| 1 | 221(C) 2801 |
TEMPORARY SILT FENCE | 500 | LF |
$3.00 |
$3.81 |
$1.85 |
| 2 | 230(A) 2806 |
SOLID SLAB SODDING | 500 | SY |
$5.00 |
$5.17 |
$5.00 |
| 3 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 500 | TON |
$150.00 |
$107.81 |
$325.00 |
| 4 | 412 5267 |
COLD MILLING PAVEMENT | 1,885 | SY |
$8.00 |
$9.08 |
$10.50 |
| 5 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 90 | SY |
$50.00 |
$22.90 |
$25.00 |
| 6 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 600 | LF |
$50.00 |
$4.95 |
$3.60 |
| 7 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 387.5 | LF |
$20.00 |
$17.25 |
$18.15 |
| 8 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,400.00 |
$2,103.38 |
$2,192.25 |
| 9 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,900.00 |
$1,700.81 |
$1,788.64 |
| 10 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 170 | CY |
$25.00 |
$40.00 |
$19.50 |
| 11 | 501(G) 6309 |
CLSM BACKFILL | 170 | CY |
$170.00 |
$200.00 |
$167.50 |
| 12 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$8,000.00 |
$12,183.60 |
$15,500.00 |
| 13 | 504(A) 1304 |
APPROACH SLAB | 457 | SY |
$300.00 |
$250.00 |
$205.00 |
| 14 | 504(B) 1305 |
SAW-CUT GROOVING | 1,637.2 | SY |
$5.00 |
$3.62 |
$3.75 |
| 15 | 504(C) 6250 |
SEALED EXPANSION JOINT | 109.2 | LF |
$300.00 |
$300.00 |
$304.00 |
| 16 | 504(E) 6190 |
42" F-SHAPED PARAPET | 773 | LF |
$120.00 |
$125.00 |
$122.00 |
| 17 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 180 | LF |
$35.00 |
$30.00 |
$40.00 |
| 18 | 506(A) 1322 |
STRUCTURAL STEEL | 630 | LB |
$8.00 |
$7.35 |
$8.00 |
| 19 | 509 6153 |
SPECIAL CONCRETE FINISH | 1 | LSUM |
$90,000.00 |
$44,344.52 |
$79,000.00 |
| 20 | 509(A) 1326 |
CLASS AA CONCRETE | 335.4 | CY |
$1,000.00 |
$840.00 |
$990.00 |
| 21 | 509(D) 1331 |
CLASS C CONCRETE | 14 | CY |
$600.00 |
$1,675.00 |
$612.50 |
| 22 | 510(C) 6138 |
SLOPE WALL (5") | 2,220 | SY |
$120.00 |
$220.00 |
$110.00 |
| 23 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 116,820 | LB |
$1.10 |
$1.00 |
$1.09 |
| 24 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$50,000.00 |
$45,198.60 |
$50,000.00 |
| 25 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$10,000.00 |
$8,653.13 |
$9,500.00 |
| 26 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 685 | SY |
$5.00 |
$3.41 |
$3.85 |
| 27 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 234 | LF |
$50.00 |
$31.95 |
$33.00 |
| 28 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 21 | GAL |
$150.00 |
$53.25 |
$55.00 |
| 29 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 66 | SY |
$850.00 |
$721.01 |
$753.50 |
| 30 | 523(A) 6550 |
SEALER CRACK PREPARATION | 115.2 | LF |
$5.00 |
$4.26 |
$4.40 |
| 31 | 523(B) 6560 |
SEALER RESIN | 2 | GAL |
$150.00 |
$159.75 |
$150.00 |
| 32 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 66 | SY |
$50.00 |
$51.12 |
$60.50 |
| 33 | 535 6780 |
ORNAMENTAL MEDALLION | 2 | EA |
$15,000.00 |
$15,000.00 |
$13,250.00 |
| 34 | 542 4600 |
(PL)INSTALLATION OF BRIDGE ITEMS | 1 | LSUM |
$15,000.00 |
$12,151.65 |
$12,500.00 |
| 35 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$150,000.00 |
$156,500.00 |
$240,000.00 |
| 36 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 2,903 | LF |
$2.20 |
$1.64 |
$1.72 |
| 37 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 200 | SD |
$2.00 |
$2.13 |
$5.00 |
| 38 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 8,400 | SD |
$0.5000 |
$0.0500 |
$0.1000 |
| 39 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 6,200 | SD |
$0.7500 |
$0.1100 |
$0.1500 |
| 40 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,700 | SD |
$2.00 |
$0.1100 |
$0.1000 |
| 41 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 4,000 | SD |
$1.00 |
$3.20 |
$3.30 |
| 42 | 880(C) 8848 |
WING BARRICADES | 400 | SD |
$1.50 |
$0.3700 |
$0.3700 |
| 43 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 10,900 | SD |
$0.3000 |
$0.2700 |
$0.3000 |
| 44 | 880(F) 8878 |
DRUMS | 9,500 | SD |
$0.2500 |
$0.5300 |
$0.6500 |
| 45 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 100 | HOUR |
$100.00 |
$68.09 |
$77.00 |
| 46 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 500 | SD |
$30.00 |
$6.39 |
$10.00 |
| 47 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$7,242.00 |
$7,500.00 |
| 48 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$110,000.00 |
$120,000.00 |
$115,000.00 |