | $4,577,457 | EAST TEXAS BRIDGE, INC. | -0.4% | 3 |
| Aug 4, 2021 | 0241-03-029F 2021(721) | Matagorda Yoakum |
HAZARD ELIMINATION & SAFETYSH 60 · | $2,898,350 | $4,538,993 | HUNTER INDUSTRIES, LTD. | +56.6% | 2 |
| Aug 4, 2021 | 0086-20-023STP 2021(877)HES | Nueces Corpus Christi |
HAZARD ELIMINATION & SAFETYFM 665 · | $4,641,197 | $4,508,718 | CK NEWBERRY, LLC | -2.9% | 3 |
| Aug 4, 2021 | 0747-05-041F 2021(865) | Johnson Fort Worth |
RESURFACE ROADWAYFM 157 · | $3,682,242 | $3,859,278 | FOUTSCO PAVING COMPANY, LLC | +4.8% | 7 |
| Aug 4, 2021 | 2552-02-035C 2552-2-35 | El Paso El Paso |
INTERCHANGE IMPROVEMENTSL 375 · | $4,730,247 | $3,808,795 | INTERNATIONAL EAGLE ENTERPRISES, INC. | -19.5% | 4 |
| Aug 4, 2021 | 2032-03-013F 2021(852) | Jones Abilene |
REHABILITATION OF EXISTING ROADWAYFM 600 · | $4,052,877 | $3,551,480 | FOUTSCO PAVING COMPANY, LLC | -12.4% | 6 |
| Aug 4, 2021 | 0271-15-097F 2021(836) | Harris Houston |
BRIDGE MAINTENANCEIH 610 · | $4,475,523 | $3,481,497 | CEKRA INC. | -22.2% | 4 |
| Aug 4, 2021 | 0043-09-144BR 2021(701) | Wichita Wichita Falls |
BRIDGE MAINTENANCEIH 44 · | $2,726,842 | $3,356,261 | GIBSON & ASSOCIATES, INC. | +23.1% | 4 |
| Aug 4, 2021 | 0987-03-012STP 2021(806)MM | Hays Austin |
WIDEN ROAD - ADD LANESFM 621 · | $3,558,837 | $2,961,992 | HUNTER INDUSTRIES, LTD. | -16.8% | 9 |
| Aug 4, 2021 | 0015-10-071F 2021(681) | Travis Austin |
CONSTRUCT PEDESTRIAN INFRASTRUCTUREIH 35 · | $4,256,955 | $2,895,230 | DBI SERVICES, LLC | -32.0% | 9 |
| Aug 4, 2021 | 1191-03-033BR 2020(319) | Limestone Waco |
REPLACE BRIDGE AND APPROACHESFM 1245 · | $2,910,760 | $2,816,412 | STATELINE CONSTRUCTION, LLC | -3.2% | 3 |
| Aug 4, 2021 | 0474-01-005C 474-1-5 | Kimble San Angelo |
BRIDGE REPLACEMENTPR 73 · | $2,705,633 | $2,649,387 | RELMCO, INC. | -2.1% | 5 |
| Aug 4, 2021 | 0068-07-052F 2021(845) | Howard Abilene |
HIGHWAY IMPROVEMENTUS 87 · | $3,131,429 | $2,550,798 | MASSANA CONSTRUCTION INC. | -18.5% | 6 |
| Aug 4, 2021 | 1077-01-026STP 2021(788)HES | Falls Waco |
HAZARD ELIMINATION & SAFETYFM 434 · | $2,292,395 | $2,480,710 | KNIFE RIVER CORPORATION - SOUTH | +8.2% | 4 |
| Aug 4, 2021 | 6381-39-001RMC - 638139001 | Dallas Dallas |
METAL BEAM GUARD FENCE REPAIRUS 80 · | $3,259,000 | $2,474,835 | FIREMAN EXCAVATING, INC. | -24.1% | 4 |
| Aug 4, 2021 | 0283-04-035F 2021(873) | Archer Wichita Falls |
SURFACING/ROADWAY RESTORATIONSH 79 · | $2,143,703 | $1,821,357 | ZACK BURKETT CO. | -15.0% | 8 |
