96Let jobs
$481,894,592Total low bids
$482,552,713Total estimates
-0.1%Low bids vs estimates
Nov 2018 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Nov 12, 2018 | 6333-00-001RMC - 633300001 | Val Verde Laredo |
INSTALL PAVE MRK AND MRKSUS 277 · | $299,459 | $281,755 | REPUBLIC TRAFFIC SAFETY, INC. | -5.9% | 2 |
| Nov 12, 2018 | 6327-78-001RMC - 632778001 | Polk Lufkin |
FHWA_DISASTER RELIEF MAINTENANCEUS 59 · | $202,540 | $236,942 | CHAMPION INFRASTRUCTURE, LLC | +17.0% | 3 |
| Nov 12, 2018 | 6336-57-001RMC - 633657001 | Van Zandt Tyler |
GUARDRAILUS 80 · | $90,103 | $88,980 | THOMAS 11 DEVELOPMENT LLC | -1.2% | 10 |
| Nov 7, 2018 | 0114-05-037NH 2019(106) | Bastrop Austin |
GR, BASE, STRS, HMACP & PVMT MRKSUS 290 · | $32,993,154 | $34,428,168 | ANGEL BROTHERS HOLDINGS CORP. | +4.3% | 7 |
| Nov 7, 2018 | 0018-01-093NH 2019(164) | La Salle Laredo |
REHABILITATION OF EXISTING HIGHWAYIH 35 · | $11,016,398 | $10,878,130 | J. CARROLL WEAVER, INC. | -1.3% | 5 |
| Nov 7, 2018 | 0037-01-042STP 2019(170) | Uvalde San Antonio |
REHAB EXISTING ROADWAYUS 83 · | $11,761,070 | $10,197,041 | HUNTER INDUSTRIES, LTD. | -13.3% | 5 |
| Nov 7, 2018 | 0053-03-021NH 2019(154) | Lynn Lubbock |
SEALCOATUS 84 · | $6,876,878 | $9,099,683 | COX PAVING OF TEXAS, INC. | +32.3% | 3 |
| Nov 7, 2018 | 0044-11-002NH 2019(219) | Wichita Wichita Falls |
SEAL COATBU 287J · | $9,512,380 | $8,903,752 | LIPHAM ASPHALT AND PAVING COMPANY, LLC | -6.4% | 3 |
| Nov 7, 2018 | 0092-13-024BR 2019(207) | Navarro Dallas |
REPLACE BRIDGE AND APPROACHESBI 45-F · | $8,642,002 | $7,970,000 | PIERCE R & B LLC | -7.8% | 15 |
| Nov 7, 2018 | 0025-10-092STP 2019(171) | Guadalupe San Antonio |
SURFACE & PAVEMENT MARKINGSFM 78 · | $7,755,982 | $7,321,503 | HUNTER INDUSTRIES, LTD. | -5.6% | 5 |
| Nov 7, 2018 | 0025-07-065STP 2019(173) | Gonzales Yoakum |
SEAL COATSH 97 · | $6,761,632 | $7,309,913 | F. N. PLOCH CONSTRUCTION COMPANY, INC. | +8.1% | 3 |
| Nov 7, 2018 | 0068-02-048STP 2019(157) | Lynn Lubbock |
SEALCOATUS 87 · | $5,863,298 | $6,100,851 | LIPHAM ASPHALT AND PAVING COMPANY, LLC | +4.1% | 3 |
| Nov 7, 2018 | 2941-02-055STP 2019(222) | Harris Houston |
BASE RPR, PLANING,1"TOM-F,1"TOM-C & PAV MRKSFM 2920 · | $8,513,632 | $6,097,569 | ANGEL BROTHERS HOLDINGS CORP. | -28.4% | 3 |
| Nov 7, 2018 | 0002-07-049BR 1802(572) | Hudspeth El Paso |
REPLACE BRIDGES AND APPROACHESIH 10 · | $5,465,090 | $5,693,877 | DAN WILLIAMS COMPANY | +4.2% | 5 |
| Nov 7, 2018 | 0067-04-054STP 2019(193) | Hale Lubbock |
SEALCOATIH 27 · | $5,381,902 | $5,509,388 | LIPHAM ASPHALT AND PAVING COMPANY, LLC | +2.4% | 3 |
| Nov 7, 2018 | 0044-07-071NH 2019(217) | Cooke Wichita Falls |
