236Let jobs
$1,258,967,457Total low bids
$1,223,220,414Total estimates
+2.9%Low bids vs estimates
Jun 2024 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Jun 27, 2024 | 6465-93-001RMC - 646593001 | Hopkins Paris |
BRIDGE REPAIRSH 11 · | $292,720 | $284,396 | A-1 DOT SOLUTIONS LLC | -2.8% | 6 |
| Jun 27, 2024 | 6457-55-001BPM - 645755001 | Grayson Paris |
BRIDGE PREVENTATIVE MAINTENANCEUS 75 · | $202,576 | $173,186 | ALBECO CONTRACTORS LLC | -14.5% | 5 |
| Jun 27, 2024 | 6457-48-001BPM - 645748001 | Grayson Paris |
BRIDGE PREVENTATIVE MAINTENANCEUS 75 · | $130,489 | $117,765 | GARRET SHIELDS INFRASTRUCTURE | -9.8% | 3 |
| Jun 26, 2024 | 6396-49-001RMC - 639649001 | Ellis Dallas |
MISCELLANEOUS CONCRETE REPAIRIH 45 · | $227,339 | $206,266 | RHINO EQUITY, LLC | -9.3% | 5 |
| Jun 25, 2024 | 6468-56-001RMC - 646856001 | Jackson Yoakum |
DEBRIS REMOVALUS 59 · | $207,100 | $398,988 | RISE UP CONSTRUCTION LLC | +92.7% | 1 |
| Jun 25, 2024 | 6467-90-001MMC - 646790001 | Polk Lufkin |
EMULSION/CRS2P/POLK (SAN JAC & TRIN)US 59 · | $157,000 | $156,750 | CLEVELAND ASPHALT PRODUCTS, INC. | -0.2% | 1 |
| Jun 20, 2024 | 6466-73-001RMC - 646673001 | Bexar San Antonio |
CRACK SEALIH 37 · | $235,925 | $302,025 | FYL ENTERPRISES, LLC | +28.0% | 2 |
| Jun 20, 2024 | 6466-70-001RMC - 646670001 | Medina San Antonio |
CRACK SEALUS 90 · | $262,525 | $271,707 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | +3.5% | 4 |
| Jun 20, 2024 | 6449-43-001RMC - 644943001 | La Salle Laredo |
MOWING HIGHWAY RIGHT OF WAYIH 35 · | $266,838 | $265,338 | USA DT SERVICES, INC. | -0.6% | 3 |
| Jun 20, 2024 | 6466-74-001RMC - 646674001 | Bexar San Antonio |
CRACK SEALIH 410 · | $166,725 | $209,537 | FYL ENTERPRISES, LLC | +25.7% | 2 |
| Jun 20, 2024 | 6466-71-001RMC - 646671001 | Comal San Antonio |
CRACK SEALFM 1101 · | $184,200 | $180,876 | FYL ENTERPRISES, LLC | -1.8% | 3 |
| Jun 18, 2024 | 6469-12-001MMC - 646912001 | San Patricio Corpus Christi |
FLEXIBLE BASEUS 181 · | $292,500 | $342,485 | COLORADO MATERIALS, LTD. | +17.1% | 3 |
| Jun 18, 2024 | 6466-09-001MMC - 646609001 | Brazos Bryan |
ROCK/RIPRAPSH 6 · | $256,500 | $299,000 | TOUCHSTONE RESOURCES, LLC | +16.6% | 2 |
| Jun 18, 2024 | 6437-67-001RMC - 643767001 | Webb Laredo |
LANDSCAPE MAINTENANCESL 20 · | $249,635 | $295,014 | R&M INCORPORATED | +18.2% | 2 |
| Jun 18, 2024 | 6460-56-001RMC - 646056001 | Freestone Bryan |
CRACK SEALSH 164 · | $175,908 | $270,469 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | +53.8% | 2 |
| Jun 18, 2024 | 6469-13-001MMC - 646913001 | Karnes Corpus Christi |
AGGREGATEUS 181 · | $290,500 | $268,500 | BRAUNTEX MATERIALS, INC. | -7.6% | 4 |
| Jun 18, 2024 | 6469-14-001MMC - 646914001 | Jim Wells Corpus Christi |