| Aug 4, 2021 | 0161-03-024F 2021(884) | Val Verde Laredo |
INSTALL SIDEWALKS AND ILLUMINATIONSS 239 · | $1,724,639 | $1,703,783 | DELGADO'S CONTRACTORS, LLC | -1.2% | 3 |
| Aug 4, 2021 | 0008-05-031STP 2021(863) | Tarrant Fort Worth |
CONSTRUCT PEDESTRIAN INFRASTRUCTURESH 180 · | $1,686,028 | $1,663,321 | ENCINO LANDSCAPE, INC. | -1.3% | 7 |
| Aug 4, 2021 | 0920-00-143F 2021(724) | Jefferson Beaumont |
TRANSPORTATION SYSTEM SENSORSVA · | $2,237,627 | $1,652,630 | THIRD COAST SERVICES LLC | -26.1% | 4 |
| Aug 4, 2021 | 0183-01-053F 2021(767) | Comanche Brownwood |
INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT TSH 36 · | $1,598,594 | $1,557,595 | JAY MILLS CONTRACTING, INCORPORATED | -2.6% | 3 |
| Aug 4, 2021 | 0915-12-625STP 2021(676)HES | Bexar San Antonio |
HAZARD ELIMINATION & SAFETYCS · | $1,606,979 | $1,494,380 | E-Z BEL CONSTRUCTION, LLC | -7.0% | 3 |
| Aug 4, 2021 | 6381-13-001RMC - 638113001 | Brazoria Houston |
SWEEPING AND DEBRIS REMOVALSH 288 · | $1,298,300 | $1,466,907 | SWEEPING SERVICES OF TEXAS - OPERATING, L.P. | +13.0% | 2 |
| Aug 4, 2021 | 1316-01-067STP 2021(771)HES | Brazos Bryan |
INSTALL RAISED MEDIANFM 1179 · | $1,349,105 | $1,423,097 | LARRY YOUNG PAVING, INC. | +5.5% | 4 |
| Aug 4, 2021 | 6379-84-001RMC - 637984001 | Sabine Lufkin |
MILL AND INLAYSH 87 · | $1,434,421 | $1,417,523 | DREWERY CONSTRUCTION COMPANY, INCORPORATED | -1.2% | 3 |
| Aug 4, 2021 | 0905-21-004BR 2019(810) | Crosby Lubbock |
BRIDGE REPLACEMENTCR · | $1,362,931 | $1,322,304 | EARTH BUILDERS, L.P. | -3.0% | 3 |
| Aug 4, 2021 | 0912-00-644F 2021(817) | Harris Houston |
HAZARD ELIMINATION & SAFETYVA · | $1,503,546 | $1,273,418 | PROFESSIONAL TRAFFIC CONTROL LLC | -15.3% | 5 |
| Aug 4, 2021 | 0065-07-068F 2021(876) | Jefferson Beaumont |
HAZARD ELIMINATION & SAFETYUS 69 · | $1,163,978 | $1,241,805 | TEXAS MATERIALS GROUP, INC. | +6.7% | 4 |
| Aug 4, 2021 | 0027-12-159C 27-12-159 | Fort Bend Houston |
LANDSCAPE DEVELOPMENTIH 69 · | $1,132,011 | $1,099,756 | GREEN SAGE SERVICES LLC | -2.8% | 4 |
| Aug 4, 2021 | 0663-02-010F 2021(849) | Taylor Abilene |
ADD TURN LANEFM 707 · | $1,004,733 | $1,084,713 | CONTRACT PAVING CO. | +8.0% | 3 |
| Aug 4, 2021 | 6384-97-001MMC - 638497001 | McLennan Waco |
FLEXIBLE BASE MATERIAL ONLYUS 84 · | $1,309,768 | $1,077,561 | DIGG COMMERCIAL, LLC | -17.7% | 4 |
| Aug 4, 2021 | 0911-00-112F 2021(833) | Angelina Lufkin |
INSTALL ADVANCED TRAFFIC MANAGEMENT SYSTEMVA · | $1,201,634 | $963,892 | THIRD COAST SERVICES LLC | -19.8% | 4 |
