101Let jobs
$486,002,503Total low bids
$489,475,310Total estimates
-0.7%Low bids vs estimates
Sep 2021 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Sep 28, 2021 | 6388-39-001MMC - 638839001 | El Paso El Paso |
ASPHALTIC PATCHING MATERIALUS 54 · | $80,000 | $110,175 | MESA D CORP. | +37.7% | 2 |
| Sep 28, 2021 | 6384-80-001MMC - 638480001 | Brewster El Paso |
ASPHALTIC PATCHING MATERIALSH 118 · | $92,125 | $83,841 | CSA MATERIALS INC. | -9.0% | 2 |
| Sep 16, 2021 | 6365-88-001MMC - 636588001 | El Paso El Paso |
DE-ICING (MATERIALS ONLY)IH 10 · | $242,500 | $163,346 | NSG LOGISTICS, LLC | -32.6% | 3 |
| Sep 14, 2021 | 6384-72-001MMC - 638472001 | Culberson El Paso |
FLEXIBLE BASEIH 10 · | $41,200 | $35,200 | TOUCHSTONE RESOURCES, LLC | -14.6% | 2 |
| Sep 2, 2021 | 0675-07-097F 2022(009) | Walker Bryan |
WIDEN ROAD - ADD LANESIH 45 · | $198,856,064 | $202,938,415 | WILLIAMS BROTHERS CONSTRUCTION CO., INC. | +2.1% | 3 |
| Sep 2, 2021 | 0200-16-020F 2022(013) | Jefferson Beaumont |
HIGHWAY IMPROVEMENTUS 69 · | $66,513,432 | $70,021,319 | WILLIAMS BROTHERS CONSTRUCTION CO., INC. | +5.3% | 5 |
| Sep 2, 2021 | 0257-04-029F 2022(007) | Eastland Brownwood |
HIGHWAY IMPROVEMENTSH 6 · | $11,744,640 | $10,587,368 | BIG CREEK CONSTRUCTION, LTD. | -9.9% | 6 |
| Sep 2, 2021 | 0091-10-002F 2021(862) | Grayson Paris |
CONSTRUCT NEW ROADFS 121 · | $10,333,026 | $9,300,300 | AUSTIN BRIDGE & ROAD SERVICES, LP | -10.0% | 9 |
| Sep 2, 2021 | 1186-01-091PTF 2022(045) | Travis Austin |
WIDEN ROAD - ADD LANESFM 969 · | $9,593,311 | $8,953,610 | DAN WILLIAMS COMPANY | -6.7% | 6 |
| Sep 2, 2021 | 0003-06-097C 3-6-97 | Reeves Odessa |
FY 2022 SEAL COAT (CRUMB RUBBER) - MAINLANESIH 20 · | $7,809,288 | $7,405,997 | COX PAVING OF TEXAS, INC. | -5.2% | 3 |
| Sep 2, 2021 | 0068-11-008F 2022(064) | Martin Odessa |
SEAL COATFM 2212 · | $7,026,632 | $6,937,459 | RONALD R. WAGNER & CO., LP | -1.3% | 4 |
| Sep 2, 2021 | 0433-05-025C 433-5-25 | Willacy Pharr |
PREVENTIVE MAINTENANCESH 186 · | $4,253,801 | $4,153,228 | BRANNAN PAVING CO., LTD. | -2.4% | 3 |
| Sep 2, 2021 | 0712-01-041C 712-1-41 | Johnson Fort Worth |
SURFACING/ROADWAY RESTORATIONFM 4 · | $2,160,707 | $2,246,213 | DIGG COMMERCIAL, LLC | +4.0% | 3 |
| Sep 2, 2021 | 6385-43-001RMC - 638543001 | Comal San Antonio |
SPOT BASE REPAIRFM 3009 · | $2,096,725 | $1,943,944 | CLARK CONSTRUCTION OF TEXAS, INC. | -7.3% | 6 |
| Sep 2, 2021 | 6385-41-001RMC - 638541001 | Medina San Antonio |
SPOT BASE REPAIRFM 462 · | $2,069,565 | $1,820,224 | CLARK CONSTRUCTION OF TEXAS, INC. | -12.0% | 6 |
| Sep 2, 2021 | 0918-47-148BR 2018(785) | Dallas Dallas |
REPLACE BRIDGE AND APPROACHESCS · | $1,449,768 | $1,766,279 | SEMA CONSTRUCTION, INC. | +21.8% | 7 |
