| 1 | 104-6017 |
REMOVING CONC (DRIVEWAYS) | 639 | SY |
$15.39 |
$10.00 |
$21.00 |
$22.00 |
$32.00 |
$15.00 |
$19.00 |
|
| 2 | 110-6001 |
EXCAVATION (ROADWAY) | 150 | CY |
$7.04 |
$30.00 |
$31.00 |
$33.00 |
$75.00 |
$14.00 |
$20.00 |
|
| 3 | 132-6004 |
EMBANKMENT (FINAL)(DENS CONT)(TY B) | 350 | CY |
$7.14 |
$25.00 |
$52.00 |
$55.00 |
$45.00 |
$14.00 |
$25.00 |
|
| 4 | 134-6002 |
BACKFILL (TY B) | 464.6 | STA |
$181.97 |
$100.00 |
$183.00 |
$230.00 |
$60.00 |
$150.00 |
$125.00 |
|
| 5 | 164-6023 |
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY) | 1,050 | SY |
$0.8200 |
$1.00 |
$2.18 |
$5.10 |
$2.10 |
$5.00 |
$2.55 |
|
| 6 | 168-6001 |
VEGETATIVE WATERING | 36.8 | MG |
$17.32 |
$75.00 |
$35.00 |
$250.00 |
$10.00 |
$15.00 |
$90.00 |
|
| 7 | 180-6001 |
WILDFLOWER SEEDING | 0.22 | AC |
$5,000.00 |
$3,000.00 |
$5,250.00 |
$8,500.00 |
$5,250.00 |
$8,500.00 |
$16,900.00 |
|
| 8 | 340-6247 |
D-GR HMA (SQ) TY-D PG 70-22(LEVEL-UP) | 811 | TON |
$80.00 |
$130.00 |
$112.00 |
$125.00 |
$125.00 |
$100.00 |
$115.00 |
|
| 9 | 351-6021 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(13") | 11,373 | SY |
$64.00 |
$75.00 |
$78.00 |
$79.00 |
$90.00 |
$80.00 |
$79.00 |
|
| 10 | 354-6002 |
PLAN & TEXT ASPH CONC PAV(0" TO 2") | 70,503 | SY |
$0.4000 |
$0.7000 |
$1.30 |
$1.15 |
$2.40 |
$2.00 |
$1.50 |
|
| 11 | 354-6004 |
PLAN & TEXT ASPH CONC PAV(0" TO 4") | 1,741 | SY |
$10.00 |
$2.00 |
$2.18 |
$2.05 |
$12.00 |
$4.00 |
$3.00 |
|
| 12 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 238 | CY |
$525.00 |
$475.00 |
$580.00 |
$550.00 |
$578.00 |
$550.00 |
$650.00 |
|
| 13 | 438-6001 |
CLEANING AND SEALING EXISTING JOINTS | 262 | LF |
$37.11 |
$35.00 |
$48.00 |
$42.00 |
$53.50 |
$50.00 |
$41.00 |
|
| 14 | 451-6004 |
RETROFIT RAIL (TY T131RC) | 210 | LF |
$200.00 |
$195.00 |
$200.00 |
$215.00 |
$275.00 |
$250.00 |
$230.00 |
|
| 15 | 500-6001 |
MOBILIZATION | 1 | LS |
$325,042.50 |
$262,000.00 |
$425,716.00 |
$375,000.00 |
$275,000.00 |
$445,000.00 |
$509,000.00 |
|
| 16 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 12 | MO |
$8,897.89 |
$1,700.00 |
$23,000.00 |
$5,000.00 |
$4,000.00 |
$5,000.00 |
$10,000.00 |
|
| 17 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 5,302 | LF |
$2.12 |
$3.50 |
$3.60 |
$4.50 |
$3.65 |
$5.00 |
$2.25 |
|
| 18 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 5,302 | LF |
$0.4900 |
$1.00 |
$1.05 |
$1.40 |
$1.05 |
$1.50 |
$1.13 |
|
| 19 | 506-6041 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 200 | LF |
$3.58 |
$6.00 |
$6.25 |
$5.00 |
$6.30 |
$5.00 |
$6.15 |
|
| 20 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 200 | LF |
$0.7400 |
$1.00 |
$1.05 |
$1.40 |
$1.05 |
$1.50 |
$2.80 |
|
| 21 | 510-6004 |
ONE-WAY TRAFFIC CONTROL (PORT TRAF SIG) | 9 | DAY |
