126Let jobs
$685,556,088Total low bids
$675,179,812Total estimates
+1.5%Low bids vs estimates
Sep 2023 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Sep 27, 2023 | 6451-27-001RMC - 645127001 | Concho San Angelo |
SKID RESTORATION (NON-REHAB)US 87 · | $297,517 | $369,716 | TRP CONSTRUCTION GROUP, LLC | +24.3% | 1 |
| Sep 27, 2023 | 6443-64-001RMC - 644364001 | Shelby Lufkin |
TREE TRIMMINGSH 7 · | $234,300 | $191,500 | K & R CONTRACTORS | -18.3% | 4 |
| Sep 27, 2023 | 6443-20-001RMC - 644320001 | Shelby Lufkin |
METAL BEAM GUARD FENCE REPAIRUS 96 · | $230,080 | $168,134 | ACE CONTRACTORS, INC. | -26.9% | 2 |
| Sep 7, 2023 | 0168-08-075F 2024(033) | Randall Amarillo |
REHABILITATE EXISTING ROADWAYUS 60 · | $40,452,690 | $34,924,134 | DUININCK, INC. | -13.7% | 4 |
| Sep 7, 2023 | 0072-05-089F 2024(004) | Kendall San Antonio |
RESURFACE ROADWAYIH 10 · | $30,111,804 | $26,085,495 | TEXAS MATERIALS GROUP, INC. | -13.4% | 6 |
| Sep 7, 2023 | 0228-01-056NH 2017(462) | Terry Lubbock |
SURFACING/ROADWAY RESTORATIONUS 62 · | $24,156,432 | $22,784,907 | JAMES HAMILTON CONSTRUCTION CO. | -5.7% | 3 |
| Sep 7, 2023 | 0650-03-036F 2B23(225) | Runnels San Angelo |
REHABILITATE EXISTING ROADWAY / BRIDGE REPLACEMENTSH 153 · | $22,151,443 | $21,350,245 | RK HALL, LLC | -3.6% | 3 |
| Sep 7, 2023 | 0002-10-039F 2024(040) | Hudspeth El Paso |
PREVENTIVE MAINTENANCEIH 10 · | $18,263,528 | $18,357,209 | DAN WILLIAMS COMPANY | +0.5% | 2 |
| Sep 7, 2023 | 0183-02-028F 2024(012) | Hamilton Waco |
REHAB RDWY TO ADD PASS LNSSH 36 · | $16,703,962 | $18,187,374 | BIG CREEK CONSTRUCTION, LTD. | +8.9% | 4 |
| Sep 7, 2023 | 1322-02-017F 2024(023) | Van Zandt Tyler |
REHABILITATE EXISTING ROADWAYFM 1255 · | $22,915,167 | $17,084,796 | REYNOLDS & KAY, LTD. | -25.4% | 3 |
| Sep 7, 2023 | 0140-01-081F 2024(017) | Pecos Odessa |
FY 2024 SEAL COAT - CRUMB RUBBERIH 10 · | $13,705,923 | $14,363,578 | COX PAVING OF TEXAS, INC. | +4.8% | 2 |
| Sep 7, 2023 | 0292-04-072F 2024(005) | Ward Odessa |
FY 2024 SEAL COATSH 18 · | $12,777,878 | $13,110,325 | RONALD R. WAGNER & CO., LP | +2.6% | 4 |
| Sep 7, 2023 | 0006-04-080F 2024(063) | Taylor Abilene |
PREVENTIVE MAINTENANCEIH 20 · | $14,104,195 | $12,105,732 | FOUTSCO PAVING COMPANY, LLC | -14.2% | 3 |
| Sep 7, 2023 | 1228-03-051C 1228-3-51 | Hidalgo Pharr |
REHABILITATE EXISTING ROADWAYFM 1015 · | $13,846,020 | $11,217,266 | TEXAS CORDIA CONSTRUCTION, LLC | -19.0% | 4 |
| Sep 7, 2023 | 0265-14-012BR 2024(013) | Fayette Yoakum |
BRIDGE MAINTENANCEBS 71-E · | $6,746,673 | $8,209,128 | CEKRA INC. | +21.7% | 4 |
| Sep 7, 2023 | 0039-18-123F 2024(007) | Hidalgo Pharr |
PREVENTIVE MAINTENANCEIH 2 · | $6,129,862 | $6,490,669 | RONALD R. WAGNER & CO., LP | +5.9% | 3 |