AGGREGATEUS 281 · | $225,000 | $247,190 | VULCAN CONSTRUCTION MATERIALS, LLC | +9.9% | 4 |
| Jun 18, 2024 | 6467-69-001RMC - 646769001 | Walker Bryan |
TREE REMOVALSH 75 · | $234,600 | $209,184 | LONGHORN SERVICES NORTH TEXAS, LLC. | -10.8% | 3 |
| Jun 18, 2024 | 6469-11-001MMC - 646911001 | Karnes Corpus Christi |
FLEXIBLE BASEUS 181 · | $115,500 | $106,680 | COLORADO MATERIALS, LTD. | -7.6% | 3 |
| Jun 18, 2024 | 6466-36-001MMC - 646636001 | Randall Amarillo |
LIMEIH 27 · | $43,200 | $44,100 | TEXAS LIME COMPANY | +2.1% | 1 |
| Jun 13, 2024 | 6466-83-001MMC - 646683001 | El Paso El Paso |
AGGREGATESL 375 · | $103,600 | $126,300 | JOBE MATERIALS, L.P. | +21.9% | 1 |
| Jun 12, 2024 | 6406-08-001RMC - 640608001 | Hays Austin |
TREE TRIMMING AND BRUSH REMOVALRM 12 · | $253,591 | $245,020 | JCW CONSTRUCTION, LLC | -3.4% | 4 |
| Jun 12, 2024 | 6467-32-001RMC - 646732001 | Brazos Bryan |
CRACK SEALUS 190 · | $140,890 | $213,500 | D & M CONTRACTORS, LLC | +51.5% | 2 |
| Jun 12, 2024 | 6467-64-001RMC - 646764001 | Freestone Bryan |
TREE REMOVALSH 75 · | $234,600 | $202,625 | LONGHORN SERVICES NORTH TEXAS, LLC. | -13.6% | 2 |
| Jun 12, 2024 | 6463-70-001RMC - 646370001 | Walker Bryan |
LARGE SIGN REPLACEMENTIH 45 · | $266,051 | $195,525 | SYNERGY SIGNS & SERVICES LLC | -26.5% | 3 |
| Jun 12, 2024 | 6467-12-001MMC - 646712001 | Washington Bryan |
FLEXIBLE BASESH 36 · | $157,500 | $163,500 | TOUCHSTONE RESOURCES, LLC | +3.8% | 3 |
| Jun 12, 2024 | 6406-02-001RMC - 640602001 | Bastrop Austin |
TREE TRIMMING AND BRUSH REMOVALSH 21 · | $190,798 | $150,372 | JCW CONSTRUCTION, LLC | -21.2% | 3 |
| Jun 12, 2024 | 6406-06-001RMC - 640606001 | Travis Austin |
TREE TRIMMING AND BRUSH REMOVALFM 969 · | $137,970 | $113,505 | ROAD SOLUTIONS L.L.C. | -17.7% | 7 |
| Jun 11, 2024 | 6464-81-001RMC - 646481001 | Brazoria Houston |
REHABILITATION OF EXISTING ROADWAYFM 2004 · | $298,528 | $368,715 | FORDE CONSTRUCTION COMPANY, INC. | +23.5% | 4 |
| Jun 11, 2024 | 6468-94-001MMC - 646894001 | Midland Odessa |
LIMESTONE ROCK ASPHALTIH 20 · | $250,500 | $247,596 | VULCAN CONSTRUCTION MATERIALS, LLC | -1.2% | 1 |
| Jun 11, 2024 | 6394-58-001RMC - 639458001 | Lampasas Brownwood |
CONCRETE STRUCTURE REPAIRUS 183 · | $288,205 | $240,308 | RISE UP CONSTRUCTION LLC | -16.6% | 5 |
| Jun 11, 2024 | 6468-95-001MMC - 646895001 | Ector Odessa |
LIMESTONE ROCK ASPHALTSL 338 · | $210,000 | $213,783 | VULCAN CONSTRUCTION MATERIALS, LLC | +1.8% | 1 |
| Jun 11, 2024 | 6468-80-001MMC - 646880001 | Polk Lufkin |
HOT MIX/SP, TY C, D & PATCH/POLKUS 59 · | $193,058 | $194,883 | TEXAS MATERIALS GROUP, INC. | +0.9% | 1 |
| Jun 11, 2024 | 6464-26-001RMC - 646426001 | Collin Dallas |