PAVEMENT REPAIR AND OVERLAYUS 82 · | $4,540,277 | $4,475,655 | JAGOE-PUBLIC COMPANY | -1.4% | 6 |
| Nov 7, 2018 | 2817-01-010STP 2019(192) | Fort Bend Houston |
ADD 4' SHOULDER AND OVERLAYFM 2759 · | $5,457,736 | $4,321,825 | DURWOOD GREENE CONSTRUCTION CO. | -20.8% | 3 |
| Nov 7, 2018 | 0218-01-096NH 2019(201) | Bowie Atlanta |
PLANING, ACP & PAV MRKSUS 59 · | $4,788,910 | $4,256,574 | RK HALL, LLC | -11.1% | 3 |
| Nov 7, 2018 | 2224-01-100NH 2019(359) | Ector Odessa |
RECONSTRUCT INTERSECTIONSL 338 · | $1,603,725 | $3,012,163 | FNH CONSTRUCTION, LLC | +87.8% | 3 |
| Nov 7, 2018 | 6334-22-001RMC - 633422001 | McLennan Waco |
SEAL COAT (DISTRICT WIDE)FM 2416 · | $1,836,770 | $2,011,340 | BRANNAN PAVING CO., LTD. | +9.5% | 2 |
| Nov 7, 2018 | 0715-01-014BR 2019(176) | Gonzales Yoakum |
REPLACE BRIDGE AND APPROACHESFM 108 · | $2,209,230 | $1,963,663 | HILL COUNTRY BRIDGE, INC. | -11.1% | 8 |
| Nov 7, 2018 | 0914-00-414C 914-00-414 | Travis Austin |
ROUTINE MAINTENANCE OF PAVEMENT MARKINGSVA · | $1,988,359 | $1,954,799 | TRP CONSTRUCTION GROUP, LLC | -1.7% | 3 |
| Nov 7, 2018 | 6338-73-001RMC - 633873001 | Bell Waco |
DISTRICT WIDE PAVEMENT MARKINGSSH 317 · | $1,284,325 | $1,169,617 | BATTERSON, LLP | -8.9% | 6 |
| Nov 7, 2018 | 6335-53-001RMC - 633553001 | Hidalgo Pharr |
PAVEMENT MARKINGSIH 2 · | $1,281,341 | $1,127,180 | PAVEMENT MARKINGS INC. | -12.0% | 4 |
| Nov 7, 2018 | 6335-76-001RMC - 633576001 | Harris Houston |
REFLECTIVE PAVEMENT MARKINGS (GRAPHICS)SL 8 · | $1,235,553 | $1,106,689 | PMI PAVEMENT MARKING, INC. | -10.4% | 4 |
| Nov 7, 2018 | 6336-75-001RMC - 633675001 | Victoria Yoakum |
CALL OUT CONCRETE PUNCH OUTSUS 59 · | $1,377,100 | $997,550 | MAIN LANE INDUSTRIES LTD. | -27.6% | 3 |
| Nov 7, 2018 | 6335-59-001RMC - 633559001 | Harris Houston |
FULL DEPTH CONCRETE AND BRIDGE DECK REPAIRIH 10 · | $894,100 | $995,975 | ISI CONTRACTING, INC. | +11.4% | 2 |
| Nov 7, 2018 | 6329-88-001RMC - 632988001 | Harris Houston |
COMM CBL REP AND/OR REPLIH 610 · | $1,337,009 | $983,827 | FLORIDA TRAFFIC CONTROL DEVICES, INC. | -26.4% | 2 |
| Nov 7, 2018 | 6338-27-001RMC - 633827001 | Dallas Dallas |
STORM SEWER AND INLET CLEANINGUS 80 · | $350,840 | $871,029 | DBI SERVICES, LLC | +148.3% | 1 |
| Nov 7, 2018 | 6332-66-001RMC - 633266001 | Dallas Dallas |
POTHOLE REPAIRSH 78 · | $663,575 | $796,100 | DBI SERVICES, LLC | +20.0% | 3 |
| Nov 7, 2018 | 1053-01-016STP 2019(144) | Hall Childress |
CULVERT EXTENSIONS & SAFETY END TREATMENTSFM 658 · | $836,300 | $774,680 | CDM HOLDINGS, LLC | -7.4% | 6 |
| Nov 7, 2018 | 6335-65-001RMC - 633565001 | Runnels San Angelo |
RETRACE PAVEMENT MARKINGS AND MARKERSFM 1770 · | $719,577 | $762,761 | VIZCAINO, L.P. | +6.0% | 7 |