| Sep 7, 2023 | 0074-04-047F 2024(046) | San Patricio Corpus Christi |
REHABILITATE EXISTING ROADWAYIH 37 · | $8,640,577 | $6,031,422 | BRANNAN PAVING CO., LTD. | -30.2% | 7 |
| Sep 7, 2023 | 1200-04-016BR 2024(026) | Williamson Austin |
BRIDGE REPLACEMENTFM 1466 · | $3,834,661 | $5,546,235 | JOE BLAND CONSTRUCTION, L.P. | +44.6% | 4 |
| Sep 7, 2023 | 6443-42-001RMC - 644342001 | Starr Pharr |
SEAL COATFM 2686 · | $4,505,389 | $4,902,372 | RONALD R. WAGNER & CO., LP | +8.8% | 3 |
| Sep 7, 2023 | 0684-01-073F 2024(006) | Cameron Pharr |
PREVENTIVE MAINTENANCEFM 511 · | $3,455,095 | $4,012,544 | BRANNAN PAVING CO., LTD. | +16.1% | 3 |
| Sep 7, 2023 | 0912-31-323BR 2022(986) | Brazoria Houston |
BRIDGE REPLACEMENTCR · | $3,999,103 | $3,799,247 | MAIN LANE INDUSTRIES LTD. | -5.0% | 3 |
| Sep 7, 2023 | 0334-05-035F 2024(028) | Lee Austin |
SEAL COATFM 141 · | $2,579,765 | $3,387,874 | TEXAS MATERIALS GROUP, INC. | +31.3% | 3 |
| Sep 7, 2023 | 0112-03-036F 2024(027) | Gillespie Austin |
SEAL COATUS 290 · | $3,583,410 | $3,070,930 | ALLEN KELLER COMPANY | -14.3% | 4 |
| Sep 7, 2023 | 0367-07-009BR 2023(926) | Galveston Houston |
BRIDGE REPLACEMENTSL 108 · | $1,773,346 | $2,472,329 | JOHN REED AND COMPANY, LLC | +39.4% | 2 |
| Sep 7, 2023 | 0901-32-103BR 2022(463) | Fannin Paris |
BRIDGE REPLACEMENTCR · | $2,163,992 | $2,295,795 | THK CONSTRUCTION LLC | +6.1% | 6 |
| Sep 7, 2023 | 6408-83-001MMC - 640883001 | Blanco Austin |
HOT-MIX COLD-LAIDUS 281 · | $2,449,200 | $2,266,800 | MALBEC MATERIALS LLC | -7.4% | 4 |
| Sep 7, 2023 | 0114-10-104BR 2B23(191) | Washington Bryan |
BRIDGE MAINTENANCEUS 290 · | $3,030,226 | $2,162,427 | MAIN LANE INDUSTRIES LTD. | -28.6% | 6 |
| Sep 7, 2023 | 0747-03-082F 2024(056) | Tarrant Fort Worth |
INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFTFM 157 · | $1,910,571 | $2,090,442 | RAGLE CONSTRUCTION, INC. | +9.4% | 3 |
| Sep 7, 2023 | 0163-03-052F 2024(024) | Henderson Tyler |
RESURFACE ROADWAYSH 31 · | $2,105,493 | $2,061,802 | BAKER & COMPANY CONSTRUCTION, LLC | -2.1% | 4 |
| Sep 7, 2023 | 6447-73-001MMC - 644773001 | Grayson Paris |
AGGREGATEUS 75 · | $1,711,550 | $2,055,511 | RK HALL, LLC | +20.1% | 1 |
| Sep 7, 2023 | 6438-66-001RMC - 643866001 | Tarrant Fort Worth |
SWEEPING AND DEBRIS REMOVALIH 30 · | $2,459,218 | $1,967,826 | DIGG COMMERCIAL, LLC | -20.0% | 2 |
| Sep 7, 2023 | 0912-34-185C 912-34-185 | Fort Bend Houston |
SURFACING/ROADWAY RESTORATIONPR 72 · | $1,926,229 | $1,866,653 | FORDE CONSTRUCTION COMPANY, INC. | -3.1% | 3 |
| Sep 7, 2023 | 2210-01-008C 2210-1-8 | Travis Austin |
SEAL COATRM 2322 · | $1,151,277 | $1,340,429 | TEXAS MATERIALS GROUP, INC. | +16.4% | 3 |