SPECIALTY MARKINGSUS 75 · | $240,852 | $179,280 | STRIPE-A-ZONE, LLC | -25.6% | 3 |
| Jun 11, 2024 | 6465-83-001MMC - 646583001 | Kaufman Dallas |
FLEXIBLE BASEFM 2728 · | $122,000 | $140,000 | KNIFE RIVER CORPORATION - SOUTH | +14.8% | 3 |
| Jun 11, 2024 | 6468-93-001MMC - 646893001 | Pecos Odessa |
LIMESTONE ROCK ASPHALTBI 10G · | $147,000 | $137,504 | VULCAN CONSTRUCTION MATERIALS, LLC | -6.5% | 2 |
| Jun 11, 2024 | 6466-45-001MMC - 646645001 | Denton Dallas |
FLEXIBLE BASEUS 380 · | $18,750 | $17,500 | TOUCHSTONE RESOURCES, LLC | -6.7% | 2 |
| Jun 11, 2024 | 6465-92-001MMC - 646592001 | Kaufman Dallas |
LIMEFM 2728 · | $15,500 | $13,500 | TEXAS LIME COMPANY | -12.9% | 2 |
| Jun 10, 2024 | 6467-11-001MMC - 646711001 | Brazos Bryan |
FLEXIBLE BASESH 6 · | $157,500 | $189,000 | TOUCHSTONE RESOURCES, LLC | +20.0% | 3 |
| Jun 10, 2024 | 6468-82-001MMC - 646882001 | Taylor Abilene |
LIMESTONE ROCK ASPHALTIH 20 · | $92,891 | $92,898 | VULCAN CONSTRUCTION MATERIALS, LLC | +0.0% | 1 |
| Jun 7, 2024 | 6459-89-001BPM - 645989001 | Rusk Tyler |
BRIDGE PREVENTATIVE MAINTENANCEFM 1798 · | $188,600 | $143,400 | GARRET SHIELDS INFRASTRUCTURE | -24.0% | 4 |
| Jun 6, 2024 | 2452-03-087F 2B24(168) | Bexar San Antonio |
WIDEN ROAD - ADD LANESSL 1604 · | $158,644,827 | $155,959,723 | WEBBER, LLC | -1.7% | 5 |
| Jun 6, 2024 | 0177-11-161C 177-11-161 | Harris Houston |
DRAINAGE IMPROVEMENTSIH 69 · | $101,910,064 | $121,889,279 | HARPER BROTHERS CONSTRUCTION LLC | +19.6% | 3 |
| Jun 6, 2024 | 3049-01-022F 2022(726) | Galveston Houston |
WIDEN ROAD - ADD LANESFM 646 · | $86,402,641 | $115,893,024 | JAMES CONSTRUCTION GROUP, LLC | +34.1% | 2 |
| Jun 6, 2024 | 0006-03-121STP 2000(401)TP | Nolan Abilene |
CONSTRUCT REST AREAIH 20 · | $52,231,957 | $74,808,808 | WEBBER, LLC | +43.2% | 2 |
| Jun 6, 2024 | 0044-04-048F 2024(766) | Montague Wichita Falls |
WIDEN ROAD - ADD LANESUS 82 · | $32,244,738 | $38,961,339 | A. L. HELMCAMP, INC. | +20.8% | 3 |
| Jun 6, 2024 | 1986-01-064C 1986-1-64 | Montgomery Houston |
REHABILITATE EXISTING ROADWAYFM 1314 · | $29,750,878 | $31,355,905 | R CONSTRUCTION CIVIL, LLC | +5.4% | 6 |
| Jun 6, 2024 | 0043-02-080BR 2024(922) | Hardeman Childress |
BRIDGE REPLACEMENTUS 287 · | $25,479,723 | $28,987,860 | MORTMARA CONSTRUCTION, INC. | +13.8% | 4 |
| Jun 6, 2024 | 1155-01-017C 1155-1-17 | Martin Odessa |
HIGHWAY IMPROVEMENTFM 846 · | $34,112,466 | $26,967,769 | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | -20.9% | 4 |
| Jun 6, 2024 | 0568-01-052F 2B24(160) | Ellis Dallas |
REPAIR ROADWAYSH 34 · | $12,752,089 | $12,687,858 | BIG CREEK CONSTRUCTION, LTD. | -0.5% | 3 |
| Jun 6, 2024 | 0212-04-039BR 2B24(147) | Grimes Bryan |
