| 1 | 110-6001 |
EXCAVATION (ROADWAY) | 158 | CY |
$20.00 |
$32.00 |
$85.23 |
$20.16 |
|
| 2 | 132-6007 |
EMBANKMENT (FINAL)(ORD COMP)(TY D) | 219 | CY |
$35.00 |
$35.00 |
$100.00 |
$20.16 |
|
| 3 | 150-6002 |
BLADING | 40 | HR |
$150.00 |
$250.00 |
$113.64 |
$100.80 |
|
| 4 | 164-6001 |
BROADCAST SEED (PERM) (RURAL) (SANDY) | 27,424 | SY |
$0.2500 |
$1.00 |
$0.5700 |
$0.6600 |
|
| 5 | 316-6065 |
AGGR(TY-A GR-1 SAC-A) | 96 | CY |
$200.00 |
$200.00 |
$113.64 |
$1,472.52 |
|
| 6 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 1,530 | CY |
$580.00 |
$500.00 |
$408.70 |
$525.83 |
|
| 7 | 500-6001 |
MOBILIZATION | 1 | LS |
$189,472.70 |
$275,000.00 |
$222,727.27 |
$304,972.61 |
|
| 8 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 7 | MO |
$20,000.00 |
$1,500.00 |
$1,687.50 |
$2,788.74 |
|
| 9 | 506-6042 |
BIODEG EROSN CONT LOGS (INSTL) (18") | 1,440 | LF |
$15.50 |
$8.00 |
$14.77 |
$15.78 |
|
| 10 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 1,440 | LF |
$4.15 |
$2.00 |
$5.68 |
$1.35 |
|
| 11 | 540-6002 |
MTL W-BEAM GD FEN (STEEL POST) | 200 | LF |
$44.00 |
$37.50 |
$45.45 |
$43.46 |
|
| 12 | 540-6016 |
DOWNSTREAM ANCHOR TERMINAL SECTION | 2 | EA |
$1,945.00 |
$1,750.00 |
$2,272.73 |
$1,346.56 |
|
| 13 | 543-6002 |
CABLE BARRIER SYSTEM (TL-4) | 40,166 | LF |
$15.00 |
$15.50 |
$23.55 |
$16.31 |
|
| 14 | 543-6020 |
CABLE BARRIER TERMINAL SECTION (TL-4) | 12 | EA |
$2,900.00 |
$4,350.00 |
$4,931.82 |
$3,379.81 |
|
| 15 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 2 | EA |
$4,385.00 |
$3,450.00 |
$4,545.45 |
$3,267.42 |
|
| 16 | 644-6004 |
IN SM RD SN SUP&AM TY10BWG(1)SA(T) | 4 | EA |
$1,270.00 |
$1,250.00 |
$454.55 |
$1,223.44 |
|
| 17 | 644-6030 |
IN SM RD SN SUP&AM TYS80(1)SA(T) | 8 | EA |
$1,600.00 |
$1,175.00 |
$568.18 |
$1,141.01 |
|
| 18 | 6001-6002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 4 | EA |
$15,000.00 |
$15,000.00 |
$3,409.09 |
$15,000.00 |
|
| 19 | 6185-6002 |
TMA (STATIONARY) | 248 | DAY |
$240.00 |
$150.00 |
$2.27 |
$65.75 |
|