| Sep 7, 2023 | 6445-23-001RMC - 644523001 | Dallas Dallas |
CRASH CUSHION ATTENUATOR REPAIRSL 12 · | $2,874,600 | $1,253,756 | ROSS SA ENTERPRISE LLC | -56.4% | 2 |
| Sep 7, 2023 | 6439-64-001RMC - 643964001 | Potter Amarillo |
CRACK SEALIH 40 · | $1,339,817 | $1,224,880 | D & M CONTRACTORS, LLC | -8.6% | 2 |
| Sep 7, 2023 | 6437-89-001RMC - 643789001 | Denton Dallas |
CABLE BARRIER REPAIRFM 2499 · | $2,443,641 | $1,197,494 | ROSS SA ENTERPRISE LLC | -51.0% | 3 |
| Sep 7, 2023 | 6448-11-001RMC - 644811001 | Lubbock Lubbock |
METAL BEAM GUARD FENCE REPAIRIH 27 · | $1,303,000 | $1,048,565 | ROSS SA ENTERPRISE LLC | -19.5% | 4 |
| Sep 7, 2023 | 0287-01-017BR 2024(030) | Caldwell Austin |
BRIDGE MAINTENANCESH 80 · | $1,275,737 | $1,012,429 | GIBSON & ASSOCIATES, INC. | -20.6% | 7 |
| Sep 7, 2023 | 0914-04-288C 914-4-288 | Travis Austin |
STATE PARK IMPROVEMENTSVA · | $778,288 | $971,504 | FNH CONSTRUCTION, LLC | +24.8% | 2 |
| Sep 7, 2023 | 6451-39-001RMC - 645139001 | Wichita Wichita Falls |
CRACK SEALUS 287 · | $648,056 | $930,730 | D & M CONTRACTORS, LLC | +43.6% | 1 |
| Sep 7, 2023 | 6446-12-001MMC - 644612001 | Brewster El Paso |
LIMESTONE ROCK ASPHALTFM 170 · | $939,100 | $799,135 | VULCAN CONSTRUCTION MATERIALS, LLC | -14.9% | 2 |
| Sep 7, 2023 | 6444-08-001RMC - 644408001 | Brewster El Paso |
CULVERT CLEANINGUS 90 · | $772,130 | $711,600 | E.V.G. ENTERPRISE | -7.8% | 2 |
| Sep 7, 2023 | 6451-65-001RMC - 645165001 | Live Oak Corpus Christi |
MOWING HIGHWAY RIGHT OF WAYIH 37 · | $831,470 | $702,854 | R&M INCORPORATED | -15.5% | 3 |
| Sep 7, 2023 | 6453-13-001MMC - 645313001 | Newton Beaumont |
EMULSIONFM 1415 · | $699,240 | $696,110 | CLEVELAND ASPHALT PRODUCTS, INC. | -0.4% | 2 |
| Sep 7, 2023 | 0205-07-080F 2024(025) | Anderson Tyler |
RESURFACE ROADWAYUS 79 · | $495,350 | $664,721 | FNH CONSTRUCTION, LLC | +34.2% | 3 |
| Sep 7, 2023 | 0911-00-116BR 2B23(192) | Angelina Lufkin |
BRIDGE MAINTENANCEVA · | $744,361 | $644,360 | GARRET SHIELDS INFRASTRUCTURE | -13.4% | 4 |
| Sep 7, 2023 | 6451-37-001RMC - 645137001 | Angelina Lufkin |
REFLECTIVE PAVEMENT MARKINGS (LONG LINE)US 59 · | $523,800 | $399,400 | BATTERSON, LLP | -23.7% | 7 |
| Sep 7, 2023 | 6450-39-001RMC - 645039001 | Ector Odessa |
CLEANING AND SWEEPING HIGHWAYSIH 20 · | $353,781 | $389,412 | J-MEN CONCRETE CONSTRUCTION | +10.1% | 2 |
| Sep 7, 2023 | 0013-10-091F 2023(972) | Tarrant Fort Worth |
LANDSCAPE DEVELOPMENTBU 287P · | $360,609 | $307,805 | TIGHT LINE CONSTRUCTION, LLC | -14.6% | 5 |
| Sep 7, 2023 | 6444-84-001RMC - 644484001 | Dallas Dallas |
TRAFFIC CONTROL SERVICESIH 35E · | $373,750 | $298,125 | AWP SAFETY | -20.2% | 5 |
| Sep 7, 2023 | 6448-13-001RMC - 644813001 | Hale Lubbock |
