| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$40,000.00 |
$6,000.00 |
$14,000.00 |
| 2 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,000 | LF |
$3.00 |
$1.55 |
$2.50 |
$3.35 |
| 3 | 221(F) 0100 |
TEMPORARY SILT DIKE | 200 | LF |
$9.00 |
$6.57 |
$3.00 |
$11.25 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 1,800 | SY |
$3.00 |
$3.70 |
$3.00 |
$3.75 |
| 5 | 233(A) 2817 |
VEGETATIVE MULCHING | 0.37 | AC |
$1,000.00 |
$3,404.41 |
$1,000.00 |
$3,500.00 |
| 6 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 40 | CY |
$50.00 |
$110.00 |
$79.00 |
$69.00 |
| 7 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 875.14 | TON |
$30.00 |
$22.94 |
$29.00 |
$32.50 |
| 8 | 407(B) 0250 |
TACK COAT | 2,668.67 | GAL |
$4.00 |
$2.00 |
$3.00 |
$2.75 |
| 9 | 408 5774 |
PRIME COAT | 725.12 | GAL |
$7.00 |
$1.50 |
$5.00 |
$9.00 |
| 10 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 11.16 | TON |
$200.00 |
$155.00 |
$500.00 |
$250.00 |
| 11 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 5,319.33 | TON |
$80.00 |
$61.00 |
$81.00 |
$79.80 |
| 12 | 509(D) 0325 |
CLASS C CONCRETE | 20.77 | CY |
$500.00 |
$475.00 |
$450.00 |
$775.00 |
| 13 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 89 | LF |
$80.00 |
$88.00 |
$104.00 |
$116.00 |
| 14 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 35 | LF |
$150.00 |
$177.02 |
$175.00 |
$165.00 |
| 15 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 488 | LF |
$32.00 |
$27.99 |
$49.00 |
$50.00 |
| 16 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 40 | LF |
$45.00 |
$90.06 |
$50.00 |
$75.00 |
| 17 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 32 | EA |
$500.00 |
$204.49 |
$250.00 |
$1,300.00 |
| 18 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 6 | EA |
$650.00 |
$735.34 |
$1,000.00 |
$1,600.00 |
| 19 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$900.00 |
$1,431.07 |
$1,500.00 |
$2,400.00 |
| 20 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$18,500.00 |
$8,800.00 |
$11,000.00 |
| 21 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 150 | SY |
$5.00 |
$25.00 |
$33.00 |
$36.50 |
| 22 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 400 | LF |
$22.00 |
$32.00 |
$20.50 |
$21.00 |
| 23 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 8 | EA |
$1,000.00 |
$804.68 |
$1,050.00 |
$1,100.00 |
| 24 | 629(C) 4960 |
MAILBOX | 13 | EA |
$100.00 |
$61.90 |
$55.00 |
$80.00 |
| 25 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 13 | EA |
$250.00 |
$185.70 |
$165.00 |
$175.00 |
| 26 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 87.25 | SF |
$25.00 |
$14.86 |
$13.20 |
$16.00 |
| 27 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 128 | LF |
$12.00 |
$12.38 |
$11.00 |
$11.50 |
| 28 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 44,283 | LF |
$0.5200 |
$0.3700 |
$0.3600 |
$0.4000 |
| 29 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$15,000.00 |
$5,000.00 |
$2,420.00 |
$16,700.00 |
| 30 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$9,000.00 |
$10,200.00 |
$10,000.00 |
| 31 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$55,000.00 |
$40,000.00 |
$14,300.00 |
$52,000.00 |