| Sep 2, 2021 | 6386-91-001RMC - 638691001 | Gregg Tyler |
REFLECTORIZED PAVEMENT MARKINGS & MARKERSUS 259 · | $2,023,754 | $1,754,859 | STRIPE-A-ZONE, INC. | -13.3% | 4 |
| Sep 2, 2021 | 6386-92-001RMC - 638692001 | Smith Tyler |
REFLECTORIZED PAVEMENT MARKINGS & MARKERSUS 69 · | $2,023,754 | $1,739,859 | STRIPE-A-ZONE, INC. | -14.0% | 4 |
| Sep 2, 2021 | 0911-00-079C 911-00-79 | Angelina Lufkin |
HIGHWAY IMPROVEMENTVA · | $1,971,278 | $1,710,272 | BATTERSON, LLP | -13.2% | 7 |
| Sep 2, 2021 | 0149-04-018C 149-4-18 | Mason Austin |
RESURFACE ROADWAYUS 377 · | $1,791,661 | $1,661,834 | LONE STAR PAVING COMPANY | -7.2% | 3 |
| Sep 2, 2021 | 6384-86-001RMC - 638486001 | Sabine Lufkin |
TRAFFIC CONTROL SERVICESUS 59 · | $1,364,957 | $1,311,647 | AREA WIDE PROTECTIVE, INC. | -3.9% | 5 |
| Sep 2, 2021 | 6384-83-001RMC - 638483001 | Lubbock Lubbock |
METAL BEAM GUARD FENCE REPAIRIH 27 · | $1,465,450 | $1,245,515 | BARRICADES UNLIMITED | -15.0% | 2 |
| Sep 2, 2021 | 6385-77-001RMC - 638577001 | Midland Odessa |
MILL AND INLAYIH 20 · | $1,538,561 | $1,066,555 | FNF CONSTRUCTION, INC. | -30.7% | 5 |
| Sep 2, 2021 | 6384-18-001RMC - 638418001 | Harris Houston |
SWEEPING AND DEBRIS REMOVALIH 10 · | $922,960 | $988,676 | CEN-TEX IRRIGATION SYSTEMS, INC. | +7.1% | 2 |
| Sep 2, 2021 | 0904-00-187F 2021(385) | Potter Amarillo |
PREVENTIVE MAINTENANCEVA · | $1,447,028 | $929,306 | D & M CONTRACTORS, LLC | -35.8% | 2 |
| Sep 2, 2021 | 3012-01-005BR 2022(012) | De Witt Yoakum |
REPLACE BRIDGE AND APPROACHESFM 2980 · | $1,146,302 | $913,752 | CONSTAR CONSTRUCTION | -20.3% | 6 |
| Sep 2, 2021 | 0908-33-101BR 2021(070) | Taylor Abilene |
BRIDGE REPLACEMENTCS · | $989,567 | $786,841 | THK CONSTRUCTION LLC | -20.5% | 7 |
| Sep 2, 2021 | 0902-20-110BR 2012(346) | Wise Fort Worth |
BRIDGE REPLACEMENTCR · | $689,206 | $769,195 | HODGES AND SON CONSTRUCTION COMPANY, INC. | +11.6% | 6 |
| Sep 2, 2021 | 6383-57-001MMC - 638357001 | Travis Austin |
WINTER WEATHER MATERIAL (MATERIAL ONLY)IH 35 · | $805,481 | $763,803 | NSG LOGISTICS, LLC | -5.2% | 4 |
| Sep 2, 2021 | 0110-05-127C 110-5-127 | Harris Houston |
ADD LEFT AND RIGHT TURN LANESIH 45 · | $676,107 | $750,384 | MAIN LANE INDUSTRIES LTD. | +11.0% | 2 |
| Sep 2, 2021 | 6384-77-001MMC - 638477001 | Erath Fort Worth |
HOT MIX ASPHALTUS 377 · | $637,100 | $716,100 | NORTHEASTERN PAVERS, LLC | +12.4% | 2 |
| Sep 2, 2021 | 6383-77-001RMC - 638377001 | Harris Houston |
REFLECTIVE PAVEMENT MARKINGS (LONG LINE)US 290 · | $810,284 | $689,440 | BATTERSON, LLP | -14.9% | 5 |
| Sep 2, 2021 | 6387-96-001RMC - 638796001 | Austin Yoakum |
CRACK SEALIH 10 · | $784,613 | $681,105 | CRACKSEAL OF TEXAS, LLC | -13.2% | 4 |