METAL BEAM GUARD FENCE REPAIRIH 27 · | $422,375 | $249,070 | BK FIELD OPERATIONS LLC | -41.0% | 4 |
| Sep 7, 2023 | 6444-66-001TMC - 644466001 | Guadalupe San Antonio |
DELINEATORSSH 46 · | $129,107 | $136,928 | CENTERLINE SUPPLY, INC. | +6.1% | 1 |
| Sep 7, 2023 | 6444-68-001TMC - 644468001 | Garza Maintenance Division |
DELINEATORSUS 84 · | $132,350 | $131,025 | CENTERLINE SUPPLY, INC. | -1.0% | 1 |
| Sep 7, 2023 | 6444-64-001TMC - 644464001 | Henderson Tyler |
DELINEATORSSH 31 · | $162,602 | $131,004 | CENTERLINE SUPPLY, INC. | -19.4% | 1 |
| Sep 6, 2023 | 0200-08-049C 200-8-49 | Tyler Beaumont |
WIDEN ROAD - ADD LANESUS 69 · | $158,459,712 | $205,416,130 | PULICE CONSTRUCTION, INC. | +29.6% | 4 |
| Sep 6, 2023 | 0028-06-087F 2024(034) | Jefferson Beaumont |
SEAL COATUS 90 · | $16,521,800 | $13,998,169 | CLARK CONSTRUCTION OF TEXAS, INC. | -15.3% | 1 |
| Sep 6, 2023 | 2139-04-023F 2024(044) | Hunt Paris |
ADDING SHOULDERS WITH NO ADDED CAPACITYSH 11 · | $10,881,647 | $11,405,903 | D. L. LENNON INCORPORATED - CONTRACTOR | +4.8% | 3 |
| Sep 6, 2023 | 2005-02-017F 2023(304) | Ector Odessa |
HIGHWAY IMPROVEMENTFM 1882 · | $11,667,891 | $10,165,599 | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | -12.9% | 4 |
| Sep 6, 2023 | 0160-05-049F 2024(060) | Val Verde Laredo |
SEAL COATUS 277 · | $11,697,332 | $9,710,711 | RONALD R. WAGNER & CO., LP | -17.0% | 4 |
| Sep 6, 2023 | 1228-03-050C 1228-3-50 | Hidalgo Pharr |
REHABILITATE EXISTING ROADWAYFM 1015 · | $8,607,824 | $8,435,309 | REIM CONSTRUCTION, INC. | -2.0% | 4 |
| Sep 6, 2023 | 0055-03-028F 2024(009) | Coryell Waco |
SEAL COATUS 84 · | $8,719,872 | $7,829,870 | COX PAVING OF TEXAS, INC. | -10.2% | 2 |
| Sep 6, 2023 | 0833-01-009F 2024(015) | Coryell Waco |
SEAL COATFM 217 · | $8,721,664 | $7,582,812 | BRANNAN PAVING CO., LTD. | -13.1% | 5 |
| Sep 6, 2023 | 1122-02-042F 2024(048) | Karnes Corpus Christi |
REHABILITATE EXISTING ROADWAYFM 887 · | $9,413,783 | $7,291,794 | BRANNAN PAVING CO., LTD. | -22.5% | 4 |
| Sep 6, 2023 | 0175-07-065F 2B23(190) | Nacogdoches Lufkin |
RESURFACE ROADWAYUS 59 · | $6,767,821 | $6,975,521 | TEXAS MATERIALS GROUP, INC. | +3.1% | 1 |
| Sep 6, 2023 | 1181-02-038F 2024(057) | Johnson Fort Worth |
RESURFACE ROADWAYFM 917 · | $6,239,059 | $6,838,229 | ED BELL CONSTRUCTION COMPANY | +9.6% | 3 |
| Sep 6, 2023 | 0165-01-107F 2024(022) | Smith Tyler |
PREVENTIVE MAINTENANCESH 110 · | $5,785,892 | $6,495,390 | FNH CONSTRUCTION, LLC | +12.3% | 2 |
| Sep 6, 2023 | 0042-06-076F 2024(069) | Donley Childress |
HIGHWAY IMPROVEMENTUS 287 · | $6,658,833 | $6,446,301 | J. LEE MILLIGAN, INC. | -3.2% | 5 |
| Sep 6, 2023 | 0542-01-101F 2024(055) | Webb Laredo |
SEAL COATUS 59 · | $5,869,821 | $5,349,602 | RONALD R. WAGNER & CO., LP | -8.9% | 4 |