| Nov 7, 2018 | 0445-02-066STP 2019(174) | Lavaca Yoakum |
MILL AND INLAYUS 90A · | $778,903 | $745,425 | HUNTER INDUSTRIES, LTD. | -4.3% | 5 |
| Nov 7, 2018 | 6336-74-001RMC - 633674001 | Victoria Yoakum |
CALL OUT BRIDGE JOINTSUS 59 · | $858,035 | $634,690 | SCR CIVIL CONSTRUCTION, LLC | -26.0% | 4 |
| Nov 7, 2018 | 0604-01-043STP 2019(175)HES | Matagorda Yoakum |
WIDEN PAVED SURFACEFM 2031 · | $593,325 | $594,008 | REXCO CONSTRUCTION SERVICES, INC. | +0.1% | 3 |
| Nov 7, 2018 | 0120-05-025STP 2019(223)HES | Hamilton Waco |
INCREASE SUPERELEVATIONFM 218 · | $500,929 | $571,907 | BIG CREEK CONSTRUCTION, LTD. | +14.2% | 4 |
| Nov 7, 2018 | 6333-48-001RMC - 633348001 | Navarro Dallas |
ON-CALL TRAFFIC CONTROL SERVICESH 22 · | $482,590 | $500,300 | ELITE CASTLE RESOURCES LLC | +3.7% | 4 |
| Nov 7, 2018 | 6338-16-001RMC - 633816001 | De Witt Yoakum |
ON CALL THERMOPLASTIC PAVEMENT MARKINGSUS 183 · | $560,250 | $470,003 | BATTERSON, LLP | -16.1% | 4 |
| Nov 7, 2018 | 6335-75-001RMC - 633575001 | Waller Houston |
CLEANING AND SWEEPING HIGHWAYSUS 290 · | $526,890 | $419,720 | EXPERT MAINTENANCE & CONSTRUCTION SERVICES LLC | -20.3% | 5 |
| Nov 7, 2018 | 6333-46-001RMC - 633346001 | Hill Waco |
DRIFTWOOD & DEBRIS REMOVALSH 171 · | $397,915 | $410,990 | CROSS PLUS CONSTRUCTION, LLC | +3.3% | 2 |
| Nov 7, 2018 | 6329-58-001RMC - 632958001 | Henderson Tyler |
PAINTSH 31 · | $365,860 | $353,375 | STRIPING TECHNOLOGY, L.P. | -3.4% | 4 |
| Nov 7, 2018 | 0836-02-025STP 2019(143)HES | Bell Waco |
SAFETY LIGHTINGSH 195 · | $334,204 | $281,766 | VACA UNDERGROUND UTILITIES INC | -15.7% | 10 |
| Nov 7, 2018 | 0911-38-071STP 2019(183) | Angelina Lufkin |
LANDSCAPING_IN VARIOUS LOCATIONSVA · | $207,605 | $238,595 | GREEN SOURCE ENVIRONMENTAL SOLUTIONS, INC. | +14.9% | 3 |
| Nov 6, 2018 | 0167-01-113NH 2019(166) | El Paso El Paso |
INTERCHANGE IMPROVEMENTSUS 54 · | $97,716,680 | $96,506,598 | SUNDT CONSTRUCTION, INC. | -1.2% | 4 |
| Nov 6, 2018 | 0697-02-039STP 2019(242) | Henderson Tyler |
RECONST BRGS, GR, BS, SURF, PVT MRKSH 334 · | $40,593,999 | $43,069,729 | AUSTIN BRIDGE & ROAD SERVICES, LP | +6.1% | 5 |
| Nov 6, 2018 | 6325-60-001RMC - 632560001 | Travis Austin |
ROADSIDE MAINTENANCEIH 35 · | $46,617,578 | $39,712,405 | ROY JORGENSEN ASSOCIATES, INC. | -14.8% | 3 |
| Nov 6, 2018 | 0255-04-094C 255-4-94 | Brooks Maintenance Division |
REHABILITATE ROADWAYUS 281 · | $16,244,519 | $17,284,414 | FOREMOST PAVING, INC. | +6.4% | 4 |
| Nov 6, 2018 | 0490-03-028STP 2019(237) | Ochiltree |
BASE REPAIR AND OVERLAYSH 70 · | $13,097,047 | $13,090,322 | J. LEE MILLIGAN, INC. | -0.1% | 5 |
| Nov 6, 2018 | 0041-07-107NH 2019(212) | Potter Amarillo |
