| 1 | 104-6001 |
REMOVING CONC (PAV) | 249 | SY |
$30.00 |
$20.00 |
| 2 | 104-6009 |
REMOVING CONC (RIPRAP) | 614 | SY |
$30.00 |
$9.00 |
| 3 | 104-6037 |
REMOVE CONC (RAIL) | 21 | LF |
$28.00 |
$20.00 |
| 4 | 105-6008 |
REMOVING STAB BASE AND ASPH PAV (6") | 474 | SY |
$20.00 |
$9.00 |
| 5 | 105-6065 |
REMOVING STAB BASE AND ASPH PAV (1") | 1,751 | SY |
$5.00 |
$5.00 |
| 6 | 110-6001 |
EXCAVATION (ROADWAY) | 464 | CY |
$16.00 |
$40.00 |
| 7 | 112-6004 |
SUBGRADE WIDENING (ORD COMP) | 806 | SY |
$32.00 |
$20.00 |
| 8 | 132-6005 |
EMBANKMENT (FINAL)(ORD COMP)(TY C) | 264 | CY |
$30.00 |
$40.00 |
| 9 | 162-6002 |
BLOCK SODDING | 537 | SY |
$5.00 |
$4.00 |
| 10 | 166-6001 |
FERTILIZER | 0.12 | AC |
$2,000.00 |
$2,000.00 |
| 11 | 168-6001 |
VEGETATIVE WATERING | 13.3 | MG |
$200.00 |
$50.00 |
| 12 | 292-6017 |
ASPHALT STAB BASE (GR 4)(PG 64) | 42 | TON |
$150.00 |
$75.00 |
| 13 | 316-6008 |
ASPH (A-R TYPE III) | 411 | GAL |
$15.00 |
$9.00 |
| 14 | 340-6119 |
D-GR HMA(SQ) TY-D SAC-A PG70-22 | 164 | TON |
$250.00 |
$150.00 |
| 15 | 340-6272 |
TACK COAT | 217 | GAL |
$5.00 |
$3.00 |
| 16 | 360-6043 |
CONC PVMT (CONT REINF)(FAST TRK)(13") | 96 | SY |
$215.00 |
$250.00 |
| 17 | 360-6087 |
CONC PAV (JOINT REINF) (FAST TRK) (9") | 415 | SY |
$190.00 |
$135.00 |
| 18 | 432-6001 |
RIPRAP (CONC)(4 IN) | 60 | CY |
$550.00 |
$700.00 |
| 19 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 11 | CY |
$550.00 |
$1,200.00 |
| 20 | 500-6001 |
MOBILIZATION | 1 | LS |
$41,482.14 |
$50,000.00 |
| 21 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 2 | MO |
$15,000.00 |
$40,000.00 |
| 22 | 506-6040 |
BIODEG EROSN CONT LOGS (INSTL) (8") | 76 | LF |
$5.00 |
$10.00 |
| 23 | 506-6041 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 90 | LF |
$6.00 |
$12.00 |
| 24 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 166 | LF |
$2.00 |
$1.00 |
| 25 | 512-6001 |
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1) | 570 | LF |
$92.00 |
$90.00 |
| 26 | 514-6001 |
PERM CTB (SGL SLOPE) (TY 1) (42 ) | 424 | LF |
$95.00 |
$130.00 |
| 27 | 514-6652 |
PERM CTB (TRAN SSCB TO T501)(MOD) | 30 | LF |
$150.00 |
$280.00 |
| 28 | 529-6005 |
CONC CURB (MONO) (TY II) | 613 | LF |
$8.00 |
$7.00 |
| 29 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 225 | LF |
$40.00 |
$30.00 |
| 30 | 540-6016 |
DOWNSTREAM ANCHOR TERMINAL SECTION | 1 | EA |
$2,000.00 |
$3,000.00 |
| 31 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 1 | EA |
$5,000.00 |
$3,500.00 |
| 32 | 644-6004 |
IN SM RD SN SUP&AM TY10BWG(1)SA(T) | 1 | EA |
$1,000.00 |
$650.00 |
| 33 | 644-6012 |
IN SM RD SN SUP&AM TY10BWG(1)SB(T) | 3 | EA |
$680.00 |
$1,000.00 |
| 34 | 644-6030 |
IN SM RD SN SUP&AM TYS80(1)SA(T) | 1 | EA |
$1,000.00 |
$870.00 |
| 35 | 644-6076 |
REMOVE SM RD SN SUP&AM | 4 | EA |
$300.00 |
$45.00 |
| 36 | 658-6013 |
INSTL DEL ASSM (D-SW)SZ (BRF)CTB | 15 | EA |
$25.00 |
$28.00 |
| 37 | 658-6026 |
INSTL DEL ASSM (D-SY)SZ (BRF)CTB | 15 | EA |
$25.00 |
$28.00 |
| 38 | 658-6101 |
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF | 210 | EA |
$10.00 |
$89.00 |
| 39 | 666-6309 |
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) | 1,030 | LF |
$1.00 |
$1.35 |
| 40 | 666-6321 |
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) | 1,048 | LF |
$1.00 |
$1.35 |
| 41 | 672-6014 |
TRAFFIC BUTTON TY II-C-R | 13 | EA |
$10.00 |
$10.00 |
| 42 | 678-6002 |
PAV SURF PREP FOR MRK (6") | 2,078 | LF |
$0.3000 |
$0.0500 |
| 43 | 6001-6001 |
PORTABLE CHANGEABLE MESSAGE SIGN | 42 | DAY |
$85.00 |
$100.00 |
| 44 | 6185-6002 |
TMA (STATIONARY) | 35 | DAY |
$173.00 |
$250.00 |