| Sep 6, 2023 | 3570-01-012F 2023(301) | Ector Odessa |
HIGHWAY IMPROVEMENTFM 3503 · | $4,903,870 | $5,107,417 | REECE ALBERT, INC. | +4.2% | 3 |
| Sep 6, 2023 | 0918-00-380F 2024(016) | Dallas Dallas |
INSTALL TRAFFIC SIGNALVA · | $3,900,000 | $4,157,640 | DURABLE SPECIALTIES, INC. | +6.6% | 2 |
| Sep 6, 2023 | 1096-01-068F 2024(036) | Hardin Beaumont |
SURFACING/ROADWAY RESTORATIONFM 770 · | $5,134,746 | $4,123,743 | VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC | -19.7% | 3 |
| Sep 6, 2023 | 2379-02-010C 2379-2-10 | Nolan Abilene |
REHABILITATE EXISTING ROADWAYFM 608 · | $3,586,299 | $4,084,995 | BONTKE BROTHERS CONSTRUCTION COMPANY | +13.9% | 2 |
| Sep 6, 2023 | 6450-75-001MMC - 645075001 | Jefferson Beaumont |
HOT MIXUS 69 · | $3,273,250 | $3,421,275 | TEXAS MATERIALS GROUP, INC. | +4.5% | 1 |
| Sep 6, 2023 | 6450-81-001MMC - 645081001 | Orange Beaumont |
HOT MIXFM 105 · | $3,055,000 | $3,211,500 | TEXAS MATERIALS GROUP, INC. | +5.1% | 1 |
| Sep 6, 2023 | 6433-10-001RMC - 643310001 | Tarrant Fort Worth |
FLEXIBLE PAVEMENT STRUCTURE REPAIRSH 121 · | $2,098,654 | $2,454,585 | FOUTSCO PAVING COMPANY, LLC | +17.0% | 5 |
| Sep 6, 2023 | 0005-01-116F 2023(303) | Ector Odessa |
HIGHWAY IMPROVEMENTBI 20-E · | $1,868,155 | $2,412,948 | FNH CONSTRUCTION, LLC | +29.2% | 2 |
| Sep 6, 2023 | 6445-29-001RMC - 644529001 | Harris Houston |
SWEEPING AND DEBRIS REMOVALUS 290 · | $2,761,136 | $2,399,332 | T & M LAWN-FENCE SERVICE, LLC | -13.1% | 4 |
| Sep 6, 2023 | 6439-28-001RMC - 643928001 | Erath Fort Worth |
MOWING HIGHWAY RIGHT OF WAYUS 377 · | $2,651,308 | $2,316,774 | T&L CLEANING SERVICES LLC | -12.6% | 1 |
| Sep 6, 2023 | 0050-03-114BR 2B23(226) | Grimes Bryan |
BRIDGE MAINTENANCESH 6 · | $2,808,333 | $2,245,312 | SCR CIVIL CONSTRUCTION, LLC | -20.0% | 6 |
| Sep 6, 2023 | 0245-01-037F 2024(038) | Van Zandt Tyler |
INSTALL TRAFFIC SIGNALSH 64 · | $1,653,300 | $2,231,132 | EAST TEXAS BRIDGE, INC. | +35.0% | 4 |
| Sep 6, 2023 | 0221-01-084F 2024(065) | Lamar Paris |
MAINTENANCE & OPERATIONS PROJECTUS 271 · | $2,399,103 | $2,221,279 | A. L. HELMCAMP, INC. | -7.4% | 4 |
| Sep 6, 2023 | 0027-07-046STP 2B23(203)HES | Fort Bend Houston |
HAZARD ELIMINATION & SAFETYUA 90 · | $2,347,572 | $1,998,146 | THIRD COAST SERVICES LLC | -14.9% | 3 |
| Sep 6, 2023 | 6445-21-001RMC - 644521001 | Dallas Dallas |
METAL BEAM GUARD FENCE REPAIRSL 12 · | $3,052,140 | $1,960,881 | FIREMAN EXCAVATING, INC. | -35.8% | 2 |
| Sep 6, 2023 | 0919-19-087STP 2022(679)TAPS | Bowie Atlanta |
BICYCLE AND PEDESTRIAN IMPROVEMENTS · | $1,969,249 | $1,958,509 | GARRET SHIELDS INFRASTRUCTURE | -0.5% | 3 |
| Sep 6, 2023 | 0140-02-050STP 2023(306)HES | Pecos Odessa |