SEALCOATUS 87 · | $8,587,278 | $12,390,506 | BRANNAN PAVING CO., LTD. | +44.3% | 2 |
| Nov 6, 2018 | 0059-05-045STP 2019(181) | Shelby Lufkin |
RESURFACE WITH SEAL COATSH 7 · | $10,852,736 | $10,961,025 | MISSOURI PETROLEUM PRODUCTS COMPANY LLC | +1.0% | 3 |
| Nov 6, 2018 | 0145-11-011STP 2019(158) | Floyd |
REHABILIATIONFM 97 · | $9,812,566 | $9,844,110 | GILVIN-TERRILL, LTD. | +0.3% | 5 |
| Nov 6, 2018 | 0056-02-033STP 2019(224) | Limestone Waco |
WDN SHLDRS & ADD PASS LNSUS 84 · | $9,120,814 | $9,187,964 | BIG CREEK CONSTRUCTION, LTD. | +0.7% | 5 |
| Nov 6, 2018 | 0007-03-092NH 2019(184) | Eastland Brownwood |
SEAL COAT_2019IH 20 · | $8,238,970 | $9,089,126 | BRANNAN PAVING CO., LTD. | +10.3% | 3 |
| Nov 6, 2018 | 0030-05-067STP 2019(210) | Hemphill Amarillo |
SEALCOATUS 83 · | $8,488,627 | $9,058,028 | MISSOURI PETROLEUM PRODUCTS COMPANY LLC | +6.7% | 4 |
| Nov 6, 2018 | 2263-02-098BR 2019(165) | Nueces Corpus Christi |
BRIDGE REHABILITATION (DALE MILLER BRIDGE)SH 361 · | $3,659,317 | $4,671,605 | SOUTHERN ROAD & BRIDGE, LLC | +27.7% | 4 |
| Nov 6, 2018 | 0902-00-166STP 2019(284) | Tarrant Fort Worth |
TRAFFIC SIGNALSVA · | $5,006,200 | $4,424,000 | DURABLE SPECIALTIES, INC. | -11.6% | 2 |
| Nov 6, 2018 | 0941-02-020STP 2019(177) | De Witt Yoakum |
REHABILITATE EXISTING ROADWAYFM 2656 · | $4,156,613 | $4,185,511 | TIERRA LEASE SERVICE, LLC | +0.7% | 8 |
| Nov 6, 2018 | 2139-03-021STP 2019(216) | Fannin Paris |
OVERLAYSH 11 · | $3,488,104 | $3,667,040 | RK HALL, LLC | +5.1% | 6 |
| Nov 6, 2018 | 6316-66-001RMC - 631666001 | Tarrant Fort Worth |
GUARDRAIL INSTALLATION AND REPAIRIH 35W · | $3,242,875 | $3,152,860 | ELITE CASTLE RESOURCES LLC | -2.8% | 2 |
| Nov 6, 2018 | 0635-03-025C 635-3-25 | Houston Lufkin |
RESURFACE WITH SEALCOATFM 228 · | $3,630,179 | $2,929,223 | NEWMAN & KENG PAVING COMPANY, INC. | -19.3% | 3 |
| Nov 6, 2018 | 0906-00-186NH 2019(159) | Ector Odessa |
OVER-HEIGHT BRIDGE DETECTIONVA · | $2,680,848 | $2,918,727 | AMERICAN LIGHTING AND SIGNALIZATION, LLC | +8.9% | 2 |
| Nov 6, 2018 | 6333-59-001BPM - 633359001 | Travis Austin |
DISTRICTWIDE BRIDGE JOINT REPAIRIH 35 · | $2,229,885 | $2,690,761 | SCR CIVIL CONSTRUCTION, LLC | +20.7% | 3 |
| Nov 6, 2018 | 0914-00-418C 914-00-418 | Travis Austin |
ASPHALT PAVEMENT REPAIRVA · | $1,908,150 | $2,145,700 | LONE STAR PAVING COMPANY | +12.4% | 3 |
| Nov 6, 2018 | 0389-05-124NH 2019(191) | Harris Houston |
REPL MEDIAN RAIL W/CTB,REPL ILLUM POLE ASSEMBLIESSH 146 · | $2,150,827 | $1,819,178 | JAMES CONSTRUCTION GROUP, L.L.C. | -15.4% | 7 |
| Nov 6, 2018 | 6329-80-001RMC - 632980001 | Parker Fort Worth |
ROADSIDE MOWING AND HERBICIDEIH 20 · | $1,281,331 | $1,606,259 | DBI SERVICES, LLC | +25.4% | 6 |
