| 1 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 60 | SD |
$19.00 |
$64.13 |
$50.00 |
$58.00 |
$50.00 |
| 2 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 60 | SD |
$7.35 |
$1.28 |
$5.00 |
$2.25 |
$1.00 |
| 3 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 360 | SD |
$0.3000 |
$1.28 |
$0.8500 |
$0.6000 |
$0.1000 |
| 4 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 120 | SD |
$0.6500 |
$2.57 |
$0.9000 |
$1.50 |
$0.2000 |
| 5 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 600 | SD |
$1.50 |
$3.85 |
$3.40 |
$3.70 |
$5.00 |
| 6 | 880(C) 8848 |
WING BARRICADES | 240 | SD |
$1.30 |
$3.85 |
$1.00 |
$1.20 |
$2.00 |
| 7 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 480 | SD |
$0.3000 |
$1.28 |
$0.3000 |
$2.35 |
$0.0500 |
| 8 | 880(F) 8878 |
DRUMS | 600 | SD |
$0.2500 |
$0.7100 |
$0.5000 |
$0.6500 |
$0.1000 |
| 9 | 880(G) 8890 |
CHANNELIZER CONES | 3,000 | SD |
$0.3000 |
$0.7100 |
$0.3600 |
$0.6500 |
$0.1000 |
| 10 | 880(I) 8902 |
FLAGGER | 60 | SD |
$153.60 |
$175.00 |
$110.00 |
$170.00 |
$400.00 |
| 11 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 148 | SD |
$10.70 |
$32.07 |
$25.00 |
$24.00 |
$25.00 |
| 12 | 804(A) 2915 |
STRUCTURAL CONCRETE | 0.4 | CY |
$541.40 |
$320.68 |
$240.00 |
$452.50 |
$2,000.00 |
| 13 | 804(B) 2916 |
REINFORCING STEEL | 48 | LB |
$1.50 |
$3.85 |
$0.7000 |
$2.25 |
$5.00 |
| 14 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 16 | SF |
$22.45 |
$19.24 |
$8.00 |
$34.00 |
$25.00 |
| 15 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 33 | LF |
$10.55 |
$25.65 |
$12.00 |
$13.60 |
$15.00 |
| 16 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 19,450 | LF |
$0.5500 |
$0.5800 |
$0.4200 |
$0.6000 |
$1.00 |
| 17 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 18,950 | LF |
$0.2500 |
$0.5900 |
$0.0500 |
$0.4500 |
$1.00 |
| 18 | 890 7700 |
(PL)TRAFFIC ITEMS | 1 | LSUM |
$1,200.00 |
$2,565.32 |
$2,740.00 |
$5,090.00 |
$5,000.00 |
| 19 | 209 0120 |
MACHINE GRADING | 5,085 | LF |
$8.00 |
$5.00 |
$20.00 |
$22.65 |
$65.00 |
| 20 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,000 | LF |
$1.50 |
$3.53 |
$1.09 |
$3.20 |
$5.00 |
| 21 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,000 | LF |
$7.10 |
$8.02 |
$7.09 |
$9.05 |
$8.00 |
| 22 | 230(A) 2806 |
SOLID SLAB SODDING | 2,828 | SY |
$1.35 |
$3.50 |
$2.95 |
$3.40 |
$5.00 |
| 23 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 847.46 | TON |
$110.00 |
$95.00 |
$88.00 |
$133.00 |
$140.00 |
| 24 | 509(A) 0319 |
CLASS AA CONCRETE | 30.94 | CY |
$600.00 |
$550.00 |
$600.00 |
$250.00 |
$400.00 |
| 25 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 1 | EA |
$1,160.00 |
$3,847.98 |
$1,200.00 |
$1,700.00 |
$3,000.00 |
| 26 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 2,700 | LF |
$4.20 |
$3.85 |
$3.87 |
$2.25 |
$5.00 |
| 27 | 619(C) 0924 |
SAWING PAVEMENT | 5,085 | LF |
$2.75 |
$2.75 |
$2.75 |
$3.40 |
$2.00 |
| 28 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 3,750 | LF |
$18.80 |
$19.00 |
$19.91 |
$20.55 |
$28.00 |
| 29 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 3 | EA |
$839.80 |
$1,282.66 |
$1,981.00 |
$685.00 |
$1,000.00 |
| 30 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 9 | EA |
$2,800.00 |
$2,400.00 |
$3,877.00 |
$2,190.00 |
$4,000.00 |
| 31 | 628(B) 5125 |
HIGH-TENSION CABLE BARRIER(TL-4) | 1,275 | LF |
$10.05 |
$20.00 |
$12.91 |
$27.00 |
$15.00 |
| 32 | 628(C) 5110 |
END ANCHORS | 6 | EA |
$2,545.60 |
$1,763.66 |
$8,528.00 |
$1,900.00 |
$3,000.00 |
| 33 | 628(E) 5175 |
CABLE BARRIER TENSION METER | 1 | EA |
$1,000.00 |
$4,104.51 |
$3,200.00 |
$4,045.00 |
$2,500.00 |
| 34 | 853 9066 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 84 | EA |
$13.20 |
$12.83 |
$11.21 |
$10.00 |
$10.00 |
| 35 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$30,000.00 |
$1,200.00 |
$11,450.00 |
$3,000.00 |
| 36 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$1,000.00 |
$1,200.00 |
$2,500.00 |
$13,170.00 |
$3,000.00 |
| 37 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$36,250.00 |
$40,000.00 |
$49,736.76 |
$40,575.00 |
$85,000.00 |