INSTALL MEDIAN BARRIERIH 10 · | $2,084,200 | $1,938,518 | HJC FARMS, INC. | -7.0% | 4 |
| Sep 6, 2023 | 6439-78-001RMC - 643978001 | Wise Fort Worth |
FLEXIBLE PAVEMENT STRUCTURE REPAIRUS 81 · | $1,488,638 | $1,802,554 | PEACHTREE CONSTRUCTION, LTD. | +21.1% | 4 |
| Sep 6, 2023 | 6447-99-001RMC - 644799001 | Nueces Corpus Christi |
SWEEPING AND DEBRIS REMOVALUS 77 · | $3,001,171 | $1,669,000 | DIGG COMMERCIAL, LLC | -44.4% | 3 |
| Sep 6, 2023 | 2638-03-012F 2B23(258) | Callahan Abilene |
PREVENTIVE MAINTENANCESH 206 · | $1,871,987 | $1,595,478 | J. H. STRAIN & SONS, INC. | -14.8% | 4 |
| Sep 6, 2023 | 6427-65-001RMC - 642765001 | Hays Austin |
INSTALLATION OF TRAFFIC SIGNALSUS 290 · | $1,748,356 | $1,526,973 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | -12.7% | 3 |
| Sep 6, 2023 | 6436-03-001RMC - 643603001 | Harris Houston |
BRIDGE JOINT CLEANING AND SEALINGUS 290 · | $1,521,700 | $1,468,500 | ISI CONTRACTING, INC. | -3.5% | 5 |
| Sep 6, 2023 | 0913-00-116F 2024(051) | De Witt Yoakum |
HAZARD ELIMINATION & SAFETYVA · | $2,287,798 | $1,439,927 | HIGHWAY BARRICADES AND SERVICES, LLC | -37.1% | 6 |
| Sep 6, 2023 | 6451-73-001MMC - 645173001 | Tarrant Fort Worth |
WINTER WEATHER MATERIALIH 35W · | $1,326,460 | $1,321,451 | NSG LOGISTICS, LLC | -0.4% | 1 |
| Sep 6, 2023 | 6451-71-001MMC - 645171001 | Tarrant Fort Worth |
WINTER WEATHER MATERIALIH 35W · | $1,778,100 | $1,286,757 | THE BARGAIN SOURCE | -27.6% | 3 |
| Sep 6, 2023 | 0914-33-088STP 2022(313)TAPS | Hays Austin |
CONSTRUCT PEDESTRIAN INFRASTRUCTURECR · | $1,304,315 | $1,277,863 | D&S CONCRETE CONTRACTORS LLC | -2.0% | 9 |
| Sep 6, 2023 | 1027-01-023STP 2B23(176)HES | Eastland Brownwood |
WIDEN ROAD - ADD LANES AND SHOULDERSFM 570 · | $1,195,184 | $1,257,684 | JAY MILLS CONTRACTING, INCORPORATED | +5.2% | 2 |
| Sep 6, 2023 | 6439-52-001RMC - 643952001 | Nueces Corpus Christi |
HOT MIXFM 1889 · | $1,458,993 | $1,252,186 | ANDERSON COLUMBIA CO., INC. | -14.2% | 2 |
| Sep 6, 2023 | 6392-03-001RMC - 639203001 | Taylor Abilene |
ILLUMINATION MAINTENANCEIH 20 · | $856,925 | $1,122,220 | WG ENGINEERING & CONSTRUCTION, LLC | +31.0% | 1 |
| Sep 6, 2023 | 2121-02-162BR 2024(032) | El Paso El Paso |
BRIDGE REPLACEMENTIH 10 · | $1,092,016 | $960,423 | DAN WILLIAMS COMPANY | -12.1% | 3 |
| Sep 6, 2023 | 6444-62-001RMC - 644462001 | Dallas Dallas |
FLEXIBLE PAVEMENT STRUCTURE REPAIRUS 67 · | $980,980 | $906,441 | PEACHTREE CONSTRUCTION, LTD. | -7.6% | 3 |
| Sep 6, 2023 | 6447-24-001RMC - 644724001 | San Augustine Lufkin |
TRAFFIC CONTROL SERVICES - SAN AUGUSTINEUS 96 · | $1,051,743 | $893,039 | RHINO EQUITY, LLC | -15.1% | 4 |
1–100 of 126Next ›
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.