| Sep 2, 2021 | 6364-21-001BPM - 636421001 | Caldwell Austin |
SCOUR AND EROSION CONTROLFM 20 · | $608,980 | $675,858 | DEAN WORD COMPANY, LTD. | +11.0% | 8 |
| Sep 2, 2021 | 2447-01-032F 2022(010) | Washington Bryan |
INTERSECTION IMPROVEMENTFM 577 · | $396,288 | $576,065 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | +45.4% | 5 |
| Sep 2, 2021 | 6384-85-001RMC - 638485001 | San Jacinto Lufkin |
TRAFFIC CONTROL SERVICESUS 59 · | $576,662 | $503,250 | PROFESSIONAL TRAFFIC CONTROL LLC | -12.7% | 6 |
| Sep 2, 2021 | 6384-73-001MMC - 638473001 | Brewster El Paso |
LIMESTONE ROCK AND ASPHALT (MATERIAL ONLY)FM 170 · | $416,500 | $472,651 | VULCAN CONSTRUCTION MATERIALS, LLC | +13.5% | 1 |
| Sep 2, 2021 | 6380-87-001BPM - 638087001 | Tarrant Fort Worth |
BRIDGE PREVENTATIVE MAINTENANCEIH 20 · | $500,430 | $455,945 | SCOTT TUCKER CONSTRUCTION COMPANY, LLC | -8.9% | 7 |
| Sep 2, 2021 | 6387-85-001RMC - 638785001 | Midland Odessa |
REFLECTIVE PAVEMENT MARKINGS (LONG LINE)IH 20 · | $456,500 | $416,050 | L&L COMPANY | -8.9% | 5 |
| Sep 2, 2021 | 6388-11-001RMC - 638811001 | Pecos Odessa |
SWEEPING AND DEBRIS REMOVALIH 10 · | $418,212 | $401,581 | S6 INTERSTATE SERVICES | -4.0% | 4 |
| Sep 2, 2021 | 6384-52-001RMC - 638452001 | Dallas Dallas |
STORM SEWER AND DRAIN INLET CLEANINGUS 80 · | $361,413 | $337,981 | E.V.G. ENTERPRISE | -6.5% | 3 |
| Sep 2, 2021 | 6385-37-001RMC - 638537001 | Lamar Paris |
TRAFFIC SIGNAL MAINTENANCEUS 82 · | $316,090 | $334,171 | NORTH TEXAS TRAFFIC SYSTEMS CONSTRUCTION | +5.7% | 2 |
| Sep 2, 2021 | 6387-67-001MMC - 638767001 | Bell Waco |
HOT-MIX COLD-LAIDUS 190 · | $320,000 | $323,000 | KNIFE RIVER CORPORATION - SOUTH | +0.9% | 3 |
| Sep 2, 2021 | 1311-01-058F 2022(063) | Denton Dallas |
LANDSCAPE DEVELOPMENTFM 1171 · | $316,748 | $313,461 | CENTRAL NORTH CONSTRUCTION, LLC | -1.0% | 3 |
| Sep 2, 2021 | 0063-03-069BR 2022(003) | Panola Atlanta |
BRIDGE MAINTENANCEUS 59 · | $374,605 | $310,940 | THK CONSTRUCTION LLC | -17.0% | 6 |
| Sep 2, 2021 | 0315-04-080F 2022(008) | Grimes Bryan |
CONSTRUCT PEDESTRIAN INFRASTRUCTURESH 105 · | $137,989 | $199,661 | FUQUA CONSTRUCTION CO., INC. | +44.7% | 6 |
| Sep 2, 2021 | 6365-35-001MMC - 636535001 | El Paso El Paso |
DE-ICING (MATERIAL ONLY)IH 10 · | $389,250 | $192,289 | NSG LOGISTICS, LLC | -50.6% | 5 |
| Sep 2, 2021 | 6384-81-001RMC - 638481001 | Terry Lubbock |
METAL BEAM GUARD FENCE REPAIRUS 62 · | $180,675 | $160,125 | BARRICADES UNLIMITED | -11.4% | 2 |
| Sep 2, 2021 | 6384-82-001RMC - 638482001 | Lamb Lubbock |
METAL BEAM GUARD FENCE REPAIRUS 84 · | $179,675 | $160,125 | BARRICADES UNLIMITED | -10.9% | 2 |
| Sep 2, 2021 | 6384-84-001RMC - 638484001 | Hale Lubbock |
METAL BEAM GUARD FENCE REPAIRIH 27 · | $180,675 | $160,125 | BARRICADES UNLIMITED | -11.4% | 2 |
