| 1 | 110-6002 |
EXCAVATION (CHANNEL) | 70 | CY |
$133.25 |
$120.00 |
$125.64 |
$50.00 |
$50.00 |
$130.00 |
$150.00 |
| 2 | 401-6001 |
FLOWABLE BACKFILL | 51.5 | CY |
$341.33 |
$800.00 |
$1,721.38 |
$1,000.00 |
$350.00 |
$1,600.00 |
$1,500.00 |
| 3 | 403-6001 |
TEMPORARY SPL SHORING | 442.5 | SF |
$124.00 |
$1.00 |
$53.38 |
$100.00 |
$85.00 |
$210.00 |
$100.00 |
| 4 | 420-6057 |
CL C CONC (WINGWALLS) | 35 | CY |
$800.00 |
$4,000.00 |
$3,024.28 |
$1,500.00 |
$2,000.00 |
$3,800.00 |
$5,000.00 |
| 5 | 420-6158 |
CL C CONC(PILE ENCASEMENT) | 20 | LF |
$1,200.00 |
$2,000.00 |
$1,563.44 |
$1,200.00 |
$2,000.00 |
$1,300.00 |
$2,500.00 |
| 6 | 428-6001 |
PENETRATING CONCRETE SURFACE TREATMENT | 77 | SY |
$25.63 |
$150.00 |
$290.01 |
$15.00 |
$25.00 |
$760.00 |
$20.00 |
| 7 | 429-6001 |
CONC STR REPAIR(CLEAN & COAT WTH EPOXY) | 409.5 | SF |
$51.25 |
$250.00 |
$69.03 |
$300.00 |
$250.00 |
$225.00 |
$350.00 |
| 8 | 429-6007 |
CONC STR REPAIR (VERTICAL & OVERHEAD) | 369 | SF |
$250.10 |
$300.00 |
$365.11 |
$250.00 |
$250.00 |
$310.00 |
$350.00 |
| 9 | 429-6023 |
CONC STR REPAIR (PAN GIRDER HOLE REPR) | 64 | EA |
$51.25 |
$250.00 |
$102.67 |
$5.00 |
$2,500.00 |
$300.00 |
$500.00 |
| 10 | 432-6031 |
RIPRAP (STONE PROTECTION)(12 IN) | 29 | CY |
$192.70 |
$240.00 |
$689.85 |
$1,000.00 |
$165.00 |
$320.00 |
$500.00 |
| 11 | 432-6035 |
RIPRAP (STONE PROTECTION)(24 IN) | 227 | CY |
$192.70 |
$300.00 |
$468.54 |
$1,000.00 |
$250.00 |
$320.00 |
$500.00 |
| 12 | 432-6037 |
RIPRAP (STONE PROTECTION) (36 IN) | 181 | CY |
$194.75 |
$360.00 |
$475.53 |
$1,000.00 |
$350.00 |
$320.00 |
$500.00 |
| 13 | 438-6002 |
CLEANING AND SEALING EXIST JOINTS(CL3) | 1,351.5 | LF |
$51.25 |
$90.00 |
$54.03 |
$45.00 |
$100.00 |
$60.00 |
$85.00 |
| 14 | 438-6008 |
CLEANING AND SEALING JOINTS (CL 7) | 128.5 | LF |
$51.25 |
$80.00 |
$51.79 |
$45.00 |
$100.00 |
$80.00 |
$85.00 |
| 15 | 480-6002 |
CLEAN EXIST CULVERTS | 311 | CY |
$133.25 |
$150.00 |
$311.22 |
$150.00 |
$100.00 |
$215.00 |
$250.00 |
| 16 | 500-6001 |
MOBILIZATION | 1 | LS |
$87,022.03 |
$150,000.00 |
$144,533.12 |
$130,000.00 |
$160,000.00 |
$173,000.00 |
$160,000.00 |
| 17 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 | MO |
$2,000.00 |
$6,000.00 |
$25,821.63 |
$10,000.00 |
$15,000.00 |
$31,000.00 |
$3,500.00 |
| 18 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 2,200 | LF |
$4.00 |
$5.00 |
$2.68 |
$17.00 |
$4.00 |
$6.00 |
$5.00 |
| 19 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 2,200 | LF |
$2.00 |
$2.00 |
$1.00 |
$2.00 |
$2.00 |
$2.00 |
$2.00 |
| 20 | 776-6053 |
REPLACE (STEEL RAIL) | 90 | LF |
$615.00 |
$250.00 |
$286.81 |
$300.00 |
$250.00 |
$350.00 |
$1,500.00 |
| 21 | 778-6076 |
CONCRETE RAIL REPLACEMENT (IN-KIND) | 8.75 | LF |
$100.00 |