| Nov 6, 2018 | 0309-01-043STP 2019(236)HES | Gray Amarillo |
MILLED EDGELINE & MILLED CENTERLINE RUMBLE STRIPSSH 70 · | $1,898,557 | $1,357,600 | SURFACE PREPARATION TECHNOLOGIES, LLC | -28.5% | 9 |
| Nov 6, 2018 | 0906-00-185STP 2019(197) | Ector Odessa |
CULVERT/STRUCTURE REPAIRVA · | $1,263,074 | $1,239,673 | VIZCAINO, L.P. | -1.9% | 4 |
| Nov 6, 2018 | 6329-99-001RMC - 632999001 | Tarrant Fort Worth |
ROADSIDE MOWING,HERBICIDE,LITTER REMOVAL AND LANDSIH 20 · | $1,170,258 | $1,189,348 | YELLOWSTONE LANDSCAPE - CENTRAL, INC. | +1.6% | 5 |
| Nov 6, 2018 | 0920-39-025STP 2019(190)TAPS | Chambers Beaumont |
CONSTRUCT SIDEWALKSVA · | $1,178,761 | $1,106,084 | TREVWAY, INC. | -6.2% | 12 |
| Nov 6, 2018 | 0920-39-024STP 2019(189)TAPS | Chambers Beaumont |
INSTALL ILLUMINATIONVA · | $1,061,385 | $1,080,400 | THIRD COAST SERVICES LLC | +1.8% | 5 |
| Nov 6, 2018 | 6338-26-001RMC - 633826001 | Dallas Dallas |
STORM SEWER AND INLET CLEANINGUS 67 · | $396,632 | $1,042,591 | DBI SERVICES, LLC | +162.9% | 1 |
| Nov 6, 2018 | 6336-22-001RMC - 633622001 | Erath Fort Worth |
ROADSIDE MOWING AND HERBICIDEUS 377 · | $854,275 | $1,037,541 | CROSS PLUS CONSTRUCTION, LLC | +21.5% | 4 |
| Nov 6, 2018 | 6328-96-001RMC - 632896001 | Tarrant Fort Worth |
SWEEPING AND DEBRIS REMOVALIH 20 · | $1,174,767 | $1,020,089 | SWEEPING SERVICES OF TEXAS - OPERATING, L.P. | -13.2% | 1 |
| Nov 6, 2018 | 6327-14-001RMC - 632714001 | Travis Austin |
PREVENTATIVE MAINTENANCE OF TRAFFIC SIGNALSIH 35 · | $1,059,065 | $909,080 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | -14.2% | 2 |
| Nov 6, 2018 | 6331-77-001RMC - 633177001 | Jasper Beaumont |
FLEXIBLE PAVEMENT STRUCTURE REPAIRUS 190 · | $563,388 | $897,768 | OLDCASTLE MATERIALS TEXAS, INC. | +59.4% | 6 |
| Nov 6, 2018 | 0914-00-415C 914-00-415 | Travis Austin |
ROUTINE MAINTENANCE OF PVMT MARKINGVA · | $843,308 | $727,670 | TRP CONSTRUCTION GROUP, LLC | -13.7% | 2 |
| Nov 6, 2018 | 0922-00-069STP 2019(346) | Webb Laredo |
THERMOPLASTIC RE-STRIPINGVA · | $800,342 | $638,114 | VIZCAINO, L.P. | -20.3% | 6 |
| Nov 6, 2018 | 6331-53-001BPM - 633153001 | Titus Atlanta |
BRIDGE PREVENTIVE MAINTENANCEUS 67 · | $654,890 | $623,721 | STATELINE CONSTRUCTION, LLC | -4.8% | 10 |
| Nov 6, 2018 | 1378-01-038STP 2019(198)HES | Travis Austin |
INSTALL CONTINUOUS LTL & SHOULDERSRM 1431 · | $597,501 | $617,105 | DAN WILLIAMS COMPANY | +3.3% | 3 |
| Nov 6, 2018 | 0150-01-028STP 2019(160) | Mason Austin |
FULL DEPTH REPAIR, SEAL & TOM OVERLAYSH 29 · | $697,516 | $607,279 | ANGEL BROTHERS HOLDINGS CORP. | -12.9% | 3 |
| Nov 6, 2018 | 6332-65-001RMC - 633265001 | Dallas Dallas |