| Sep 2, 2021 | 0910-16-169F 2022(028) | Smith Tyler |
LANDSCAPE DEVELOPMENTVA · | $157,515 | $157,495 | TIGHT LINE CONSTRUCTION, LLC | 0.0% | 1 |
| Sep 1, 2021 | 0052-02-036F 2022(025) | Bailey Lubbock |
SURFACING/ROADWAY RESTORATIONUS 70 · | $17,626,686 | $18,113,896 | DUININCK, INC. | +2.8% | 4 |
| Sep 1, 2021 | 0065-14-028C 65-14-28 | Hardin Beaumont |
SEAL COATBU 96-F · | $9,605,127 | $10,965,722 | CLARK CONSTRUCTION OF TEXAS, INC. | +14.2% | 1 |
| Sep 1, 2021 | 2975-01-009F 2022(047) | Atascosa San Antonio |
REHABILITATE EXISTING ROADWAYFM 2924 · | $7,418,473 | $7,308,203 | HUNTER INDUSTRIES, LTD. | -1.5% | 6 |
| Sep 1, 2021 | 0379-03-026STP 2021(190)HES | Potter Amarillo |
HAZARD ELIMINATION & SAFETYSH 136 · | $5,191,975 | $6,694,352 | GILVIN-TERRILL, LTD. | +28.9% | 2 |
| Sep 1, 2021 | 0017-08-114F 2022(016) | La Salle Laredo |
SEAL COATIH 35 · | $7,268,949 | $6,453,182 | RONALD R. WAGNER & CO., LP | -11.2% | 5 |
| Sep 1, 2021 | 0017-04-044F 2022(046) | Atascosa San Antonio |
REHABILITATE EXISTING ROADWAYIH 35 · | $5,699,774 | $6,383,622 | ANDERSON COLUMBIA CO., INC. | +12.0% | 9 |
| Sep 1, 2021 | 1122-04-012SSW 1122-4-12 | Wilson San Antonio |
HAZARD ELIMINATION & SAFETYFM 1344 · | $5,354,351 | $6,200,914 | HUNTER INDUSTRIES, LTD. | +15.8% | 5 |
| Sep 1, 2021 | 1663-03-020C 1663-3-20 | Navarro Dallas |
WIDEN ROAD - ADD LANES AND SHOULDERSFM 744 · | $7,992,178 | $5,714,507 | A. L. HELMCAMP, INC. | -28.5% | 6 |
| Sep 1, 2021 | 1054-01-009C 1054-1-9 | Bosque Waco |
SEAL COATFM 219 · | $6,192,286 | $5,391,495 | BRANNAN PAVING CO., LTD. | -12.9% | 4 |
| Sep 1, 2021 | 2898-01-012C 2898-1-12 | Waller Houston |
SURFACING/ROADWAY RESTORATIONFM 2855 · | $4,302,753 | $5,061,781 | STERLING DELAWARE HOLDING COMPANY, INC. | +17.6% | 5 |
| Sep 1, 2021 | 0014-17-078F 2022(065) | Hill Waco |
SEAL COATFM 1242 · | $5,455,088 | $4,783,740 | COX PAVING OF TEXAS, INC. | -12.3% | 2 |
| Sep 1, 2021 | 1801-01-051C 1801-1-51 | Cameron Pharr |
PREVENTIVE MAINTENANCEFM 1847 · | $5,282,099 | $4,751,672 | BRANNAN PAVING CO., LTD. | -10.0% | 3 |
| Sep 1, 2021 | 6383-26-001RMC - 638326001 | Maverick Laredo |
SEAL COATUS 57 · | $4,273,738 | $4,186,715 | BRANNAN PAVING CO., LTD. | -2.0% | 4 |
| Sep 1, 2021 | 0092-02-125CM 2022(004) | Dallas Dallas |
INTERSECTION IMPROVEMENTIH 45 · | $3,302,613 | $3,359,266 | ED BELL CONSTRUCTION COMPANY | +1.7% | 9 |
| Sep 1, 2021 | 6384-62-001RMC - 638462001 | Hays Austin |
METAL BEAM GUARD FENCE REPAIRFM 2001 · | $3,363,500 | $2,619,425 | SOUTHEAST HIGHWAY GUARDRAIL & ATTENUATORS, LLC | -22.1% | 4 |
| Sep 1, 2021 | 0910-00-115F 2022(095) | Smith Tyler |
PREVENTIVE MAINTENANCEVA · | $2,453,269 | $2,493,890 | TOTAL HIGHWAY MAINTENANCE, LLC | +1.7% | 5 |
