| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$21,500.00 |
$72,310.00 |
$285,000.00 |
| 2 | 221(C) 2801 |
TEMPORARY SILT FENCE | 300 | LF |
$2.00 |
$4.00 |
$4.35 |
$5.00 |
| 3 | 221(F) 0100 |
TEMPORARY SILT DIKE | 20 | LF |
$10.00 |
$11.00 |
$11.00 |
$25.00 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 720 | SY |
$5.00 |
$8.00 |
$5.25 |
$8.00 |
| 5 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 202.4 | TON |
$115.00 |
$143.00 |
$189.00 |
$125.00 |
| 6 | 412 5267 |
COLD MILLING PAVEMENT | 1,105 | SY |
$12.00 |
$7.70 |
$15.75 |
$10.00 |
| 7 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 645 | LF |
$5.00 |
$4.50 |
$6.40 |
$10.00 |
| 8 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 555 | LF |
$20.00 |
$20.00 |
$18.00 |
$20.00 |
| 9 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 3 | EA |
$1,800.00 |
$3,100.00 |
$2,468.00 |
$3,000.00 |
| 10 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 1 | EA |
$750.00 |
$1,650.00 |
$1,575.00 |
$2,000.00 |
| 11 | 501(G) 6309 |
CLSM BACKFILL | 115 | CY |
$200.00 |
$225.00 |
$280.00 |
$90.00 |
| 12 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$250,000.00 |
$80,000.00 |
$243,000.00 |
$511,742.90 |
| 13 | 504(A) 1304 |
APPROACH SLAB | 171.2 | SY |
$210.00 |
$300.00 |
$199.00 |
$175.00 |
| 14 | 504(C) 6250 |
SEALED EXPANSION JOINT | 542.8 | LF |
$310.00 |
$350.00 |
$337.00 |
$250.00 |
| 15 | 504(E) 1381 |
CONCRETE PARAPET | 192 | LF |
$150.00 |
$150.00 |
$223.00 |
$225.00 |
| 16 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 186.5 | LF |
$30.00 |
$28.00 |
$14.00 |
$40.00 |
| 17 | 506(A) 1322 |
STRUCTURAL STEEL | 1,600 | LB |
$2.00 |
$3.50 |
$5.00 |
$15.00 |
| 18 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 150 | EA |
$1,400.00 |
$1,550.00 |
$1,230.00 |
$1,200.00 |
| 19 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 150 | EA |
$1,400.00 |
$1,550.00 |
$1,230.00 |
$1,200.00 |
| 20 | 509 6152 |
SPECIAL CONCRETE FINISH | 792 | SY |
$60.00 |
$50.00 |
$83.00 |
$90.00 |
| 21 | 511 6306 |
MECHANICAL SPLICES | 520 | EA |
$35.00 |
$25.00 |
$59.00 |
$32.00 |
| 22 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 18.2 | SY |
$450.00 |
$300.00 |
$400.00 |
$500.00 |
| 23 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 466.6 | SY |
$700.00 |
$625.00 |
$1,026.11 |
$780.00 |
| 24 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 8,975 | SY |
$4.00 |
$4.00 |
$4.50 |
$5.00 |
| 25 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 223 | LF |
$35.00 |
$22.00 |
$25.00 |
$30.00 |
| 26 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 18 | GAL |
$90.00 |
$80.00 |
$60.00 |
$70.00 |
| 27 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 106.1 | SY |
$700.00 |
$550.00 |
$868.00 |
$950.00 |
| 28 | 523(A) 6550 |
SEALER CRACK PREPARATION | 2,384.1 | LF |
$4.00 |
$1.00 |
$1.50 |
$2.00 |
| 29 | 523(B) 6560 |
SEALER RESIN | 27 | GAL |
$80.00 |
$55.00 |
$70.00 |
$100.00 |
| 30 | 523(C) 6570 |
DECK AREA SEALED (FLOODCOATS) | 11,028 | SY |
$17.00 |
$12.00 |
$13.00 |
$13.00 |
| 31 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 5,131 | SF |
$60.00 |
$55.00 |
$63.69 |
$57.00 |
| 32 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 570 | SY |
$45.00 |
$32.00 |
$20.00 |
$23.00 |
| 33 | 540 4501 |
(PL)REPAIR BRIDGE ITEMS | 321.9 | SY |
$2,000.00 |
$650.00 |
$1,250.00 |
$1,350.00 |
| 34 | 619(B) 2510 |
REMOVAL OF BRIDGE ITEM (TYPE A) | 1 | LSUM |
$30,000.00 |
$5,000.00 |
$31,260.00 |
$230,000.00 |
| 35 | 619(B) 6252 |
REMOVAL OF EXISTING PARAPET | 192 | LF |
$50.00 |
$20.00 |
$100.00 |
$425.00 |
| 36 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 11,011 | LF |
$0.8000 |
$0.7500 |
$0.8200 |
$0.7500 |
| 37 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 11,011 | LF |
$0.2500 |
$0.1100 |
$0.1200 |
$0.1500 |
| 38 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 105 | SD |
$15.00 |
$10.00 |
$11.55 |
$15.00 |
| 39 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 105 | SD |
$20.00 |
$26.25 |
$28.88 |
$30.00 |
| 40 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 2,587.5 | LF |
$20.00 |
$25.00 |
$16.56 |
$30.00 |
| 41 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 2,325 | LF |
$4.00 |
$2.00 |
$1.60 |
$10.00 |
| 42 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$4,900.00 |
$29,000.00 |
$2,756.25 |
$25,000.00 |
| 43 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 217 | SD |
$10.00 |
$11.00 |
$10.50 |
$15.00 |
| 44 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$164,345.05 |
$145,529.14 |
$180,187.00 |
$210,000.00 |