| 1 | 110-6001 |
EXCAVATION (ROADWAY) | 4,717 | CY |
$50.00 |
$15.00 |
$15.00 |
| 2 | 132-6008 |
EMBANKMENT (FINAL)(DENS CONT)(TY D) | 5,201 | CY |
$15.00 |
$20.00 |
$15.00 |
| 3 | 247-6041 |
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) | 6,629 | CY |
$75.00 |
$65.00 |
$45.00 |
| 4 | 251-6034 |
REWORK BS MTL (TY C) (8") (ORD COMP) | 62,663 | SY |
$2.00 |
$7.00 |
$5.00 |
| 5 | 275-6001 |
CEMENT | 1,218 | TON |
$250.00 |
$270.00 |
$340.00 |
| 6 | 275-6014 |
CEMENT TREAT (MX EXST MTL & NW BS)(8") | 81,016 | SY |
$2.50 |
$8.00 |
$6.00 |
| 7 | 310-6012 |
PRIME COAT (RC-250) | 20,255 | GAL |
$6.00 |
$8.50 |
$12.50 |
| 8 | 316-6001 |
ASPH (MULTI OPTION) | 34,038 | GAL |
$6.00 |
$9.50 |
$12.50 |
| 9 | 316-6017 |
ASPH (AC-20-5TR) | 32,417 | GAL |
$6.00 |
$10.00 |
$12.50 |
| 10 | 316-6177 |
AGGR(TY-B GR-5 SAC-B) | 651 | CY |
$165.00 |
$250.00 |
$175.00 |
| 11 | 316-6222 |
AGGR(TY-PB GR-3 SAC-B) | 708 | CY |
$175.00 |
$250.00 |
$175.00 |
| 12 | 316-6224 |
AGGR(TY-PB GR-4 SAC-B) | 651 | CY |
$165.00 |
$250.00 |
$175.00 |
| 13 | 462-6047 |
CONC BOX CULV (4 FT X 2 FT)(EXTEND) | 10 | LF |
$650.00 |
$2,000.00 |
$2,000.00 |
| 14 | 462-6050 |
CONC BOX CULV (5 FT X 2 FT)(EXTEND) | 8 | LF |
$750.00 |
$2,500.00 |
$2,500.00 |
| 15 | 462-6064 |
CONC BOX CULV (8 FT X 5 FT)(EXTEND) | 17 | LF |
$1,000.00 |
$3,000.00 |
$3,500.00 |
| 16 | 464-6005 |
RC PIPE (CL III)(24 IN) | 4 | LF |
$100.00 |
$250.00 |
$400.00 |
| 17 | 464-6008 |
RC PIPE (CL III)(36 IN) | 4 | LF |
$300.00 |
$250.00 |
$400.00 |
| 18 | 466-6182 |
WINGWALL (PW - 1) (HW=7 FT) | 2 | EA |
$65,000.00 |
$15,000.00 |
$85,000.00 |
| 19 | 467-6106 |
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C) | 2 | EA |
$4,000.00 |
$4,000.00 |
$15,000.00 |
| 20 | 467-6139 |
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C) | 4 | EA |
$4,500.00 |
$4,500.00 |
$16,000.00 |
| 21 | 467-6172 |
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C) | 2 | EA |
$6,000.00 |
$5,000.00 |
$17,000.00 |
| 22 | 467-6390 |
SET (TY II) (24 IN) (RCP) (4: 1) (C) | 2 | EA |
$1,800.00 |
$4,000.00 |
$2,000.00 |
| 23 | 467-6419 |
SET (TY II) (30 IN) (RCP) (4: 1) (C) | 2 | EA |
$2,400.00 |
$5,000.00 |
$2,500.00 |
| 24 | 467-6450 |
SET (TY II) (36 IN) (RCP) (4: 1) (C) | 2 | EA |
$3,600.00 |
$6,000.00 |
$3,000.00 |
| 25 | 500-6001 |
MOBILIZATION | 1 | LS |
$315,500.00 |
$200,000.00 |
$450,000.00 |
| 26 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 8 | MO |
$15,000.00 |
$12,000.00 |
$50,000.00 |
| 27 | 506-6042 |
BIODEG EROSN CONT LOGS (INSTL) (18") | 270 | LF |
$50.00 |
$6.00 |
$10.00 |
| 28 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 270 | LF |
$5.00 |
$3.00 |
$2.00 |
| 29 | 530-6006 |
DRIVEWAYS (SURF TREAT) | 1,547 | SY |
$150.00 |
$22.00 |
$40.64 |
| 30 | 530-6009 |
TURNOUTS (SURF TREAT) | 179 | SY |
$40.00 |
$25.00 |
$40.64 |
| 31 | 530-6016 |
DRIVEWAYS (BASE) | 1,867 | SY |
$135.00 |
$15.00 |
$8.80 |
| 32 | 560-6004 |
MAILBOX INSTALL-S (TWG-POST) TY 2 | 7 | EA |
$250.00 |
$1,200.00 |
$250.00 |
| 33 | 644-6001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 34 | EA |
$800.00 |
$600.00 |
$650.00 |
| 34 | 644-6004 |
IN SM RD SN SUP&AM TY10BWG(1)SA(T) | 2 | EA |
$1,000.00 |
$600.00 |
$950.00 |
| 35 | 644-6007 |
IN SM RD SN SUP&AM TY10BWG(1)SA(U) | 2 | EA |
$1,200.00 |
$600.00 |
$975.00 |
| 36 | 644-6076 |
REMOVE SM RD SN SUP&AM | 19 | EA |
$150.00 |
$600.00 |
$100.00 |
| 37 | 666-6343 |
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL) | 55,711 | LF |
$0.7500 |
$1.25 |
$1.06 |
| 38 | 666-6346 |
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL) | 4,862 | LF |
$0.7500 |
$2.00 |
$1.10 |
| 39 | 666-6347 |
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL) | 23,708 | LF |
$1.00 |
$1.50 |
$1.10 |
| 40 | 668-6018 |
PREFAB PAV MRK TY B (W)(24")(SLD) | 98 | LF |
$35.00 |
$33.00 |
$30.00 |
| 41 | 668-6033 |
PREFAB PAV MRK TY B (W)(18")(YLD TRI) | 9 | EA |
$100.00 |
$33.00 |
$100.00 |
| 42 | 672-6009 |
REFL PAV MRKR TY II-A-A | 697 | EA |
$6.00 |
$8.00 |
$5.00 |
| 43 | 6056-6002 |
PREFORMED CENTERLINE RUMBLE STRIP | 1,562 | LF |
$4.00 |
$11.00 |
$12.00 |
| 44 | 6185-6005 |
TMA (MOBILE OPERATION) | 15 | DAY |
$500.00 |
$250.00 |
$2,200.00 |