| Sep 1, 2021 | 0918-00-330C 918-00-330 | Dallas Dallas |
NON-SITE SPECIFIC TRAFFIC SIGNAL INSTALLATIONVA · | $2,500,000 | $2,444,000 | DURABLE SPECIALTIES, INC. | -2.2% | 1 |
| Sep 1, 2021 | 0009-02-065C 9-2-65 | Dallas Dallas |
MILL, FULL DEPTH REPAIR, OV & PAVEMENT MARKINGSSH 78 · | $2,349,593 | $2,049,364 | SILVER CREEK CONSTRUCTION, INC. | -12.8% | 9 |
| Sep 1, 2021 | 6385-40-001RMC - 638540001 | Bexar San Antonio |
SPOT BASE REPAIRIH 10 · | $2,088,691 | $1,998,721 | TEXAS MATERIALS GROUP, INC. | -4.3% | 6 |
| Sep 1, 2021 | 6374-04-001RMC - 637404001 | Harris Houston |
MNT OF TRF SGNLSIH 45 · | $2,279,744 | $1,985,138 | LINDSEY ELECTRIC, L.P. | -12.9% | 4 |
| Sep 1, 2021 | 6386-89-001RMC - 638689001 | Henderson Tyler |
REFLECTORIZED PAVEMENT MARKINGS & MARKERSSH 19 · | $2,023,754 | $1,825,545 | STRIPING TECHNOLOGY, L.P. | -9.8% | 4 |
| Sep 1, 2021 | 6386-90-001RMC - 638690001 | Wood Tyler |
REFLECTORIZED PAVEMENT MARKINGS & MARKERSUS 80 · | $2,023,754 | $1,820,645 | STRIPING TECHNOLOGY, L.P. | -10.0% | 4 |
| Sep 1, 2021 | 6380-30-001RMC - 638030001 | Harris Houston |
TRAFFIC SIGNAL MAINTENANCEIH 610 · | $1,957,245 | $1,627,457 | TRAF-TEX, INC. | -16.8% | 5 |
| Sep 1, 2021 | 0535-06-046BR 2022(011) | Fayette Yoakum |
BRIDGE MAINTENANCEIH 10 · | $1,391,920 | $1,588,807 | RAGLE CONSTRUCTION, INC. | +14.1% | 4 |
| Sep 1, 2021 | 6384-89-001RMC - 638489001 | Kaufman Dallas |
SWEEPING AND DEBRIS REMOVALIH 20 · | $1,204,026 | $1,275,753 | SWEEPING SERVICES OF TEXAS - OPERATING, L.P. | +6.0% | 2 |
| Sep 1, 2021 | 0488-01-017CC 488-1-17 | Nolan Abilene |
REHAB ROADWAYFM 1856 · | $1,419,697 | $1,166,773 | J. H. STRAIN & SONS, INC. | -17.8% | 6 |
| Sep 1, 2021 | 6387-37-001RMC - 638737001 | Bexar San Antonio |
TRAFFIC CONTROL SERVICESIH 10 · | $1,279,000 | $1,112,250 | BARRICADES UNLIMITED | -13.0% | 6 |
| Sep 1, 2021 | 6384-70-001RMC - 638470001 | Brewster El Paso |
DISTRICTWIDE CRACK SEALUS 90 · | $1,085,050 | $1,070,743 | CRACKSEAL OF TEXAS, LLC | -1.3% | 3 |
| Sep 1, 2021 | 6387-16-001MMC - 638716001 | Titus Atlanta |
DE-ICING SALTIH 30 · | $980,000 | $1,022,550 | NSG LOGISTICS, LLC | +4.3% | 3 |
| Sep 1, 2021 | 6387-91-001RMC - 638791001 | Jefferson Beaumont |
DEBRIS REMOVALIH 10 · | $1,456,000 | $966,350 | GLOBAL EMERGENCY SERVICES, LLC. | -33.6% | 5 |
| Sep 1, 2021 | 6382-03-001RMC - 638203001 | Victoria Yoakum |
DEBRIS REMOVALUS 59 · | $1,360,000 | $946,100 | GLOBAL EMERGENCY SERVICES, LLC. | -30.4% | 5 |
| Sep 1, 2021 | 6380-17-001RMC - 638017001 | Jefferson Beaumont |
FULL DEPTH CONCRETE REPAIRSH 124 · | $1,137,510 | $873,550 | DBI SERVICES, LLC | -23.2% | 7 |
| Sep 1, 2021 | 6387-34-001MMC - 638734001 | Nolan Abilene |