BRIDGE REPLACEMENTSH 30 · | $9,446,098 | $12,337,845 | BIG CREEK CONSTRUCTION, LTD. | +30.6% | 6 |
| Jun 6, 2024 | 0275-01-244F 2B24(154) | Potter Amarillo |
INSTALL ILLUMINATIONIH 40 · | $12,020,605 | $11,497,987 | HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC | -4.3% | 3 |
| Jun 6, 2024 | 0118-06-077F 2024(934) | Nacogdoches Lufkin |
RESURFACE ROADWAYBS 21-P · | $9,514,903 | $10,814,631 | TEXAS MATERIALS GROUP, INC. | +13.7% | 2 |
| Jun 6, 2024 | 0045-19-064F 2B24(099) | Grayson Paris |
PREVENTIVE MAINTENANCEUS 82 · | $7,711,250 | $10,591,400 | OVERLAND CORPORATION | +37.4% | 4 |
| Jun 6, 2024 | 0053-10-047C 53-10-47 | Scurry Abilene |
RESURFACE ROADWAYUS 84 · | $9,703,227 | $9,325,297 | RK HALL, LLC | -3.9% | 3 |
| Jun 6, 2024 | 0915-00-270F 2B24(173) | Bexar San Antonio |
BRIDGE MAINTENANCEVA · | $10,320,441 | $9,168,264 | RELMCO, INC. | -11.2% | 5 |
| Jun 6, 2024 | 0047-07-243STP 2B24(162)VRU | Dallas Dallas |
TRAFFIC SIGNAL IMPROVEMENTSUS 75 · | $8,437,425 | $8,247,830 | DURABLE SPECIALTIES, INC. | -2.2% | 4 |
| Jun 6, 2024 | 0094-02-137C 94-2-137 | Tarrant Fort Worth |
RECONSTRUCT EXISTING ROADWAYSH 183 · | $8,781,877 | $8,095,510 | JAGOE-PUBLIC COMPANY | -7.8% | 4 |
| Jun 6, 2024 | 0196-03-294F 2B24(167) | Dallas Dallas |
DRAINAGE IMPROVEMENTSIH 35E · | $6,699,769 | $8,080,872 | FNH CONSTRUCTION, LLC | +20.6% | 2 |
| Jun 6, 2024 | 0081-02-077C 81-2-77 | Tarrant Fort Worth |
PREVENTIVE MAINTENANCEUS 377 · | $8,479,225 | $7,770,211 | JAGOE-PUBLIC COMPANY | -8.4% | 2 |
| Jun 6, 2024 | 0043-09-146F 2B24(125) | Wichita Wichita Falls |
SURFACING/ROADWAY RESTORATIONUS 287 · | $6,480,380 | $7,338,061 | ZACK BURKETT CO. | +13.2% | 3 |
| Jun 6, 2024 | 0848-04-052F 2B24(170) | Medina San Antonio |
REHABILITATE EXISTING ROADWAYFM 462 · | $9,823,332 | $6,964,197 | SALINAS CONSTRUCTION TECHNOLOGIES, LTD. | -29.1% | 8 |
| Jun 6, 2024 | 6463-51-001RMC - 646351001 | Harris Houston |
TOTAL MAINTENANCEIH 610 · | $7,600,852 | $6,910,200 | HAZMAT INTERNATIONAL, INC. | -9.1% | 4 |
| Jun 6, 2024 | 0724-02-020BR 2B24(133) | Bosque Waco |
REPLACE BRIDGE AND APPROACHESFM 219 · | $7,591,387 | $6,464,517 | KNIFE RIVER CORPORATION - SOUTH | -14.8% | 4 |
| Jun 6, 2024 | 0226-05-072F 2B24(155) | Deaf Smith Amarillo |
CONSTRUCT PEDESTRIAN INFRASTRUCTUREUS 385 · | $6,151,364 | $5,281,885 | TI-ZACK CONCRETE, LLC | -14.1% | 4 |
| Jun 6, 2024 | 0265-04-075C 265-4-75 | Bastrop Austin |
PREVENTIVE MAINTENANCESH 21 · | $4,560,683 | $4,578,078 | LONE STAR PAVING COMPANY | +0.4% | 4 |
| Jun 6, 2024 | 6462-94-001MMC - 646294001 | Henderson Tyler |
HERBICIDE/INSECTICIDESH 31 · | $5,142,078 | $4,115,798 | NUTRIEN AG SOLUTIONS, INC. | -20.0% | 3 |
| Jun 6, 2024 | 2121-03-171C 2121-3-171 | El Paso El Paso |