$245.92 |
$500.00 |
$0.0100 |
$2,750.00 |
$850.00 |
$500.00 |
$660.00 |
|
| 22 | 512-6017 |
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1) | 600 | LF |
$25.00 |
$25.00 |
$0.0100 |
$60.00 |
$30.00 |
$15.00 |
$11.00 |
|
| 23 | 512-6029 |
PORT CTB (MOVE)(F-SHAPE)(TY 1) | 600 | LF |
$10.00 |
$10.00 |
$0.0100 |
$30.00 |
$30.00 |
$5.00 |
$10.00 |
|
| 24 | 512-6041 |
PORT CTB (STKPL)(F-SHAPE)(TY 1) | 600 | LF |
$20.00 |
$15.00 |
$0.0100 |
$25.00 |
$30.00 |
$8.00 |
$10.00 |
|
| 25 | 530-6004 |
DRIVEWAYS (CONC) | 639 | SY |
$75.50 |
$80.00 |
$102.00 |
$102.50 |
$132.00 |
$90.00 |
$98.00 |
|
| 26 | 530-6005 |
DRIVEWAYS (ACP) | 115 | SY |
$36.79 |
$50.00 |
$58.00 |
$65.00 |
$35.00 |
$25.00 |
$24.00 |
|
| 27 | 530-6016 |
DRIVEWAYS (BASE) | 3,137 | SY |
$14.40 |
$12.00 |
$25.00 |
$22.00 |
$7.00 |
$20.00 |
$8.00 |
|
| 28 | 533-6004 |
RUMBLE STRIPS (CENTERLINE) ASPHALT | 42,446 | LF |
$0.1900 |
$0.1000 |
$0.1500 |
$0.2000 |
$0.2100 |
$0.2000 |
$0.1000 |
|
| 29 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 1,875 | LF |
$19.98 |
$22.00 |
$23.00 |
$23.50 |
$22.50 |
$22.00 |
$24.60 |
|
| 30 | 540-6002 |
MTL W-BEAM GD FEN (STEEL POST) | 125 | LF |
$19.71 |
$60.00 |
$59.00 |
$79.00 |
$58.75 |
$75.00 |
$56.50 |
|
| 31 | 540-6006 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 18 | EA |
$1,741.56 |
$1,800.00 |
$1,720.00 |
$1,650.00 |
$1,710.00 |
$1,500.00 |
$2,360.00 |
|
| 32 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 2,162.5 | LF |
$2.19 |
$3.00 |
$2.60 |
$2.20 |
$2.60 |
$2.25 |
$2.05 |
|
| 33 | 542-6002 |
REMOVE TERMINAL ANCHOR SECTION | 8 | EA |
$194.70 |
$250.00 |
$130.00 |
$215.00 |
$131.00 |
$200.00 |
$154.00 |
|
| 34 | 542-6004 |
RM MTL BM GD FENCE TRANS (THRIE-BEAM) | 10 | EA |
$225.48 |
$250.00 |
$208.00 |
$215.00 |
$210.00 |
$200.00 |
$154.00 |
|
| 35 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 26 | EA |
$2,581.40 |
$2,900.00 |
$2,620.00 |
$2,950.00 |
$2,675.00 |
$2,750.00 |
$2,700.00 |
|
| 36 | 544-6003 |
GUARDRAIL END TREATMENT (REMOVE) | 17 | EA |
$204.66 |
$250.00 |
$260.00 |
$215.00 |
$263.00 |
$200.00 |
$205.00 |
|
| 37 | 545-6002 |
CRASH CUSH ATTEN (DES SOURCE) | 4 | EA |
$1,500.00 |
$1,600.00 |
$1.00 |
$1,050.00 |
$3,000.00 |
$1,000.00 |
$2,700.00 |
|
| 38 | 545-6003 |
CRASH CUSH ATTEN (MOVE & RESET) | 4 | EA |
$1,690.87 |
$1,200.00 |
$1.00 |
$2,750.00 |
$1,500.00 |
$2,500.00 |
$2,600.00 |
|
| 39 | 545-6004 |
CRASH CUSH ATTEN (STKPL) | 4 | EA |
$1,188.89 |
$700.00 |
$1.00 |
$4,200.00 |
$1,500.00 |
$4,000.00 |
$1,000.00 |
|
| 40 | 658-6026 |
INSTL DEL ASSM (D-SY)SZ (BRF)CTB | 20 | EA |
$24.00 |
$15.00 |
$19.00 |
$25.50 |
$19.00 |
$25.00 |
$20.50 |
|
| 41 | 658-6064 |
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2 | 82 | EA |
$27.00 |
$28.00 |
$38.00 |
$36.00 |