DE-ICING SALTIH 20 · | $1,020,000 | $783,750 | NSG LOGISTICS, LLC | -23.2% | 3 |
| Sep 1, 2021 | 6377-08-001RMC - 637708001 | Chambers Beaumont |
METAL BEAM GUARD FENCE REPAIRIH 10 · | $818,825 | $709,384 | ROY JORGENSEN ASSOCIATES, INC. | -13.4% | 4 |
| Sep 1, 2021 | 6386-02-001MMC - 638602001 | Johnson Fort Worth |
HOT MIX ASPHALTIH 35W · | $683,800 | $694,190 | AUSTIN ASPHALT, INC. | +1.5% | 2 |
| Sep 1, 2021 | 6382-76-001RMC - 638276001 | Harris Houston |
COMMUNICATION CABLEIH 610 · | $1,055,062 | $685,627 | TRAF-TEX, INC. | -35.0% | 3 |
| Sep 1, 2021 | 6370-80-001BPM - 637080001 | Bowie Atlanta |
BPM, FY2022SH 8 · | $774,850 | $656,799 | BECK-REIT & SONS, LTD. | -15.2% | 6 |
| Sep 1, 2021 | 1330-02-050F 2022(014) | Tarrant Fort Worth |
RESURFACE ROADWAYFM 1187 · | $835,253 | $602,183 | TEXAS MATERIALS GROUP, INC. | -27.9% | 4 |
| Sep 1, 2021 | 6384-91-001RMC - 638491001 | Rockwall Dallas |
SWEEPING AND DEBRIS REMOVALIH 30 · | $778,610 | $597,395 | SWEEPING SERVICES OF TEXAS - OPERATING, L.P. | -23.3% | 2 |
| Sep 1, 2021 | 6382-90-001RMC - 638290001 | Jefferson Beaumont |
MILL AND INLAYFM 365 · | $721,976 | $581,453 | PTSS INVESTMENTS, LLC | -19.5% | 4 |
| Sep 1, 2021 | 6384-87-001RMC - 638487001 | Denton Dallas |
FLEXIBLE PAVEMENT STRUCTURE REPAIRFM 1385 · | $482,453 | $417,042 | A. K. GILLIS & SONS, LLC | -13.6% | 4 |
| Sep 1, 2021 | 6387-66-001MMC - 638766001 | McLennan Waco |
EMULSIONUS 84 · | $471,397 | $416,096 | ERGON ASPHALT & EMULSIONS, INC. | -11.7% | 1 |
| Sep 1, 2021 | 6379-23-001RMC - 637923001 | Travis Austin |
GANTRY OPERATIONAL IMPROVEMENTSSL 1 · | $327,901 | $397,011 | DAN WILLIAMS COMPANY | +21.1% | 3 |
| Sep 1, 2021 | 6379-93-001RMC - 637993001 | Palo Pinto Fort Worth |
CULVERT REPLACEMENTFM 2256 · | $392,670 | $357,953 | JAY MILLS CONTRACTING, INCORPORATED | -8.8% | 6 |
| Sep 1, 2021 | 6383-82-001RMC - 638382001 | Fort Bend Houston |
REFLECTIVE PAVEMENT MARKINGS (GRAPHICS)US 59 · | $399,732 | $357,638 | STRIPE LINES, INC. | -10.5% | 6 |
| Sep 1, 2021 | 6384-55-001RMC - 638455001 | Lamb Lubbock |
CRACK SEALUS 84 · | $414,996 | $337,888 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -18.6% | 5 |
| Sep 1, 2021 | 6384-56-001RMC - 638456001 | Lubbock Lubbock |
CRACK SEALIH 27 · | $358,534 | $298,360 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -16.8% | 5 |
| Sep 1, 2021 | 6386-87-001RMC - 638687001 | Titus Atlanta |
CRACK SEALSH 49 · | $316,322 | $278,432 | TALBRAN ENTERPRISES LLC | -12.0% | 5 |
| Sep 1, 2021 | 6387-95-001MMC - 638795001 | Grayson Paris |
DE-ICING SALTUS 75 · | $308,000 | $275,700 | SOUTHWEST ENVIROTX PARTNERS, LLC | -10.5% | 4 |
1–100 of 101Next ›
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.