POTHOLE REPAIRSL 12 · | $514,765 | $602,869 | DBI SERVICES, LLC | +17.1% | 1 |
| Nov 6, 2018 | 6328-19-001RMC - 632819001 | Ellis Dallas |
ON-CALL TRAFFIC CONTROL SERVICESIH 45 · | $545,223 | $534,600 | NIXON ENGINEERING | -1.9% | 3 |
| Nov 6, 2018 | 0915-00-207STP 2019(169) | Bexar San Antonio |
SIDEWALK, SIGNAL, SIGN, PAV'T MRKNGVA · | $435,354 | $533,808 | E-Z BEL CONSTRUCTION, LLC | +22.6% | 2 |
| Nov 6, 2018 | 6312-48-001RMC - 631248001 | Jasper Beaumont |
REHAB EXISTING ROADWAY/OVERLAY/STRIPINGFM 1131 · | $509,843 | $497,996 | OLDCASTLE MATERIALS TEXAS, INC. | -2.3% | 3 |
| Nov 6, 2018 | 0046-05-050STP 2019(202) | Bowie Atlanta |
LEVEL UP, MICROSURFACING & PAV MRKSUS 82 · | $470,867 | $494,828 | MISSOURI PETROLEUM PRODUCTS COMPANY LLC | +5.1% | 3 |
| Nov 6, 2018 | 0508-03-104STP 2019(188)HES | Chambers Beaumont |
MILLED EDGELINE RUMBLE STRIPS, MILLED CENTERLINEIH 10 · | $294,989 | $484,857 | ISI CONTRACTING, INC. | +64.4% | 1 |
| Nov 6, 2018 | 6335-51-001RMC - 633551001 | Galveston Houston |
ASPHALT PAVEMENT REPAIRSH 146 · | $618,316 | $479,090 | MAIN LANE INDUSTRIES LTD. | -22.5% | 2 |
| Nov 6, 2018 | 0010-08-055STP 2019(213)HES | Morris Atlanta |
SAFETY LIGHTINGUS 67 · | $414,831 | $420,995 | HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC. | +1.5% | 5 |
| Nov 6, 2018 | 0914-18-110BR 2018(884) | Bastrop Austin |
REPLACE BRIDGE AND APPROACHESCR · | $413,679 | $399,604 | TREVWAY, INC. | -3.4% | 12 |
| Nov 6, 2018 | 6333-29-001RMC - 633329001 | Ellis Dallas |
ROADSIDE MOWINGSH 34 · | $404,560 | $390,721 | CARCAM, LLC | -3.4% | 4 |
| Nov 6, 2018 | 6333-60-001RMC - 633360001 | Gillespie Austin |
DISTRICTWIDE ULTRA HP WATER CUTTING TREATMENTUS 87 · | $416,290 | $376,009 | TOTAL HIGHWAY MAINTENANCE, LLC | -9.7% | 3 |
| Nov 6, 2018 | 6333-08-001RMC - 633308001 | Parker Fort Worth |
ROUTINE SWEEPING AND DEBRIS REMOVALIH 20 · | $392,882 | $344,021 | SWEEPING SERVICES OF TEXAS - OPERATING, L.P. | -12.4% | 2 |
| Nov 6, 2018 | 6333-97-001RMC - 633397001 | Jefferson Beaumont |
RUBBER ASPHALT CRACKSEALINGUS 69 · | $322,339 | $296,452 | D & M CONTRACTORS, LLC | -8.0% | 2 |
| Nov 6, 2018 | 6333-98-001RMC - 633398001 | Jefferson Beaumont |
CLEAN AND SEAL EXISTING RIGID CONCRETE PAVEMENT JOSS 136 · | $239,540 | $276,280 | SLSS, LLC | +15.3% | 4 |
| Nov 6, 2018 | 6310-43-001RMC - 631043001 | Ellis Dallas |
TREE AND BRUSH REMOVAL AND TRIMMINGUS 77 · | $287,130 | $243,615 | TERRY ENTERPRISES | -15.2% | 6 |
| Nov 6, 2018 | 0143-09-070NH 2018(834) | De Witt Yoakum |
LANDSCAPE DEVELOPMENTUS 87 · | $106,497 | $99,937 | GREEN SOURCE ENVIRONMENTAL SOLUTIONS, INC. | -6.2% | 4 |
1–96 of 96
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.