| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$4,717.16 |
$20,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 300 | CY |
$10.00 |
$10.11 |
$15.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 250 | CY |
$10.00 |
$16.17 |
$17.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,200 | LF |
$1.75 |
$2.64 |
$3.35 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 1,050 | SY |
$1.50 |
$6.58 |
$5.50 |
| 6 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 225 | CY |
$65.00 |
$34.03 |
$62.50 |
| 7 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 50 | TON |
$30.00 |
$38.07 |
$39.00 |
| 8 | 407(B) 0250 |
TACK COAT | 107 | GAL |
$3.25 |
$3.37 |
$2.80 |
| 9 | 408 5774 |
PRIME COAT | 257 | GAL |
$4.25 |
$3.37 |
$2.80 |
| 10 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 250 | TON |
$70.00 |
$107.82 |
$90.00 |
| 11 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 283 | TON |
$80.00 |
$119.28 |
$100.00 |
| 12 | 412 5267 |
COLD MILLING PAVEMENT | 1,459 | SY |
$4.25 |
$16.17 |
$13.50 |
| 13 | 509(D) 1331 |
CLASS C CONCRETE | 30 | CY |
$650.00 |
$284.85 |
$320.00 |
| 14 | 610(G) 0617 |
ASPHALT DRIVEWAY | 15 | TON |
$75.00 |
$171.17 |
$145.00 |
| 15 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 45 | LF |
$50.00 |
$45.15 |
$37.00 |
| 16 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 1 | EA |
$1,500.00 |
$297.86 |
$1,100.00 |
| 17 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$6,064.92 |
$15,000.00 |
| 18 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 356 | LF |
$6.00 |
$6.87 |
$5.50 |
| 19 | 623 0100 |
(PL)GUARDRAIL CURBING | 4 | EA |
$2,000.00 |
$355.81 |
$1,270.00 |
| 20 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 287.5 | LF |
$18.00 |
$24.26 |
$22.50 |
| 21 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 3 | EA |
$2,500.00 |
$3,369.40 |
$2,800.00 |
| 22 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,000.00 |
$2,493.36 |
$2,245.00 |
| 23 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 2 | EA |
$200.00 |
$168.47 |
$80.00 |
| 24 | 501(G) 6309 |
CLSM BACKFILL | 17.4 | CY |
$250.00 |
$256.07 |
$140.00 |
| 25 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$30,000.00 |
$6,738.80 |
$45,000.00 |
| 26 | 504(A) 1304 |
APPROACH SLAB | 247.4 | SY |
$225.00 |
$303.99 |
$210.00 |
| 27 | 504(B) 1305 |
SAW-CUT GROOVING | 644.2 | SY |
$5.00 |
$6.20 |
$5.00 |
| 28 | 504(C) 6250 |
SEALED EXPANSION JOINT | 47 | LF |
$325.00 |
$315.38 |
$285.00 |
| 29 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 362.4 | LF |
$100.00 |
$97.04 |
$125.00 |
| 30 | 506(A) 1322 |
STRUCTURAL STEEL | 2,340 | LB |
$5.00 |
$13.33 |
$11.00 |
| 31 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$1,250.00 |
$610.58 |
$975.00 |
| 32 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$1,250.00 |
$610.58 |
$975.00 |
| 33 | 509 6152 |
SPECIAL CONCRETE FINISH | 109 | SY |
$100.00 |
$146.10 |
$120.00 |
| 34 | 509(A) 1326 |
CLASS AA CONCRETE | 106 | CY |
$800.00 |
$799.22 |
$885.00 |
| 35 | 509(B) 1328 |
CLASS A CONCRETE | 16.8 | CY |
$1,500.00 |
$734.53 |
$990.00 |
| 36 | 511 6306 |
MECHANICAL SPLICES | 688 | EA |
$15.00 |
$24.26 |
$21.50 |
| 37 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 30,910 | LB |
$1.20 |
$1.23 |
$1.00 |
| 38 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$85,000.00 |
$12,765.99 |
$375,000.00 |
| 39 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$20,000.00 |
$3,663.21 |
$90,000.00 |
| 40 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 375 | SY |
$5.00 |
$4.92 |
$4.00 |
| 41 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 186 | LF |
$30.00 |
$45.82 |
$38.00 |
| 42 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 6.2 | GAL |
$200.00 |
$67.39 |
$56.00 |
| 43 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 41.5 | SY |
$600.00 |
$1,051.25 |
$875.00 |
| 44 | 523(A) 6550 |
SEALER CRACK PREPARATION | 228.5 | LF |
$5.00 |
$5.93 |
$4.50 |
| 45 | 523(B) 6560 |
SEALER RESIN | 2.5 | GAL |
$250.00 |
$269.55 |
$225.00 |
| 46 | 540 4505 |
(PL)REPAIR BRIDGE ITEMS | 1 | EA |
$7,500.00 |
$5,924.75 |
$4,935.00 |
| 47 | 540 4510 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 1 | LSUM |
$7,500.00 |
$8,410.02 |
$7,000.00 |
| 48 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 150 | TON |
$50.00 |
$57.28 |
$53.00 |
| 49 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 50 | TON |
$40.00 |
$46.30 |
$42.00 |
| 50 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$10,000.00 |
$11,455.96 |
$7,700.00 |
| 51 | 619(B) 2510 |
REMOVAL OF BRIDGE ITEM (TYPE A) | 1 | LSUM |
$50,000.00 |
$16,173.12 |
$55,000.00 |
| 52 | 619(B) 2520 |
REMOVAL OF BRIDGE ITEM (TYPE B) | 1 | LSUM |
$10,000.00 |
$5,647.12 |
$4,700.00 |
| 53 | 619(B) 2530 |
REMOVAL OF BRIDGE ITEM (TYPE C) | 1 | LSUM |
$5,000.00 |
$3,164.54 |
$2,700.00 |
| 54 | 823 8478 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 150 | SD |
$150.00 |
$80.87 |
$168.50 |
| 55 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 8,213 | LF |
$0.5000 |
$0.6700 |
$0.5500 |
| 56 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 4,144 | LF |
$0.2500 |
$0.6100 |
$0.3000 |
| 57 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 304 | EA |
$0.6000 |
$1.01 |
$1.15 |
| 58 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 4,800 | LF |
$0.2500 |
$0.6700 |
$0.2500 |
| 59 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 300 | SD |
$10.00 |
$21.56 |
$11.25 |
| 60 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,250 | LF |
$30.00 |
$21.56 |
$22.45 |
| 61 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 1,250 | LF |
$5.00 |
$2.63 |
$1.15 |
| 62 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,813 | SD |
$0.2000 |
$0.0300 |
$0.2000 |
| 63 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 750 | SD |
$0.7500 |
$2.97 |
$0.5500 |
| 64 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,625 | SD |
$1.25 |
$2.97 |
$0.3000 |
| 65 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 600 | SD |
$2.00 |
$0.0300 |
$0.3000 |
| 66 | 880(C) 8848 |
WING BARRICADES | 600 | SD |
$1.25 |
$0.1100 |
$1.15 |
| 67 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 2,700 | SD |
$0.8000 |
$0.4700 |
$1.70 |
| 68 | 880(F) 8878 |
DRUMS | 5,400 | SD |
$0.2500 |
$0.1100 |
$0.1500 |
| 69 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 164 | SD |
$12.00 |
$40.43 |
$16.85 |
| 70 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$25,000.00 |
$9,434.32 |
$8,000.00 |
| 71 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$70,000.00 |
$95,057.54 |
$70,000.00 |