LANDSCAPE DEVELOPMENTIH 10 · | $4,073,244 | $4,052,804 | EL PASO A.R.C. ELECTRIC, INC. | -0.5% | 6 |
| Jun 6, 2024 | 2662-03-003STP 2B24(159)HES | Angelina Lufkin |
HAZARD ELIMINATION & SAFETYFM 3124 · | $3,405,139 | $3,926,437 | PINTO CONSTRUCTION CO., INC. | +15.3% | 2 |
| Jun 6, 2024 | 0096-10-028F 2B24(109) | Harrison Atlanta |
RESURFACE ROADWAYUS 80 · | $4,161,642 | $3,801,386 | MADDEN CONTRACTING COMPANY, LLC. | -8.7% | 3 |
| Jun 6, 2024 | 0915-00-263F 2B24(171) | Bexar San Antonio |
PREVENTIVE MAINTENANCEVA · | $5,347,001 | $3,699,237 | STRIPE-A-ZONE, LLC | -30.8% | 7 |
| Jun 6, 2024 | 6462-93-001MMC - 646293001 | Garza Maintenance Division |
HERBICIDE/INSECTICIDEUS 84 · | $4,222,026 | $3,433,047 | NUTRIEN AG SOLUTIONS, INC. | -18.7% | 3 |
| Jun 6, 2024 | 0979-01-027STP 2B23(207)TAPS | Galveston Houston |
CONSTRUCT PEDESTRIAN INFRASTRUCTUREFM 519 · | $3,617,842 | $3,290,125 | SER CONSTRUCTION PARTNERS, LLC | -9.1% | 6 |
| Jun 6, 2024 | 0902-90-019BR 2018(804) | Tarrant Fort Worth |
REHABILITATE BRIDGECS · | $2,637,352 | $3,188,000 | RAGLE CONSTRUCTION, INC. | +20.9% | 2 |
| Jun 6, 2024 | 0001-02-079F 2B24(194) | El Paso El Paso |
HAZARD ELIMINATION & SAFETYSH 20 · | $3,619,662 | $2,966,194 | TRI STATE ELECTRIC, LTD. | -18.1% | 2 |
| Jun 6, 2024 | 0907-00-229F 2B24(130) | Tom Green San Angelo |
CONSTRUCT PEDESTRIAN INFRASTRUCTUREVA · | $3,106,523 | $2,856,079 | RELMCO, INC. | -8.1% | 3 |
| Jun 6, 2024 | 0091-09-017C 91-9-17 | Collin Dallas |
REHABILITATE EXISTING ROADWAYBS 289C · | $2,326,392 | $2,843,505 | JAGOE-PUBLIC COMPANY | +22.2% | 3 |
| Jun 6, 2024 | 6462-95-001MMC - 646295001 | Guadalupe San Antonio |
HERBICIDE/INSECTICIDEIH 10 · | $3,409,675 | $2,807,580 | NUTRIEN AG SOLUTIONS, INC. | -17.7% | 3 |
| Jun 6, 2024 | 0548-04-025BR 2B24(204) | Howard Abilene |
BRIDGE REPLACEMENTSH 176 · | $2,614,460 | $2,389,848 | TALBERT COMPANIES LLC | -8.6% | 5 |
| Jun 6, 2024 | 0904-00-223F 2B24(226) | Potter Amarillo |
INSTALL/REPLACE SIGNSVA · | $3,312,264 | $2,357,140 | HJC FARMS, INC. | -28.8% | 4 |
| Jun 6, 2024 | 6467-39-001RMC - 646739001 | Coryell Waco |
BASE FAILURE PAVEMENT REPAIRFM 107 · | $3,446,120 | $2,342,225 | KNIFE RIVER CORPORATION - SOUTH | -32.0% | 4 |
| Jun 6, 2024 | 0371-03-137STP 2B24(151)HES | Refugio Corpus Christi |
HAZARD ELIMINATION & SAFETYUS 77 · | $3,555,675 | $2,270,268 | SCR CIVIL CONSTRUCTION, LLC | -36.2% | 4 |
| Jun 6, 2024 | 0039-04-132C 39-4-132 | Hidalgo Pharr |
HAZARD ELIMINATION & SAFETYBU 83-S · | $2,316,846 | $2,248,364 | TRAF-TEX, INC. | -3.0% | 3 |
| Jun 6, 2024 | 6467-43-001RMC - 646743001 | McLennan Waco |
BASE FAILURE PAVEMENT REPAIRFM 1695 · | $3,036,682 | $2,169,039 | BIG CREEK CONSTRUCTION, LTD. | -28.6% | 4 |
