GRADE, DRAIN, AND SURFACE - DIVISION VI COUNTY ROAD (NS-13): FROM 6.0 MILES NORTH OF US-64 WEST OF BOISE CITY , EXTEND NORTH . PROJECT LENGTH = 5.548 MILES

Let date
Thursday, May 21, 2015
Contract
150158
J/P numbers
24825(08)
District
Division 6
County
Cimarron
Highway
Limits
GRADE, DRAIN, AND SURFACE - DIVISION VI COUNTY ROAD (NS-13): FROM 6.0 MILES NORTH OF US-64 WEST OF BOISE CITY , EXTEND NORTH . PROJECT LENGTH = 5.548 MILES
Project number
CIRB-213C(003)RB

Bidders 2

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$3,719,556
1 J & R SAND COMPANY, INC. Low bidder $3,480,566 -6.4%
2 HIGHWAY CONTRACTORS, INC. $3,847,961 +3.5% +10.6%

Bid tab: unit prices 23 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 J & R SAND COMP…#2 HIGHWAY CONTRAC…
1202(H) 0185 EARTHWORK1LSUM $44,000.00 $36,000.00 $50,000.00
2221(C) 2801 TEMPORARY SILT FENCE200LF $2.75 $1.43 $1.43
3221(F) 0100 TEMPORARY SILT DIKE168LF $8.68 $8.44 $8.44
4230(A) 2806 SOLID SLAB SODDING22,950SY $3.18 $3.22 $3.22
5233(A) 2817 VEGETATIVE MULCHING4AC $888.00 $588.00 $888.00
6307(E) 4240 CEMENTITIOUS STABILIZED SUBGRADE86,149.87SY $5.00 $4.50 $7.32
7311(D) 0154 PROCESSING EXISTING BASE & SURFACE, METHOD D29,519.53LF $6.50 $6.80 $7.65
8402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E285.5TON $51.00 $49.50 $51.00
9407(B) 0250 TACK COAT5,929.87GAL $2.80 $2.70 $3.25
10408 5774 PRIME COAT30,152.45GAL $3.70 $3.50 $3.75
11411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)17,837.99TON $93.50 $87.50 $88.42
12411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)8,919TON $97.50 $98.00 $89.89
13509(D) 0325 CLASS C CONCRETE10CY $325.00 $400.00 $325.00
14613(A) 4497 36" X 22" R.C.PIPE ARCH CLASS A-III200LF $120.00 $150.00 $120.00
15613(L) 4526 36" X 22" PREFAB. CULVERT END SECTION, ARCH10EA $1,200.00 $1,500.00 $2,000.00
16619(C) 0924 SAWING PAVEMENT267LF $3.50 $3.00 $3.50
17850(A) 8110 SHEET ALUMINUM SIGNS66.14SF $41.00 $90.00 $90.00
18856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)22,282LF $0.6000 $0.6300 $0.6300
19856(B) 8525 TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.)14EA $210.00 $125.00 $125.00
20880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $25,000.00 $21,600.00 $36,572.00
21642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $16,000.00 $20,000.00 $20,000.00
22220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $4,000.00 $4,500.00 $10,000.00
23641 1552 MOBILIZATION1LSUM $190,000.00 $90,000.00 $200,000.00