$600.00 |
$1,340.39 |
$2,500.00 |
$1,000.00 |
$4,200.00 |
$250.00 |
| 22 | 780-6001 |
CNC CRACK REPAIR (DISCRETE)(GRAVITY) | 30 | LF |
$33.83 |
$100.00 |
$103.08 |
$75.00 |
$100.00 |
$120.00 |
$10.00 |
| 23 | 780-6002 |
CNC CRACK REPAIR (DISCRETE)(INJECT) | 176 | LF |
$33.83 |
$150.00 |
$124.88 |
$75.00 |
$100.00 |
$155.00 |
$125.00 |
| 24 | 784-6002 |
REP STL BRIDGE MEMBER (BEAM) | 2 | EA |
$150.00 |
$9,000.00 |
$3,888.51 |
$35,000.00 |
$35,000.00 |
$5,000.00 |
$15,000.00 |
| 25 | 785-6006 |
BRIDGE JOINT REPAIR (HEADER) | 26 | LF |
$256.25 |
$800.00 |
$290.39 |
$500.00 |
$500.00 |
$700.00 |
$250.00 |
| 26 | 4207-6001 |
STEEL BRIDGE ZONE PAINTING REF STR #1 | 1 | EA |
$33,971.43 |
$40,000.00 |
$23,312.42 |
$24,000.00 |
$40,000.00 |
$31,500.00 |
$30,000.00 |
| 27 | 4207-6002 |
STEEL BRIDGE ZONE PAINTING REF STR #2 | 1 | EA |
$3,662.67 |
$10,000.00 |
$8,612.42 |
$7,200.00 |
$40,000.00 |
$15,000.00 |
$12,000.00 |
| 28 | 4207-6003 |
STEEL BRIDGE ZONE PAINTING REF STR #3 | 1 | EA |
$118,080.00 |
$50,000.00 |
$47,012.42 |
$48,000.00 |
$60,000.00 |
$55,100.00 |
$50,000.00 |
| 29 | 4207-6004 |
STEEL BRIDGE ZONE PAINTING REF STR #4 | 1 | EA |
$33,971.43 |
$25,000.00 |
$23,312.42 |
$24,000.00 |
$40,000.00 |
$31,500.00 |
$25,000.00 |
| 30 | 4207-6005 |
STEEL BRIDGE ZONE PAINTING REF STR #5 | 1 | EA |
$33,971.43 |
$25,000.00 |
$23,312.42 |
$24,000.00 |
$40,000.00 |
$31,500.00 |
$25,000.00 |
| 31 | 4207-6006 |
STEEL BRIDGE ZONE PAINTING REF STR #6 | 1 | EA |
$33,971.43 |
$15,000.00 |
$13,412.42 |
$14,400.00 |
$25,000.00 |
$22,000.00 |
$18,000.00 |
| 32 | 4207-6007 |
STEEL BRIDGE ZONE PAINTING REF STR #7 | 1 | EA |
$33,971.43 |
$30,000.00 |
$23,312.42 |
$24,000.00 |
$25,000.00 |
$31,500.00 |
$25,000.00 |
| 33 | 4207-6008 |
STEEL BRIDGE ZONE PAINTING REF STR #8 | 1 | EA |
$33,971.43 |
$15,000.00 |
$13,412.42 |
$14,400.00 |
$30,000.00 |
$22,000.00 |
$16,000.00 |
| 34 | 4207-6009 |
STEEL BRIDGE ZONE PAINTING REF STR #9 | 1 | EA |
$33,971.43 |
$40,000.00 |
$26,812.42 |
$33,600.00 |
$40,000.00 |
$41,000.00 |
$35,000.00 |
| 35 | 4207-6010 |
STEEL BRIDGE ZONE PAINTING REF STR #10 | 1 | EA |
$3,662.67 |
$10,000.00 |
$9,332.42 |
$9,600.00 |
$20,000.00 |
$17,000.00 |
$15,000.00 |
| 36 | 4207-6011 |
STEEL BRIDGE ZONE PAINTING REF STR #11 | 1 | EA |
$3,662.67 |
$5,000.00 |
$9,812.42 |
$9,600.00 |
$20,000.00 |
$17,000.00 |
$15,000.00 |
| 37 | 6001-6001 |
PORTABLE CHANGEABLE MESSAGE SIGN | 9 | DAY |
$500.00 |
$500.00 |
$466.66 |
$1,000.00 |
$150.00 |
$300.00 |
$75.00 |
| 38 | 6185-6002 |
TMA (STATIONARY) | 115 | DAY |
$1.00 |
$100.00 |
$362.90 |
$450.00 |
$250.00 |
$400.00 |
$250.00 |
| 39 | 7000-6001 |
REML & DISPL DRIFTWOOD & DEBRIS | 3.5 | CY |
$90.20 |
$1,000.00 |
$1,397.67 |
$2,500.00 |
$1,000.00 |
$375.00 |
$500.00 |