$39.00 |
$35.00 |
$33.00 |
|
| 42 | 662-6109 |
WK ZN PAV MRK SHT TERM (TAB)TY W | 10 | EA |
$0.5800 |
$2.00 |
$1.10 |
$2.00 |
$0.5000 |
$1.00 |
$2.30 |
|
| 43 | 662-6111 |
WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 4,513 | EA |
$0.8800 |
$1.00 |
$1.10 |
$2.00 |
$0.5000 |
$1.00 |
$1.07 |
|
| 44 | 666-6036 |
REFL PAV MRK TY I (W)8"(SLD)(100MIL) | 185 | LF |
$0.7600 |
$0.7800 |
$1.05 |
$0.8600 |
$0.8200 |
$0.8000 |
$0.8000 |
|
| 45 | 666-6048 |
REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 192 | LF |
$5.72 |
$6.00 |
$5.40 |
$6.50 |
$6.30 |
$6.00 |
$6.15 |
|
| 46 | 666-6054 |
REFL PAV MRK TY I (W)(ARROW)(100MIL) | 1 | EA |
$127.64 |
$175.00 |
$210.00 |
$195.00 |
$184.00 |
$200.00 |
$180.00 |
|
| 47 | 666-6078 |
REFL PAV MRK TY I (W)(WORD)(100MIL) | 1 | EA |
$149.15 |
$200.00 |
$210.00 |
$215.00 |
$210.00 |
$200.00 |
$205.00 |
|
| 48 | 666-6102 |
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL) | 17 | EA |
$44.90 |
$75.00 |
$47.00 |
$85.00 |
$79.00 |
$75.00 |
$77.00 |
|
| 49 | 666-6230 |
PAVEMENT SEALER 24" | 12 | LF |
$1.21 |
$5.00 |
$5.20 |
$5.40 |
$5.25 |
$5.00 |
$5.10 |
|
| 50 | 666-6303 |
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) | 4,789 | LF |
$0.3800 |
$0.3400 |
$0.4800 |
$0.3900 |
$0.3700 |
$0.4000 |
$0.3600 |
|
| 51 | 666-6312 |
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) | 230 | LF |
$0.3300 |
$0.3400 |
$1.05 |
$0.3900 |
$0.3700 |
$0.4000 |
$0.3600 |
|
| 52 | 666-6315 |
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) | 88,762 | LF |
$0.3800 |
$0.3400 |
$0.4200 |
$0.3900 |
$0.3700 |
$0.4000 |
$0.3600 |
|
| 53 | 666-6342 |
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL) | 87,556 | LF |
$0.4900 |
$0.4800 |
$0.6200 |
$0.5500 |
$0.5300 |
$0.5000 |
$0.5100 |
|
| 54 | 672-6009 |
REFL PAV MRKR TY II-A-A | 1,125 | EA |
$3.46 |
$4.50 |
$3.70 |
$5.25 |
$4.73 |
$5.00 |
$4.60 |
|
| 55 | 678-6008 |
PAV SURF PREP FOR MRK (24") | 12 | LF |
$0.6000 |
$5.00 |
$2.05 |
$5.75 |
$5.25 |
$5.00 |
$5.13 |
|
| 56 | 3077-6027 |
SP MIXES SP-C SAC-A PG70-28 | 16,348 | TON |
$96.56 |
$116.00 |
$111.00 |
$112.00 |
$110.00 |
$112.00 |
$110.00 |
|
| 57 | 3077-6075 |
TACK COAT | 28,430 | GAL |
$0.7600 |
$0.0100 |
$0.0100 |
$1.50 |
$3.25 |
$3.00 |
$5.00 |
|
| 58 | 6001-6001 |
PORTABLE CHANGEABLE MESSAGE SIGN | 540 | DAY |
$75.00 |
$0.0100 |
$53.00 |
$50.00 |
$34.00 |
$100.00 |
$40.00 |
|
| 59 | 6056-6001 |
PREFORMED IN-LANE(TRANS) RUMBLE STRIP | 80 | LF |
$10.52 |
$22.00 |
$16.00 |
$11.50 |
$10.00 |
$25.00 |
$10.25 |
|
| 60 | 6185-6002 |
TMA (STATIONARY) | 526 | DAY |
$119.65 |
$0.0100 |
$0.0100 |
$125.00 |
$150.00 |
$175.00 |
$70.00 |
|
| 61 | 6185-6005 |
TMA (MOBILE OPERATION) | 54 | DAY |
$286.17 |
$0.0100 |
$0.0100 |
$300.00 |
$675.00 |
$205.00 |
$400.00 |
|