| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$70,420.00 |
$17,000.00 |
$20,000.00 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,813 | CY |
$11.48 |
$21.00 |
$22.65 |
$30.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$25,000.00 |
$5,000.00 |
$16,400.00 |
$25,000.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 7,121 | LF |
$1.46 |
$2.45 |
$1.40 |
$3.00 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 392 | LF |
$8.49 |
$12.00 |
$8.50 |
$12.50 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 21,095 | SY |
$1.70 |
$1.48 |
$1.40 |
$3.20 |
| 7 | 230(F) 2812 |
WATERING | 844 | KGAL |
$6.91 |
$5.20 |
$9.05 |
$12.50 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 5 | AC |
$700.00 |
$500.00 |
$115.00 |
$625.00 |
| 9 | 241 2832 |
MOWING | 13 | AC |
$77.84 |
$105.00 |
$22.50 |
$125.00 |
| 10 | 613(B) 5739 |
84" CORR. GALV. STEEL PIPE | 32 | LF |
$185.00 |
$160.00 |
$320.00 |
$200.00 |
| 11 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 9,399 | LF |
$22.00 |
$12.08 |
$18.20 |
$18.00 |
| 12 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 39 | EA |
$1,000.00 |
$676.00 |
$570.00 |
$600.00 |
| 13 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 39 | EA |
$2,500.00 |
$1,579.00 |
$2,170.00 |
$2,285.00 |
| 14 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 3 | EA |
$1,800.00 |
$1,367.00 |
$1,570.00 |
$1,650.00 |
| 15 | 623(J) 8572 |
CURVED APPROACH GUARDRAIL | 10 | EA |
$2,225.00 |
$824.00 |
$625.00 |
$2,000.00 |
| 16 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 8 | EA |
$76.60 |
$80.00 |
$115.00 |
$125.00 |
| 17 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 1 | EA |
$162.68 |
$120.00 |
$230.00 |
$250.00 |
| 18 | 629(C) 4960 |
MAILBOX | 13 | EA |
$30.30 |
$25.00 |
$60.00 |
$50.00 |
| 19 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 9 | EA |
$13.89 |
$35.00 |
$60.00 |
$25.00 |
| 20 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,260 | SD |
$0.2500 |
$0.2500 |
$1.20 |
$0.1000 |
| 21 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 360 | SD |
$0.7000 |
$0.2500 |
$2.35 |
$0.5000 |
| 22 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 540 | SD |
$1.25 |
$5.00 |
$4.00 |
$5.00 |
| 23 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 360 | SD |
$0.5000 |
$1.00 |
$3.40 |
$2.00 |
| 24 | 880(C) 8848 |
WING BARRICADES | 360 | SD |
$0.9500 |
$0.5000 |
$2.25 |
$2.00 |
| 25 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 1,260 | SD |
$0.2500 |
$0.0500 |
$1.20 |
$0.2000 |
| 26 | 880(F) 8878 |
DRUMS | 900 | SD |
$0.2500 |
$0.2000 |
$1.20 |
$0.1000 |
| 27 | 880(G) 8890 |
CHANNELIZER CONES | 900 | SD |
$0.3500 |
$0.5000 |
$1.20 |
$0.1000 |
| 28 | 880(I) 8902 |
FLAGGER | 90 | SD |
$105.00 |
$145.00 |
$115.00 |
$200.00 |
| 29 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 416 | SD |
$13.00 |
$5.00 |
$30.00 |
$25.00 |
| 30 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 33.66 | SF |
$17.50 |
$21.50 |
$17.00 |
$25.00 |
| 31 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 62 | LF |
$8.00 |
$10.00 |
$13.60 |
$15.00 |
| 32 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 56 | LF |
$18.00 |
$8.00 |
$34.00 |
$30.00 |
| 33 | 855(B) 8821 |
TRAFFIC STRIPE(PLASTIC)(WORDS) | 2 | EA |
$225.56 |
$1,200.00 |
$170.00 |
$375.00 |
| 34 | 890 7700 |
(PL)TRAFFIC ITEMS | 1 | LSUM |
$27,550.00 |
$1,400.00 |
$6,800.00 |
$20,000.00 |
| 35 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$16,500.00 |
$2,500.00 |
$11,350.00 |
$15,000.00 |
| 36 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,000.01 |
$10,000.00 |
$2,545.00 |
$3,000.00 |
| 37 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$50,000.00 |
$47,800.00 |
$45,250.00 |
$45,000.00 |