| Aug 4, 2021 | 6383-90-001MMC - 638390001 | Henderson Tyler |
AGGREGATEUS 175 · | $719,600 | $936,000 | DIGG COMMERCIAL, LLC | +30.1% | 1 |
| Aug 4, 2021 | 0176-02-124F 2021(825) | Angelina Lufkin |
CONSTRUCT PEDESTRIAN INFRASTRUCTUREBU 59-G · | $979,564 | $934,763 | DBI SERVICES, LLC | -4.6% | 6 |
| Aug 4, 2021 | 6380-16-001BPM - 638016001 | Hidalgo Pharr |
BRIDGE PREVENTATIVE MAINTENANCEFM 396 · | $759,006 | $677,721 | SCR CIVIL CONSTRUCTION, LLC | -10.7% | 2 |
| Aug 4, 2021 | 0339-03-039STP 2021(465)HES | Hardin Beaumont |
CONSTRUCT NEW ROADSH 105 · | $443,211 | $645,519 | TEXAS MATERIALS GROUP, INC. | +45.6% | 3 |
| Aug 4, 2021 | 0902-90-096STP 2021(867)HES | Tarrant Fort Worth |
INSTALL TRAFFIC SIGNALCS · | $556,903 | $627,241 | DBI SERVICES, LLC | +12.6% | 5 |
| Aug 4, 2021 | 6380-74-001RMC - 638074001 | Wichita Wichita Falls |
CRACK SEALUS 82 · | $753,081 | $607,288 | TALBRAN ENTERPRISES LLC | -19.4% | 4 |
| Aug 4, 2021 | 0912-00-625F 2021(838) | Harris Houston |
TRAFFIC SIGNAL IMPROVEMENTSVA · | $617,559 | $592,164 | FLORIDA TRAFFIC CONTROL DEVICES, INC. | -4.1% | 3 |
| Aug 4, 2021 | 6386-41-001RMC - 638641001 | Karnes Corpus Christi |
MOWING HIGHWAY RIGHT OF WAYUS 181 · | $484,989 | $577,056 | R&M INCORPORATED | +19.0% | 1 |
| Aug 4, 2021 | 0027-13-240F 2021(835) | Harris Houston |
HIGHWAY IMPROVEMENTIH 69 · | $495,929 | $544,151 | MAIN LANE INDUSTRIES LTD. | +9.7% | 1 |
| Aug 4, 2021 | 6381-48-001RMC - 638148001 | Brazoria Houston |
MOWING HIGHWAY RIGHT OF WAYSH 288 · | $587,381 | $519,303 | LAWNSCAPES UNLIMITED | -11.6% | 4 |
| Aug 4, 2021 | 6379-42-001RMC - 637942001 | Karnes Corpus Christi |
REHABILITATION OF EXISTING ROADWAYFM 81 · | $604,894 | $516,751 | CK NEWBERRY, LLC | -14.6% | 7 |
| Aug 4, 2021 | 6383-58-001RMC - 638358001 | Galveston Houston |
ASPHALT PAVEMENT REPAIRSH 146 · | $481,515 | $494,685 | MAIN LANE INDUSTRIES LTD. | +2.7% | 2 |
| Aug 4, 2021 | 6382-07-001RMC - 638207001 | Parker Fort Worth |
SWEEPING AND DEBRIS REMOVALIH 20 · | $431,408 | $489,926 | CROSBY RD CONSTRUCTION INC | +13.6% | 2 |
| Aug 4, 2021 | 6382-94-001RMC - 638294001 | Henderson Tyler |
TREE REMOVALSH 31 · | $504,000 | $485,500 | PATTERSON'S COMPLETE TREE SERVICE LLC | -3.7% | 6 |
| Aug 4, 2021 | 0038-01-095F 2021(883) | Webb Laredo |
EXTEND EXISTING LEFT TURN LANEUS 83 · | $290,266 | $462,192 | ANDERSON COLUMBIA CO., INC. | +59.2% | 1 |
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.