| Jun 6, 2024 | 0167-02-081STP 2B24(186)VRU | El Paso El Paso |
HAZARD ELIMINATION & SAFETYBU 54-A · | $2,486,329 | $2,059,372 | TRI STATE ELECTRIC, LTD. | -17.2% | 2 |
| Jun 6, 2024 | 1087-01-018STP 2B24(258)HRR | Jim Wells Corpus Christi |
WIDEN ROAD - ADD SHOULDERSFM 738 · | $2,986,345 | $1,993,022 | CLARK CONSTRUCTION OF TEXAS, INC. | -33.3% | 7 |
| Jun 6, 2024 | 0902-90-214STP 2B24(141)VRU | Tarrant Fort Worth |
INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT TCS · | $1,728,955 | $1,933,735 | RAGLE CONSTRUCTION, INC. | +11.8% | 4 |
| Jun 6, 2024 | 0908-00-125C 908-00-125 | Taylor Abilene |
INSTALL/REPLACE SIGNSVA · | $2,210,281 | $1,794,698 | HJC FARMS, INC. | -18.8% | 3 |
| Jun 6, 2024 | 6459-39-001RMC - 645939001 | Lubbock Lubbock |
CLEANING AND SWEEPING HIGHWAYSIH 27 · | $503,823 | $1,785,912 | BARRICADES UNLIMITED | +254.5% | 1 |
| Jun 6, 2024 | 6447-58-001BPM - 644758001 | Lubbock Lubbock |
BRIDGE PREVENTATIVE MAINTENANCEIH 27 · | $1,892,751 | $1,699,846 | ICOS MANAGEMENT, LLC | -10.2% | 5 |
| Jun 6, 2024 | 6457-09-001RMC - 645709001 | Harris Houston |
SWEEPING AND DEBRIS REMOVALIH 69 · | $2,016,709 | $1,690,158 | DIGG COMMERCIAL, LLC | -16.2% | 4 |
| Jun 6, 2024 | 3417-02-038STP 2B24(121)HES | Williamson Austin |
HIGHWAY IMPROVEMENTFM 734 · | $1,758,957 | $1,681,925 | DAN WILLIAMS COMPANY | -4.4% | 7 |
| Jun 6, 2024 | 6446-70-001RMC - 644670001 | Brazoria Houston |
FLEXIBLE PAVEMENT STRUCTURE REPAIRSH 288 · | $1,824,633 | $1,651,616 | RHINO EQUITY, LLC | -9.5% | 4 |
| Jun 6, 2024 | 6454-51-001BPM - 645451001 | Travis Austin |
BRIDGE PREVENTATIVE MAINTENANCESH 130 · | $2,598,941 | $1,387,051 | AARON CONCRETE CONTRACTORS, LLC | -46.6% | 10 |
| Jun 6, 2024 | 6467-42-001RMC - 646742001 | Hill Waco |
BASE FAILURE PAVEMENT REPAIRSH 174 · | $1,711,110 | $1,363,883 | KNIFE RIVER CORPORATION - SOUTH | -20.3% | 4 |
| Jun 6, 2024 | 6464-82-001BPM - 646482001 | Comanche Brownwood |
BRIDGE PREVENTATIVE MAINTENANCEFM 1476 · | $1,004,351 | $1,359,303 | ICOS MANAGEMENT, LLC | +35.3% | 6 |
| Jun 6, 2024 | 0916-00-281STP 2B24(265)HES | Nueces Corpus Christi |
INSTALL/REPLACE SIGNSVA · | $1,549,990 | $1,347,670 | MALDONADO-BURKETT, LLP | -13.1% | 7 |
| Jun 6, 2024 | 0049-08-078C 49-8-78 | Robertson Bryan |
INTERSECTION IMPROVEMENTUS 190 · | $1,335,987 | $1,275,457 | BRAZOS PAVING, INC. | -4.5% | 4 |
| Jun 6, 2024 | 6464-34-001RMC - 646434001 | El Paso El Paso |
METAL BEAM GUARD FENCE REPAIRIH 10 · | $1,201,280 | $1,093,899 | APACHE BARRICADE & SIGN | -8.9% | 2 |
| Jun 6, 2024 | 0038-01-097STP 2B24(152)HES | Webb Laredo |
HAZARD ELIMINATION & SAFETYUS 83 · | $1,253,356 | $1,040,125 | HJC FARMS, INC. | -17.0% | 4 |
1–100 of 236Next ›
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.